Professional Documents
Culture Documents
Pgina
S10
CCCEIC
Presupuesto
Presupuesto
Cliente
Lugar
Item
Descripcin
01
01.01
Und.
Precio S/.
Parcial S/.
437,913.29
OBRAS PRELIMINARES
6,693.00
01.01.01
GLB
01.01.02
m2
01.02
Metrado
23/04/2012
1.00
3,087.72
2,158.85
1.67
MOVIMIENTO DE TIERRAS
3,087.72
3,605.28
145,571.33
01.02.01
m3
863.54
8.18
7,063.76
01.02.02
m3
863.54
72.97
63,012.51
01.02.03
m2
2,158.85
2.52
5,440.30
01.02.04
m2
2,158.85
11.98
25,863.02
01.02.05
m2
2,158.85
12.05
26,014.14
01.02.06
m3
1,079.43
16.84
18,177.60
01.03
SARDINELES
13,219.45
01.03.01
m3
25.18
27.47
01.03.02
m3
30.22
16.84
508.90
01.03.03
m3
25.18
294.50
7,415.51
01.03.04
m2
50.57
42.76
2,162.37
01.03.05
kg
500.20
4.88
01.04
01.04.01
01.05
CAMPO DEPORTIVO
SUM. E INST. DE GRASS ARTIFICIAL INC. CAMA DE ARENA Y CAUCHO, LINEAS
DE JUEGO
ARCOS DE FUTBOL CON F G 4" S/DISEO Y MALLA NYLON INC. SUM. Y
COLOCACION
02
GRADERIAS
02.01
m2
2,158.85
121.54
2.00
5,021.44
262,386.63
10,042.88
GLB
10,042.88
222,671.38
OBRAS PRELIMINARES
1,914.43
02.01.01
GLB
02.01.02
LIMPIEZA DE TERRENO
02.01.03
02.02
2,440.98
262,386.63
VARIOS
01.05.01
691.69
1.00
1,435.12
1,435.12
m2
159.24
1.34
213.38
m2
159.24
1.67
MOVIMIENTO DE TIERRAS
265.93
7,804.04
02.02.01
m3
20.54
31.40
644.96
02.02.02
m3
50.98
66.76
3,403.42
02.02.03
m3
71.50
16.84
1,204.06
02.02.04
m3
151.52
16.84
2,551.60
02.03
CONCRETO SIMPLE
5,706.78
02.03.01
m3
20.54
180.37
3,704.80
02.03.02
m3
6.20
299.61
1,857.58
02.03.03
m2
3.62
39.89
02.04
CONCRETO ARMADO
144.40
46,000.75
02.04.01
m3
3.12
382.87
1,194.55
02.04.02
m2
54.00
49.02
2,647.08
02.04.03
kg
425.00
4.88
2,074.00
02.04.04
m3
19.50
316.56
6,172.92
02.04.05
m2
168.20
47.36
7,965.95
02.04.06
kg
4,425.00
4.01
17,744.25
02.04.07
m3
3.45
321.66
1,109.73
02.04.08
m2
123.84
45.97
5,692.92
02.04.09
kg
285.00
4.91
1,399.35
m2
43.34
84.79
02.05
02.05.01
02.06
ALBAILERIA
MUROS DE LADRILLO KK ARCILLA CABEZA C/M 1:5x1.5CM.
3,674.80
3,674.80
7,008.08
02.06.01
m2
177.00
25.90
4,584.30
02.06.02
m2
114.98
21.08
2,423.78
m2
158.32
10.14
02.07
02.07.01
02.08
02.08.01
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX
1,605.36
VEREDAS EXTERIORES
DEMOLICION DE VEREDAS C/MAQUINA
1,605.36
26,676.57
m2
6.50
12.24
79.56
02.08.02
m2
221.68
1.67
370.21
02.08.03
02.08.04
m3
m3
11.70
40.51
61.91
8.18
724.35
331.37
02.08.05
m3
88.40
72.97
6,450.55
02.08.06
m2
221.68
5.91
1,310.13
02.08.07
m2
221.68
10.07
2,232.32
02.08.08
m3
14.89
16.84
250.75
02.08.09
m3
48.61
16.84
818.59
02.08.10
m2
221.68
44.40
9,842.59
02.08.11
222.20
16.96
3,768.51
02.08.12
ML
78.00
6.38
02.09
INSTALACIONES ELECTRICAS
497.64
122,280.57
02.09.01
und
6.00
1,535.89
9,215.34
02.09.02
345.00
30.15
10,401.75
02.09.03
325.00
19.93
6,477.25
02.09.04
und
6.00
8,930.22
53,581.32
02.09.05
und
1.00
37,933.50
37,933.50
02.09.06
und
1.00
4,671.41
COSTO DIRECTO
4,671.41
660,584.67
79,270.16
UTILIDADES 8%
52,846.77
===============
SUB TOTAL
792,701.60
142,686.29
================
TOTAL PRESUPUESTO
935,387.89
Fecha :
24/04/2012 09:14:27 AM