You are on page 1of 53

THE BHOPAL SCOOL OF SOCIAL SCEINCES

Job oriented Project Report

B.A.Management 6th semester Academic year 2011-2012

In partial fulfillment of B.A.Management Degree Submitted to, Barkatullah University Bhopal

Guided by, Mrs. Manish Punthambekar

Prepared and submitted by, Gaurav Charadia B.A. Management

Index

Sr.no 1 2 3 4 Acknowledgement Declaration Introduction

Contents

Page No. 3 4 5 6 - 11

Section A Strength, weaknesses, opportunities and challenges Participation in college activities Facilities and guide during projects Examination results Section B Details of work done in previous semesters Names and details of org. surveyed during internship Information gathered and received Section C Useful and Beneficial organization Details of Current visits and information gathered Section D Self - assessment Evidences of improvement in skills

12 32

33 36

37

Acknowledgement

Let me take this opportunity to express my gratitude for all those people who has played a significant role and have helped this internship see the light of day. Firstly, I would like to express deep sense of gratitude to the Director and the administration of The Bhopal Ica institute of Social Sciences, for providing me the conductive atmosphere in the college. Their dedication and encouragement that they have shown towards our growth has been greatly felt and appreciated. I am especially grateful to my Sir. In-charge and guiders Mr. Manish Punthambekar and all the past guides, Department of Management, who devoted their precious time to help me to make these Reports. Their guidance and support has been a forte in the trying times of this work. They were always there for me whenever I needed guidance. I would like to express my appreciation to my friends and companions-who have contributed to the successful completion of the projects reports as well as for their support and understanding through the long days and busy phone lines. Last but not the least; I would also like to wish all those people who have directly and indirectly helped me during all previous project reports. With each and every help that Ive received, Ive brought this projects into fruition.

Gaurav Charadia
3

Declaration

I, Gaurav Charadia, student of B.A. Management 6th Semester of The Bhopal Ica institute of Social Sciences, affiliated to the Barkatullah University, Bhopal, (M.P) do hereby declare that the project which is prepared as per the format has been carried out by me under the supervision of Mr. Manish Punthambekar towards partial fulfillment of the requirement for B.A.Management 6th semester for the academic session April 2012

Gaurav Charadia B.A.Management

Introduction

In this fast growing world with deflating job and rising unemployment ,where quality is been questioned at every level, a student is needed to be fully equipped for each job that he wants to take up in future. Thus specialization has become important need of the hour. Targeting your future goals is essential in order to grasp and capture everything which is part and parcel of any particular task or post. At graduation level where a student begins his proper specialization in his studies, it is must that he/she aims a particular area of interest and work upon it, this project report and self-employment has made sincere students very focusing, concentrative and knowledgeable. Projects and study on interested subjects have initiated a lot of interest and focus in the minds of students; it has made them aware of the availabilities of the jobs in society. Suppose my favorite subject is human resource management, naturally my project will reflect this interest and motivate to gain more and more knowledge during my research. This work has developed the thinking power, writing skill language of the students. It has helped to correlate theory and practical aspects and application. The work of project report has initiated future planning in students. I am happy that it has done so with me in my three years of graduation and helped me to find out my future job skills in order to carry it out in a smooth way.

Section A Detailed evaluation of semester pattern Strengths In the semester pattern the studies of one whole year are divided into two parts of six months, subject and syllabus is elaborated and made easy for the students to study and understand it separately. In fact it is a standard pattern of studies because it separates each and every topic individually. Its application and relation with other subjects can be easily correlated. It has not produced much idle time rather kept the students busy with its different activities like practicals, CCE, viva, internal & external exams and stressed much on regularity and discipline. It has brought lot of interest in students to be innovative, creative and enthusiastic. Because of the division in the syllabus the portion for each semester is being minimized which help students to prepare for exams well. When this system is effectively organized, it will a great scope in coming years it is more so when the collage is autonomous and in case of university provided that all the responsibilities by the university are done in very organized way The greatest advantage of this system is that it reduces the load on the students and Inculcates regular study habits. 2. Since academic year is divided into 2 semesters it provides upward mobility - the Student can clear the backlog in one or many subjects even after moving to the next semester. 3. Best part is that it enables the students to learn at their own pace. 4. Well if you compare it to an annual system, it keeps students busy all year round with the same level of burden instead of the piling up of work at the end of the year.
6

5. In semester system, Students are all the time attached to with Studies which are good for the Students. 6. The main advantage of semester system. Student busy all the year. He knows, if he does not study, he will fail. >> Easy learning >> Attach with studies. >> Remain in class>> No absence. >> Grip on knowledge. >> Respect of teachers increases. >> Scheduled work plan on time in a very organized way.

Weaknesses This system has been creating a continuous disturbance in timings and regularity in flow of studies. Since the portion is divided and made into two parts, most of the topics under units get repeated. There has been no organized order of topic under each unit. When speaking particularly on the university in which we are studying has shown weak performance in its initial stages. When we observe and analyze, it is seen that the difficulties are doubled and time t solve them gets reduced. It has brought too much burden on teachers as well as students by making them stressful, disturbing and tiresome. Thus proper planning and organization of the system would be beneficial in years to come. It lacks the recovery that students can make due to limited time, in comparison to Annual systems. Time is too short in Semester system. Students dont understand many chapters. In semester system, students are confined only to their course contents. They do not get time for extensive studies. As a result of this, the knowledge of students becomes restricted, and is limited to a very narrow perspective .Another fault is the course is much short. One is shocked to see that the course the course for a subject in university is much shorter than the course of a subject at secondary level. In the last, semester system is comparatively expensive .Some students cannot bear its expenses and are unable to continue their studies at university level. If you take into account the seasonal exams, semester exams (both theory and practical), the exam itself takes away more than a month from the time allotted for teaching. Burden of staff is increased because they have to attend exams in other Institutes and Universities as external examiners. About syllabus, what the syllabus setter do is to divide the annual syllabus into two halves In the name of semester system, we are blocking the long term memory of the young. In this age of higher learning, the long term memory if
8

sufficiently stimulated will go a long way in their career and in their life. The students have developed the tendency of forgetting/not caring for the knowledge gained in previous semester due to a feeling of those papers are over and they need not recollect any more.

Opportunities With the semester system we have gained and at the same time lost ample of opportunities. Following are some of the opportunities we received through this system: It has helped us to understand the various subjects in detail separately. It has also aided in development of ones self-ideas, opinions and views. To develop speaking and writing skills. Facilitated progress in speaking formal language. The visitations to the various industries, corporations, and outreach programs have widened our practical knowledge. Through the different sessions, seminars, guest lectures, discussions and conclaves it has contributed in building up our intellect. It has increased the confidence in face to face interviews and viva by different external professors. It has given us an opportunity to do self study and research.

Challenges There have been many pleasing and unpleasing challenges we have faced in our semester studies, like: Answering CCEs, practicals, viva and internal and external assessments.

Writing project and internship reports has been a great challenge which was expected of us from time to time. I felt that writing semester exams was also a challenging job because we had to make self notes and study. The semester system is a very proactive system as it engages both the faculty and the students throughout the year in academic activity. While, in the annual system once the student enters the college he feels free and thinks about studying only during the exam time. Semester system not only involves students more throughout the year but also reduces examination burden. The semester system is the need of hour and a very effective one.

Newspapers and journals read; Hindustan Times The Times Of India

The week India Today Outlook Participation in the activities of the college:
10

Departmental Exhibition Mime

Facilities and Teacher / Guide made available by the college during the study: Freedom to clear doubts. Guidance given by the guide in choosing the areas of project study. Application letters and notes were provided. Time to time checking the progress of the project work.

Semester First Second Third Fourth Fifth Sixth

Teacher/Guide incharge Mrs. Priyanka Singh Sir. Manish Punthambekar Miss. Divya Sir. Neeraj Mrs. Geetu Sir. Manish Punthambekar

11

Examination Result Ist to Vth semester: (With copy of mark sheets attached)

Sr.no

Name of the Semester First

Marks Obtained 219 210 191 187 311

Maximum Marks 350 350 350 350 450

Result in Percentage 62% 60% 54% 53% 69%

1 Second 2 Third 3 Fourth 4 fifth 5

12

Section-B Details of work done in previous semesters First semester project on ICA institute Bhopal I saw my future works in the ICA BHOPAL. 102, 2ND FLOOR, ABOVE BRITISH LIBRARY, G.T.B. COMPLEX, NEW MARKET BHOPAL, When I began my studies in the same faculty I had a subject the essential elements of management in which I studied the functions of management that is planning, organizing, directing, decision making and controlling. These contributed in understanding the project work and what it aims for. Mrs. Priyanka Singh mam, who was my guide, explained me the procedures and key factors of the project work. And as a first step I chose ICA BHOPAL. as my organization to work upon the above topic. I visited the institute quit often and observed its various functions on the chosen topic and noted down the points and some of the information was gathered through consulting the administrative department. I found that the study on committees, teams, and group decision making was relevant attempt in the ICA BHOPAL. And this study wasnt an individual area rather a broad aspect. Then I moved on to the study on the selection of director, who was the manager of committees, teams and groups. it is here that my study was made apparent and realistic. There are several committees, which facilitate in major functioning of institute , they remain stable for the whole academic year. Following are some of the committees: Academic committee Cultural committee

13

Sports committee Discipline committee Examination committee

Each of the committees has their own duties and rights to perform and they keep consulting the director or manager to update the policies, programs and evaluation of performance. It is an obligation of the director to direct the members in fulfilling the plans. There is a close contact between the director and the committees in the hierarchy of the ICA institute management, since it is the first level of organization where all activities are planned and executed. Planned and unplanned teams are another form of grouped people to perform a specific task. When any unforeseen event, programme, investigation or survey and in any other emergencies arise the formation of teams are of great help. The director chooses the members with the due consultation, and keeping in mind their ability to carry out the task effectively. He is the source of guidance till the work is completed. Performance appraisal is also another method to rectify the errors and to do better in future. When it comes to taking major decisions, the director all alone cannot decide, he is bound to take the consent of his council and other members of the organizations like administrative manager and financial manager. Based on their opinion on a particular issue which is to be decided, the director takes further measures and ends up the same. Therefore director has a great responsibility to consult and gather different opinions. After a proper discussion and analysis the suitable decision will be taken. It was a challenging job to make a study on the above topic, because without proper observation one would not find the methods and policies existing in that organization. It was a new experience and developed my thinking and writing capacity, and was able to present my views and ideas.
14

Second Semester project on energy audit of HEG ltd, Bhopal. Executive summary Introduction- manufacturing unit of Hindustan electro graphite ltd, LNJ bhilwara group, by the energy & resourcrs institute, to study the present energy consumption scenario and to identify energy saving opportunities in various energy sonsuming system .A brief summary of the recommendations in each area is given in the following section. Electrical system- electricity for HEG ltd, comes from their own captive power plant and hydro power plant ans state electricity board. The vaptive power plant has an installed capacity of 64 mw with two turbo genetator sets of 31 mw each ans a hydropower plant has 2 x 6.75 mw installed capacity. The annual average demand of the plant is about 32.25 mw which is varies from 27.2 mva to 53.7 kva with maximum energy consumption in the month of sep. 2008 and minimum(16.2 million kwh) in the month of feb 2009. Steam generators,steam traps ans insulation-the plant is equipped wit thw no. of oil fired process boilers. Performance of one boiler was tested during the energy audit.dased in the long duration boiler operation at 9.25 kg/gm 2.g steam pressure , the major observation ans recommendation are given below. By optimising the excess air at 3.5% oxygen level, the thermal efficiency of boiler #1 will be improved by about 0.5%. This corresponds to annual FO saving of 3.3 T (3.45 kL).
15

1.0 Introduction manufacturing unit of Hindustan Electro Graphite (HEG) Limited, LNJ Bhilwara group, Mandideep, Madhya Pradesh Limited, LNJ Bhilwara group, Mandideep, Madhya Pradesh by The Energy & Resources Institute (TERI), to study the present energy consumption scenario and to identify energy saving opportunities in various energy consuming systems. A brief summary of the recommendations in each area is given in the following sections. 2.0 Electrical system Electricity for HEG Limited, comes from their own captive power plant and hydro power plant and state electricity board.

The captive power plant has an installed capacity of 64 MW with two turbo generator sets of 31 MW each and a hydropower plant has 2 X 6.75 MW installed capacity. The annual average demand of the plant is about 32.25 MW which is varies from 27.2 MVA (February 2009) to 53.7 kVA (April 2008), with maximum energy consumption in the month of September 2008 (29.66 million kWh) and minimum (16.2 million kWh) in the month of February 2009. The average monthly energy consumption of the HEG limited is estimated to be 24.50 million kWh at average demand of 32.25 MVA. During the energy audit study, the average operating load at main incomer feeder (CPP) was 19.03 MW at 0.927 power factor. The load at feeder varies from 8.78 MW to 27.58 MW in the daily pattern of plant. The average plant load factor of generation is estimated to be 90.5% during the month Nov 2009. The auxiliary power consumption (APC) of the plant is approximate 5.89 MW which is 10.16% of the generation, which
16

is comparable to the c/p/p of the similar size (10.35). Graphite manufacturing unit is consuming about 52% of the total energy generation from CPP whereas about 48% has exported to the state electricity board. It has been observed that most of the transformers are loaded near to design and the operating with optimum losses at designed power factor. Plant has 6 graphite manufacturing furnaces and it is estimated that the graphitization consume approximate 84 % of the total energy consumption whereas rest 16% consumption in the used in plant utility and auxiliaries section. Graphite hall 6 is operating most of the time and consuming about 42% of the total energy consumed in the plant. In LT distribution system, the line voltage drop is very significant at far end. High drop in supply voltage may lead to higher line losses which may reach even 3% of the load power. It is recommended to improve the supply voltage to rated (415 volt) by applying the online tap changer and automatic power factor controller. 3.0 Steam generators, steam traps and insulation The plant is equipped with two numbers of oil fired process boilers. Performance of one boiler (#1) was tested during the energy audit. Based on the long duration boiler operation at 9.25 kg/cm 2 g steam pressure , the major observations and recommendations are given below: The dry flue gas loss is the highest loss among the all losses calculated for boiler #1 (table 3.3.3). Major factors contributing to this loss and optimisation of these can substantially reduce it. These factors are (i) excess air level and (ii) flue gas temperature. By optimising the excess air at 3.5% oxygen level, the thermal efficiency of boiler #1 will be improved by about 0.5%. This corresponds to annual FO saving of 3.3 T (3.45 kL). The corresponding monetary value in boiler #1
17

will be Rs. 0.8 lacs. It is also recommended to maintain the flue gas temperature of boiler #1 at 1600C in order to maintain the thermal efficiency at optimum level. This will further reduce the dry flue gas loss by 4.03%. The corresponding annual savings will be 25.9 T (27.0 kL) of Furnace oil (FO) or Rs. 6.3 lacs. It is recommended to install FO flow meter and steam flow meter with the boiler. It is also recommended to clean the scales on the outside of tubes and the burner during shut down of boilers to maintain their flue gas temperature at the optimum level 1600C. The cost on account of above is estimated to be about 3.0 lacs. Improving the existing insulation up to the optimum level in the boiler #1 will lead to an annual saving of approximately Rs 0.35 lakh. Investment required on account of insulating steam boiler will be marginal. It is recommended to connect the additional pipelines and pressure powered pump to increase the condensate recovery (from 65% to 95%). The annual monetary savings would be Rs. 1.0 lacs. Out of 14 traps checked, four traps were found to be not functioning properly. Few traps were found to be bypassed from the steam heated equipment/ machines. It is recommended to replace the faulty traps with new ones.

Details about the energy performance assessment of steam generator and steam traps are discussed in chapter 3 of this report.

4.0 Hot oil boilers (HOBs) or thermic fluid heaters The plant is equipped with the eleven (11) oil (LDO) fired heavy duty hot oil boilers (HOBs)/ thermic fluid heaters (thermopacs). Performance of nine (9: 2 in GEP, 3 in FI & 4 in NCI) HOBs is tested during the energy audit. The major observations and recommendations are given below:
18

The dry flue gas loss is the highest loss among the all losses in HOBs. There are two factors contributing to this loss, which may be optimised to reduce this loss substantially. These factors are (i) excess air level and (ii) flue gas temperature. By optimising the excess air in the practical range of 2-3% O2 (or easily achieved level 2.50% with fine tuned modulation unit in AO 6.4) level, the thermal efficiency of HOB 06/ 14, 06/ 15, AO 6.2, AO 6.5, 07/18, 07/ 19, 07/ 20, 07/ 12 will be improved by about 5.47%, 4.15%, 3.82%, 0.04%, 11.43%, 12.26%, 16.61% and 4.43% respectively. These correspond to annual LDO saving of 10.33 T (12.0 kL), 7.81 T (9.08 kL), 16.9 T (19.6 kL), 3.30 T (3.84 kL), 55.1 T (64.1 kL), 59.3 T (68.9 kL), 80.8 T (93.9 kL) and 20.7 T (24.1 kL) respectively. It is also recommended to optimise/ maintain the flue gas temperature of HOBs at 170-1750C in order to maintain the thermal efficiency at optimum level. This will further reduce the dry flue gas loss in HOB 06/ 14, 06/ 15, AO 6.2, AO 6.4, AO 6.5, 07/18, 07/ 19, 07/20, 07/ 12 by 1.46%, 1.22%, 5.95%, 3.24%, 3.53%, 7.33%, 7.56%, 7.90% and 5.12% respectively. The corresponding annual LDO savings will be 2.90 T (3.37 kL), 2.42 T (2.81 kL), 25.72 T (29.91 kL), 2.82 T (3.27 kL), 7.21 T (8.38 kL), 34.7 T (40.3 kL), 35.8 T (41.6 kL), 37.7 T (43.8 kL) and 23.8 T (27.7 kL) respectively.

It is recommended to clean soot periodically, install the heat recovery unit (HRU) with HOBs in NCI and operate HRU regularly at the highest efficiency. Based on the 1st successful HRU installation/ demonstration in NCI, one HRU should be installed with the HOB AO 6.2 also. It is also suggested to get the ducts/ coils cleaned during the HOBs shut down, in order to avail the benefit of faster heating of fluid/ lower FGs temperature. It is suggested to calibrate the it, make it a regular practice to the O2 online analyser with burner plus O2 analyser installation in existing portable O2 analyser and use check/ record O2% in the FGs or install modulation unit. The modulation unit the HOBs would result in additional
19

energy saving corresponding to the O2 reduction in FGs from the 6.2511.65 percent to 2-3 percent. Moderate investment would be required for implementation of the proposal. Most of the above recommendations (except HRU installation) are routine maintenance practices and hence the cost on account of above in 9 HOBs is estimated to be about 8/9 lacs. Apply the low emissivity aluminium paint on the external surface of the HOBs Details about the energy performance assessment of HOBs are discussed in chapter 4 of this report.

5.0 Ring pit baking (RPB) furnaces The plant is equipped with the four (4) Ried Hammer (RH) manufactured (direct) oil (FO) fired large and heavy duty close type ring pit (green electrode/ GE) baking furnaces. The GEs (graphite electrodes) are placed in the enclosed space (the pit) and surrounded with the packing material, metallurgical coke (MetCoke). Each GE contains a large quantity of calcined petroleum coke (CPC) and small quantity (about 15% average volume) of coal tar pitch. The actual Volatile Matter (VM) content in the binder pitch/ green electrode is about 45% (by weight). Each RPB furnace (RH #1/ RH #2/ RH #3/ RH #4) is having twenty (20) vertical chambers in two rows of sections. Each row is having one movable type (flexible) manifold/ set of six (6) burners for firing. Performance of four RHs is tested during the energy audit. The major observations and

recommendations are given below:

The dry flue gas loss is the second highest loss among the all the heat distributing components (or losses) calculated for RHs. There are three factors contributing to this heat distribution and optimisation of these would reasonably reduce it. These factors are (i) hot flue gas turbulence level (ii) excess air level and (iii) flue gas temperature.
20

It is recommended to clean the long ducts periodically and operate the tar extraction unit continuously at the optimum efficiency.

6.0 Compressed air system There are twenty one (21 nos.) air compressors of reciprocating and screw types installed in the plant to cater the compressed air requirement of utility & common area, GEP, RH & NRH, Graphite Hall, PFS and NCI in the plant. Out of these, total 10 nos. of operational compressors were monitored for performance evaluation during the energy audit study. The pressure requirement of the compressed air varies in areas and applications. Accordingly, the plant has set the minimum and maximum pressures at 7.1 kg/cm 2 (g) for hall 1 and hall 5, 7.1 for baking hall and 6.5 8.5 for utility and GEP compressors considering the line losses. The volumetric efficiency of all the air compressors was estimated to above the recommended value, 80% but the specific power consumption of most of the compressors was more than the recommended value. It is recommended to plant should clean/replace the filters periodically and prepare a schedule/scheme for regular maintenance of the compressors. It would result in approximate 17921 kWh/year reduction in power consumption. The compressors installed in baking area, hall 1 and hall 5 are designed to 6.9 m 3/min, 6.9 m air delivery using the screwed compression technology. The actual air requirements of these compressors are only 73%, 53%, and 64 % of the design respectively. It is recommended to install the variable frequency drive in one of the compressor. The installation of VFD facilitates to reduce/increase the speed of the compressor as per the plant compressed air requirement. This implementation will save approximate 128431 electrical units per year.

7.0 Pumps and fans

21

7.1 Pumps Pumps are broadly classified as process cooling water pumps, drinking water transfer pumps, over head tank transfer pumps etc. with respect to the application. In Hall no. 1, the actual efficiency of the pump #2 & #3 is about 66 %, and the efficiency of pump #1 & #4 is about 48 to 57 %. Hence, it is recommended to operate pump # 2 & #3, which is more efficient and stop running pump # 1 & #4. By operating higher efficient pumps, the possibility of energy savings would be about 28, 694 kWh/year and its equivalent cost savings about Rs. 1.73 lakh/year with no investment. In case of Hall no. 2 & 3, combined water flow rate pf cooling system was achieved 269 m3/hr with two pumps, which was delivered about 135 m3/hr (avg) as against designed flow rate of 200 m3/hr. By installing new energy efficient pumps, the plant is expected to maintain the design flow rate with one pump of 200 m3/hr. The possibility of energy saving would be about 1.59 lakh kWh/year with its equivalent cost saving of Rs. 9.56 lakh / year. In order to achieve this saving, the plant has to invest Rs. 96, 000 for installing two new energy efficient pumps which would be paid back with two months.

7.2 Fans The plant has installed induced draft (ID) fan for backing furnaces, duct collector fan, fume extraction fan in various process section like raw material preparation section, green electrodes preparation (GEP) section, impregnation section, baking section and finishing section.

During the study, the static efficiency of DC fan # 1 & # 2 was observed to be 51 % and 28 % respectively, which is very less as compared to the designed efficiency of 81 %. This may be due to choking of dust particle in the bag filters and leakages from the duct connection, which reduces. It is recommended to clean the bag filters and arresting the leakage of air would improve the air volume flow rate of the fan, which helps to increase the efficiency of fan at least by 70 %. The possibility of
22

achievable energy saving is estimated to be 1.09 lakh kWh/year and its equivalent cost saving of Rs. 6.60 lakh/year. For this corrective measure, the investments would be approximately Rs. 75,000, which would be paid back with in two months.

8.0 Refrigeration and air-conditioning system

From the study, it was observed that the plant was not able to achieve the required vacuum pressure during auto clave process due to inadequate cooling capacity to cater the cooling requirement. Currently, the plant is operating one chiller and one stand-by combination. Hence, it is recommended to operate two chillers in place of one as a short term measure. But as a long term measure, there is a need measure. But as a long term measure, there is a need to install two higher capacity of (screw) chillers (one operating and one stand by), which would increase the energy consumption. The area of the manufacturing plant is broadly classified in to administration building area, technical building area, green electrode preparation (GEP) area, product finishing section (PFS) and tunnel kiln area. There are about 255 number of AC units in these areas which has 549 TR of cooling capacity. Among the above areas, the installed capacity of AC units in administration area and technical building area accounts 40 % of the total capacity.

9.0 Electrical motors To evaluate the operational performance of motors and to see how they are loaded, load tests were conducted for 63 motors above 15 kW rating. It has been observed that under-loaded motors i.e. below 40% is few (population is 13%) in the plant. Most of the motors are loaded in the range of 40% to 75% and 75% to 100%.

23

The drives associ ated with water pumps are loaded 49% 95% of the rated capacity. Most of the parallel pumping systems are operating in throttle condition and there is no major difference in energy consumption identified during the 60% valve and 100 %. HEG limited has more than 2400 kW connected load of fans and blowers in the utility section. It is used as induced draft (ID) in baking furnaces, duct collector (DC) fans in processes sections like baking hall, GEP, PFS etc and fume extraction fan in raw material preparation section.

10.0 Electric graphite furnaces The final step in graphite manufacture is a conversion of baked carbon to graphite, called graphitising, i.e. heat- treating the material at temperatures in the region of 2600C 3300C. There are six numbers of electric graphite furnaces installed in graphitization section of HEG limited to facilitate heat treatment of baked electrode. Graphitization is an energy intensive process in a graphite manufacturing unit and consuming more than 84% of the total electrical energy consumption in the plant.

The outside surface temperature of the old type furnace (hall 1) was found to be high. This is mainly because of to electrode is covered by merely met coke whereas in furnace hall 6, electrode is properly covered by refractory which result in very small amount of skin losses.

11.0 Cooling towers Nine cooling towers are installed in the plant catering for Nine cooling towers are installed in the plant catering for the electrodes of rectifier.

24

Three cooling towers are in bad shape and need re- structuring to be done at the earliest. They are cooling tower at Hall No-1, Utility area and Hall No-5. Cooling towers in the area of Graphite furnace Hall No-6 are relatively new and working satisfactorily. Installation of hollow FRP blades in the place of Aluminium blades in the cooling towers will save upto Rs 1.6 lacs with an investment of Rs 1 lac.

12.0 Lighting system Plant has an average consumption of 2418 units per day There is no separate lighting transformer installed in the plant. In the plant about 72 % of the locations were less illuminated than the recommended level as per National Building Code. Most of the process area are under illuminated, which needs to be addressed. Installation of new lighting transformer has potential of savings of 10 lac per anum. It would require an investment of about 12 lacs.

By installing 28 W FTL in the place of 40 W lamps, plant can save up to 5.36 lac per anum. This will need an investment of Rs 5.3lac.

25

Third semester Continuing work in educational institute I drifted on to another ICA BHOPAL. 102, 2ND FLOOR, ABOVE BRITISH LIBRARY, G.T.B. COMPLEX, NEW MARKET BHOPAL run by Society of the missionaries of St. Francis Xavier which has group of catholic priests and brothers who toil to deliver quality education and carry on the work of up building society through educational institutes. This time I was taken up to make a study on financial matters of the ica institute . As efficiency and cost reductions become a focus for ica institute s, effective financial management becomes more and more important. These resources explore opportunities for cutting costs, and provide guidance on how to manage budgets effectively. Ica institute financial management comprises the planning and implementation of a financial plan, accounting, reporting and the protection of assets from loss, damage and fraud. Ica institute s can regulate their financial management with internal rules. If the ica institute does not have the internal rules, there is a risk that internal controls are not set. The ica institute leader is accountable for setting the internal controls and internal auditing. The main products of financial management are the financial plan and the annual report. The reporting process is closely linked to the planning process, the definition of objectives and measuring
26

Head teachers, ica institute bursars and finance managers currently have access to a number of services that help them to manage their ica institute 's finances efficiently, however not all ica institute s are accessing this support and some are not managing their finances as well as they could. This paper investigates what motivates effective financial managers and what would encourage less effective ones.The study made was on financial resources and its uses by highlighting the post of a financial manager. Financial management plays an important role in an organization like blood in a human body. The project exhibited the detailed reports of funds created, sources, and their usage. For the growth of ica institute , the consistency of financial position is must to meet the requirements of the hour, thus increase the quality and standard. The availability of funds on a regular basis would always be of help ups and downs of productivity. Following are the sources of finance in ica institute Donations Fees and fines Fixed deposits Grants from society, etc.

In a same manner there is also a major expenditure like Salaries and allowances Infrastructure expenses Administration expenses Stationary and other petty expenses

The job of the financial manager is to manage the funds available as per the stipulated budget or plan in order to balance flow of the activities. The study detailed about the kinds of funds available and their uses, mainly about responsibilities of the financial manager, some which are discussed below.
27

Preparing the budget, minor financial plans and estimation Arrangement of funds and making them available on time Fixation of fees, fines and other charges Supervision of the infrastructural work Disbursement of finance to respective contractors and other people Preparation and implementation of different salary /incentive schemes Promotional and publicity activities

Financial Report Accounting categories from the accounting report in the financial part are linked to the performance of ica institute tasks. The financial report comprises: - a general part, which contains the presentation of ica institute , its management and important authorities, the presentation of ica institute activities, significances, advantages and weaknesses in comparison with the branch;- a specific part is regulated by an instruction and has to contain all prescribed items, - a conclusion. Rules by chapters do not define accurately the contents and the form of the financial report. A few guidelines are mentioned further on. As required by the Slovenian legislation, the ica institute leader has to produce the proposed annual report to the ica institute council no later than two months after the end of the financial year. The ica institute has to produce the annual report to the organization authorized for processing and publishing information till the 28th of February of the current year at the latest for the past year.

We have pointed out the most important sections of ica institute financial management, which are funded from the national budget effort. The presented guidelines can be also adequately applied by ica institute s that are funded in other manners. The significance of financial plans and annual reports is relatively small and out of proportion regarding the work and the scope of ica institute leader accountability related to them. As professional knowledge of ica institute leaders mostly does not derive from the sector of
28

economy or finances, accounting and auditing, the awareness of ica institute leaders and professional help are even more important, as well as additional trainings and guidelines for the preparation or rules in the abovementioned sectors. The main problems of reporting and planning are the scope and transparency of information as well as non-compliance with the legislation. Therefore we have prepared guidelines for the contents of annual reports and financial plans. Their main link regarding the contents is that the annual report contains information about the realization of the specific part of the financial plan, which should be the base for the preparation of the financial report or for the report on the attained objectives and results. Therefore it would be logical that this part becomes a compulsory element in the financial report.

Fourth semester

Towards the end of my fourth semester again I asked to take the same job, here I came across subject personnel management in which studies were based on its functions. It was here I found my real interested subject and decided to work on the same organization, taking the post of a director as a personnel manager. Issue was recruitment, selection and training of staff in the ICA BHOPAL. 102, 2ND FLOOR, ABOVE BRITISH LIBRARY, G.T.B. COMPLEX, NEW MARKET BHOPAL. Director plays a role of human resources manager, thus all kinds of staff like teaching, non-teaching and domestic are directly under him, therefore the task of their recruitment, assortment, orientation and training decided and undertaken by him alone. In this project of mine I ventured procedure and process of recruitment, selection and training of teaching staff, when the information about the
29

availability of jobs are declared openly, those interested apply and face the interview. Now the job to judge and select applicants who can fulfill the required parameters will be of the director. His priority will be on quality teaching and well conversational skill. The following are the steps which are followed by the director in procurement process Advertisement and public declaration of vacancies for job of teaching Receiving of applications Verification and analysis of the applications Summoning the applicant Interviews and Demonstration methods of testing Evaluation and decisions regarding the applicants Notice of selection Notice of appointment Assignment of work Observation and orientation Training and Development promotions

Each every aspect was discussed in the project report in order to find out responsibilities of the director on this function of procurement. As personnel manager he must be able to deal with applicants in adequate way in search of qualitative people. The productivity will depend upon the kind of people recruited and promoted that is why the part of human recourse manager is indispensable

Guidance and assistance received by the institutes


30

Sr.no 1

Semester First

Name of the surveyed institute Holy Family Sr.Sec.Ica institute

Second

Holy Family Sr.Sec.Ica institute

Third

Fr.Agnel ica institute

Fourth

Fr.Agnel ica institute

Directives and assistance received by the institute Discussion on the hierarchy I was provided with prospectus and handbook Interviews Interviews of teachers Talk with vice-director Comments from teams and committees Issued photocopy of balance sheet and trial balance Discussion with financial manager Analysis of accounts Meet with director(HRM) Prospectus Handbook guidelines Talk with teachers

31

DETAILS OF THE ORGANIZATION VISITED AND BENEFITS GAINED SR.NO DETAILS OF THE INSTITUTION VISITED BENEFITS GAINED Plan and attend official visits Application of theory into practice Gained leadership skill Conducting of group discussions Grasping power Studied formalities Learned different behaviors of different people Methods of management function Formal way of communication Usage of different gestures and expression at different times Grasped the technique of teaching At last learned how to

HOLY FAMILY SR.SEC.ICA INSTITUTE

FR.AGNEL CO-ED ICA INSTITUTE

32

belong to the organization

Detailed Description Internship

A brief summary about the institution Name of the institution Fr. Agnel Co-Ed Ica institute (Affiliated to C.B.S.E. New Delhi)

Institutions mailing address Bypass Road, Near Saint Asaram Ashram, Gondipura P.O. Gandhi Nagar, Bhopal-462030
33

GENERAL INFORMATION

PILAR FATHERS The Society of The Missionaries of St. Francis Xavier, commonly known as Pilar Fathers, is an indigenous society involved in the total upliftment of all men and women without any distinction of cast, color and creed, is engaged basically in educational and medical services at all levels. The Fr. Agnel Group of Institutes is spread all over the country , special in : Goa, Mumbai, Amberrnath, Daman, Nagar Haveli, Punjab, Jammu & Kashmir, Rajasthan, Delhi, Kolkata, Andamans, Orissa, Chhattisgarh, Madhya Pradesh, Chennai, Karnataka, North East and beyond. Fr. Agnel Group of Institutions:
34

Fr. Agnel High Ica institute : Pilar, Goa. Fr. Agnel High Ica institute : Daman, Gujarat Fr. Agnel High Ica institute : Vashi-New Mumbai Fr. Agnel High Ica institute : Silvassa, ,Nagar Haveli Fr. Agnel High Ica institute : Baresia, M.P. Fr. Agnel High Ica institute : New Delhi Fr. Agnel Higher Secondary Ica institute : Pilar, Goa Fr. Agnel Ica institute : Greater Noida Fr. Agnel Ica institute : Bandra Mumbai Fr. Agnel Co. Ed. Sr. Sec. Ica institute : Bhopal, M.P. Fr. Agnel High Ica institute : Amberrnath Fr. Agnel High Ica institute : Verna, Goa Fr. Agnel College of Arts & Commerce: Pilar, Goa Fr. Agnel High Ica institute : Belgaum, Karnataka

AIMS AND OBJECTIVES OF THE SCCHOOL

35

Irrespective of religion, caste and community the ica institute is primarily meant to provide education that is based on some human values, it is meant to prepare them for life, with full respect to freedom to conscience. Besides providing education that is academic in nature, the ica institute also intends to prepare its pupils in cultural, social and physical aspects of life, thus enabling them to face life with greater confidence. WISDOM TRIUMPHS being the motto of the ica institute , we strive to inculcate in our students proper interests, attitudes and sense of values they have to up hold in life. To attain this goal, we insist in upholding truth, accepting the heritage of values, being clear in principles, being courageous in actions and willing to build a more just social order, thus realizing that the motto Wisdom Triumphs pervades all aspects of life, making them worthy citizens. The student-teacher relationship is based on respect for spiritual values and aims at promoting in the students a concern for their fellowmen

36

A GLANCE AT INTERNSHIP DETAILS

Name of the Student and Class; Gaurav Charadia, B.A Management 6th Semester Fathers Name; Alwyn Monteiro Name of the College; The Bhopal Ica institute of Social Sciences Students address and Phone Number; Pilar Niwas, Shanti Nagar, PO Kurana, Bhopal, MP PIN 462030 Mb. No: 07552808784 Student e-mail address; monteirokiran@yahoo.in Name of the Guide; Mrs. Geetu Choudhary Organization/Institution Name; Fr. Agnel Co-Ed Ica institute (Affiliated to C.B.S.E New Delhi)

Organization address; Bypass Road, near Saint Asaram ashram, Gondipura P.O. Gandhi Nagar, Bhopal -4620336

37

Organization contact number; 0755-2641309 Name of Instructor; Fr. Richard Couto sfx Area of internship: Ica institute Personnel Manager (director) Internship duration: Commencing date: 1st September 2011 Completion date: 31st October 2011 Number of days: 55

INTERNSHIP ACTVITIES

Name of the Chief Supervisor: Fr. Richard Couto. (The Director) Fr. Agnel Co. Ed. Sr. Sec. Ica institute . Mrs. Neha Khirwadkar, Sr. Franklin Fernandes (co-ordinators) Mrs. Nidhi Cecil, Mrs. Shaheen Yusuf and Mrs. Hamra Talat (Academic Incharge) Ms. Nikhat Praveen (Cultural Committee) Ms. Kaneez and Mr. Raj Kumar (Sports Committee) etc.
38

The director is the head of the institute, who allotted us work from time to time, and also explained to me his plans about different programmes and also the expectations he expected to achieve from the different programmes given by him. The co-ordinators were always there to guide and a support me in the different activities undertaken by me. The constantly fed me with their precious suggestions about the past history and as to how it could be done in the present. When i handled activities like conducting programmes, judging, taking classes, or any other activity for that matter we would sit together and to draw up a plan for organisation, with the help of the respective committee in charges. The in charges would provide me with the necessary requirements and do all the arrangements; they would also seek our help when needed to be creative and effective.

Work Allotted and Work Completed


39

According to the post chosen theme and keeping in view my career plan, personnel manager I was at fr. Agnel ICA BHOPAL. 102, 2ND FLOOR, ABOVE BRITISH LIBRARY, G.T.B. COMPLEX, NEW MARKET BHOPAL and guided by the head of the institute Fr. Director. I was appointed in assisting him in managing different activities of the ica institute in the two month of my internship programme. Here are the various duties, responsibilities and tasks undertaken at different weekly schedules. Duration 1st September 7th September Tasks fulfilled /undertaken I, as assistant manager, was introduced by the director in the ica institute assembly. I was given information about the total functioning of the ica institute . This week I was to observe the whole system of the ica institute as guided by the director. Was asked to glimpse to the overall discipline of the ica institute . For about one and half hour I had to sit in the office of the director to observe the situation when different people come to meet him. Ica institute students had their semester exams coming closer, so I had to look after the arrangement of the seats and question paper. I had to collaborate with
40

7th September 14th September

14th September 21st September

21stSeptember 28th September

Academic committee Was given substitution classes when students were absent or engaged some where Exam patrolling and invigilation work Judging of inter house wall paper competition Meeting was held in preparation of Exams Director gave me the responsibility of correcting the Value Education answer paper and prepare mark sheet Rendered my help to the teachers during the exam week.

28th September 4th October

4th October 11th October

I was assigned to judge the science exhibition competition 2011-2012. In a short meeting, all staff members with the director evaluated the conduct of exam. This week the great task was to recheck the answer papers of different subjects and sign them. Due to the Dussera occasion ica institute was closed. I was asked to collaborate with the cultural
41

11th October 18th October

18th October - 25th October

committee to prepare the students for the upcoming debate competition and I did the same. I trained the football players of the ica institute team for the HAAP meet upcoming (which is being organized among four neighboring ica institute ) by teaching them new skills and techniques. Some of the above work was done in holidays too. Task was assigned to prepare for the parents meet on 15th October. It was also called OPEN DAY. I took the responsibility of helping the teachers when parents came to meet them by distributing the different files. Asked to help in managing and organizing the HAAP Meet football Tournament 2011 2012. In the last week I was engaged in different classes and had different types entertaining programs. On the last day I collaborated with the Audio Visual teacher to show the students from 5th

42

std. 12th std. a musical movie. This was how I scheduled my internship program in different weeks as stated above

Duties and experiences

Observation duty; Since I had chosen the topic of communication, motivation and relationships of human resource management, the director asked me to sit in his office for about an hour daily to observe how he would deal with different types of people in different ways and grasp the techniques of communication, motivation and relations. I continued this observation till the end of September. Through observation I learned a lot about the internal setup of the organization and was able to understand the nature and character of people and organization. I had a good experience in connecting things that I have learnt in the class through observation. Substitution Classes; The director was of the view that during my internship program, I should get some experience of how the teachers deal with the students. Thus I was asked to substitute the teachers when the teachers were absent in the class due to leave or any other work in the ica institute . Everyday I was asked to take minimum two periods, in which I used to interact with the students, teach them value education, play games with them or do any other creative activity.
43

It increased my fluency in the language, confidence level, public speaking quality and was able to judge where I stand in my teaching. It was a learning experience to be with the students and interact with them. Debate; This is the next task I was given by the director to help the cultural committee to plan and organize the Inter House Debate Competition 201112. It was held on 15th October 2012. Since it was the first time the debate competition was held, we were asked to explain and help the teachers incharge and also the students understand the concept of debate. First we discussed and tried to understand what debate is and how it is conducted, together with the committee and the coordinators. Then we distributed the topics to different houses accordingly and asked the teacher incharge of the house to prepare the students for the same. One week prior to the competition, I guided the selected students in their preparation of matter. And when the day came, we managed the whole program, which included the anchoring, selecting the judges, calculation of the points, etc. the program was a blasting success. At the end of the day the director expressed his words of appreciation for our team work. It was a challenging and satisfying experience. I learned how to conduct debate.

Judging the various competitions: During the course of my internship, I also took on the responsibility to be a judge of a number of competitions, ranging from poetry recitation, inter house wall paper competition and science exhibition. This activity called for very decisive actions. This was a very refreshing and lovable experience.

44

Examination duty: This was an all together a different experience for me, for till this time I had only been playing the role of a student during the exams and never had been an invigilator. The first sem exams in the following organization were held from 19th September to 30th September. I took on many responsibilities in the course of time like setting of the question papers, patrolling, invigilation etc. I took this as an opportunity to learn how the exams are conducted, and infact I did it without much ado. It was a very good experience.

Correction of answer papers: All this while my exam papers were corrected by my teachers but for the first time I had the opportunity to correct somebody elses papers, and though it was very demanding, I did it to my best. The papers I corrected were of value education belonging to Std XI and XII. When I speak of my experience, I can now rightly say that correcting exam papers is a very demanding job and consumes a lot of time. This helped me to understand the job and it has also aided me in increasing my reading skills.

Rechecking the answer papers: After the examination most of the time was spent in recounting the marks of different corrected papers of different subjects with our signs to authenticate it. This was a hectic week and lot of work was allotted to me. Even then it was fun and helped us to improve our mathematical skill of addition.

Checking of Assignments and projects;

45

I went through the assignments and projects of 9th to 12th Std. students and allotted them marks according to their performance. I also filled the mark sheet.

Football training: When I joined the institution I observed the ica institute football team practicing football in the afternoons. Since I had some touch for this game, I took the initiative to help them with their practice. Whenever there was free time after the break, I would make a point to go to the football ground and give them some tips. The physical education was supportive and encouraged me to go forward with the same for he had very little knowledge about the game. It indeed raised my spirit to teach them and play along with them, and ultimately prepare them for the upcoming interica institute HAAP MEET (a football tournament played between four ica institute s) which was to be held on 18th October 2011. I was able to teach something to others which I knew. It made happy and also inspired me to carry forward with what I had started.

Inter ica institute football tournament: In 16th of October I was asked by the director to supervise the whole football tournament. I arranged the registration, the drawing of lots, judges, score boards, the referees, the ball boys, the commentators, the cheer leaders, lines men, and the over all functioning of the programme.

46

Our hard work paid off when we secured the runners up position. In this sphere I had an all together a different experience, to manage the overall activities of the entire tournament.

Discipline maintenance: It was our duty to maintain a certain standard of discipline in the organization. Whenever I moved around the corridors, I was supposed to uphold the discipline and correct any one be it the student or for that matter even the teachers. The director was of the view that, I being a Religious brother could be able to command, respect and discipline from the staff and the students. In the bargain I increased my own discipline and that in turn helped me to understand the importance of this virtue.

Section C Name of the organization that I found most useful and beneficial

Fr. Agnel Senior Secondary Co- Ed Ica institute (CBSE) Sr.no Date Name of the organization Fr. Agnel ica institute
47

People contacted Name Fr.Richard Tel.no

20/03/2012

2 3 4 5

23/032012 26/032012 29/032012 5/04/2012

Fr. Agnel ica institute Fr. Agnel ica institute Fr. Agnel ica institute Fr. Agnel ica institute

Sr.Franklin Sir.Bentson Sr.Franklin Fr.Richard

Brief work done and record of information of current semester

Since my projects for last four month were on same area at two different ICA BHOPAL. 102, 2ND FLOOR, ABOVE BRITISH LIBRARY, G.T.B. COMPLEX, NEW MARKET BHOPAL most of the part is covered up by

48

my project reports. At the end I would like to take up Teachers job Satisfaction which is another very important area concern of management. Teacher Job Satisfaction in this study has been defined as a Job satisfaction' is an affective attitude (a) feeling relative like (or) dislike toward something). Job Satisfaction emerges as an employee gives more and more information about the work place. So the satisfaction played a vital importance in presenting relationship between the individual teacher and his environment in respect of four dimensions viz., Professional, Teaching Learning, Innovation, Interpersonal relations. The influence on the Teacher in relations to head of the institute, colleagues and students in the ica institute and his activities, relations and participation in the society aspects are occupied the paramount importance in the present study. Undoubtedly any philosopher can comment that the ultimate aim of any education is to make a man of good character and useful citizen of the universe. This of education we can achieve through the quality of education, quality of teachers and quality of teaching learning process. Other things remaining, the quality of education largely learning transaction cannot be undertaken in vacuum but it is positively directed action, for which teachers are to be endeavor with satisfaction towards a job and the need of possessing the quality change-prone. This is the right time to focus the significance of Teacher Job Satisfaction in relation to Teacher ChangeProneness among the Primary Ica institute Teachers. The keystone in the educational edifice is doubtless the teacher. On him depends much more than any other, the progress and prosperity of children? Nobody can effectively take his place or influence children in the manner and to the degree; it is possible, for him alone to do. It is strongly believed that to be a teacher is to be the member of a holy order. The quality or effectiveness of teachers is considered to be associated with his satisfaction towards his profession, his satisfaction with his values. Fontana, D. (1986) regarded that if the teacher is too rigid or has a doctrinaire belief of that his methods are right and those of any one who disagrees with him are wrong, then he will be depriving his children of a range of possible learning experiences, to their disadvantage and to his own'.
49

Thus, it is clear that an effective and competent teacher will achieve the desired learning outcomes, provided if he satisfied in his profession. But no significant efforts are found to study the competency in relation to job satisfaction among teachers.

Job satisfaction measurement

Job Satisfaction measuring procedures appear to be complicated at a first glance. It seems simple to go to the employees and get data from them and then interpret. But experiences are shown that careless procedural class can limit seriously the validity and usefulness of the survey. Keen attention should be given to question construction, maintenance of anonymity for employees and sampling procedures The following dimensions for measuring Teacher Job Satisfaction. They are (1) Professional; (2) Teaching Learning; (3) Innovation; and (4) Interpersonal relations. Professional related to job security and social prestige, molding the young minds, getting appreciation from others, reaching problems of the students. Teaching learning refer to problems of the students, new situations, successfully managing the classes, students active participation in the classes, innovative technique in teaching, systematic plan of the work. Innovation relates to creativity, innovative technique in teaching, participation of cultural activities, co-curricular and social welfare activities. Inter-personal relations refer to relations with colleagues, parents, students, higher authorities or any personnel confined to ica institute .

Attracting and retaining high quality teachers is a primary necessity as well as a challenge for educational institutions. While intrinsic factors play a
50

significant role in motivating individuals to enter the teaching profession, extrinsic conditions can influence their job satisfaction and desire to remain in teaching. In addition, demographic factors and teacher specific and ica institute specific characteristics also affect job satisfaction. Each every person has his/her dreams to join any line of employment. thus teachers of ica institute are those who dreamt of doing so to follow their interest and to be satisfied . all work must be satisfied with their work they do and meet their individual motives by fulfilling the aims and purpose the organization . In this particular organization total strength of the teachers is sixty and above and as per my study there have been different levels of satisfaction among them. Fulfillment of inner desires and Aspiration results satisfaction, a teachers satisfaction will possibly lie on the response of the students and dedication, commitment of a person.

At times the situation of conflicts and quarrelling by pointing others mistake has not produced good level of satisfaction among teachers, nevertheless every one at every time cannot be in same frame of mind since we are humans. In spite of all these things teachers try to yield best out of the work given to them to execute. Reasons for their satisfaction The subjects given to them to teach as per their interest Proper and equal distribution of work among the teachers Timings of working hours Adequate salary schemes and periodical increments Suitable allotment classes for teaching Comfortable and satisfactory infrastructure, like campus, building, furniture and other facilities. Obliging students and their parents
51

Candid and straightforward authority Plateful company of other teachers

Section D

Self-assessment of my ability to find employment The studies in business management have helped to find area of interest, since I belong to the catholic religious community intending to become a religious priest as a member of the society of missionaries of St. Francis Xavier, which works in the educational and medical field, here we adapt and adopt to different situation wherever we journey, thus there is interaction with different kinds of people and their culture. Foreseeing my future in a education field, thus adding to that my interested area of employment, I come out with result of becoming a effective human recourse manager. I found in me the quality of sociability, authority with
52

service and leadership capacity in order to collaborate and work with any kind of people. Now this makes my path clear and easy, in near future my goal is to specialize in HRM and its related studies. Presently there is no need of seeking employment.

Evidence of improvement in written and oral skills Through many organized activities which were initiated by me. I have learned how to lead people and activities and gained leadership skills Through my dealing I have learned to be co-operative and supportive Through classes that conducted, gained speaking and there is some improvement s in my language and clarity in it. Altogether it made me to understand the whole functioning of ica institute , its requirements and helped me to grasp the mind of the student. The projects written at each semester are the evidence of improvement of written and oral skills. Presentations, group discussions have helped me to develop my speaking capacity.

53