Project Overview
Design Concept
. Construction Work
Annexation
. Project Overview
1. Location 2. Background / Purpose 3. Project Summary
. Project Overview
Location
-1-
. Project Overview
Location
Incheon International Airport
Incheon Bridge
Seoul
Seoul Ring Road
Sihwa Industrial Complex Agriculture Reservation SongSan Green City Banwol Industrial Complex
YeongDong Expressway
-2-
. Project Overview
Background
1994.01. Completion of Sihwa Tide Embankment (11.2km) 2000.12. Lake use plan was changed (Freshwater LakeSeawater Lake) 2002.12. Sihwa Tidal Power Plant Project decided 2004.12. Commencement of Construction
Purpose
To develop clean, renewable energy supplies - Annual oil substitution Effect : 862,000 barrel - Annual reduction of CO2 emission : 315,000 ton To improve the water quality of Sihwa Lake
-3-
. Project Overview
Project Summary Location : Sihwa Tide Embankment Employer : Korea Water Resources Corporation EPC Contractor : Daewoo Engineering & Construction Co., Ltd. Generation Type : Single-Effect Flood Generation Type Capacity : 254MW (25.4MW per turbine, 10 units) Annual Generation : 552.7GWh Water Gate : 8 Sluice Gates (Culvert Type) Project Period : 2003~2010 Project Cost : US$ 355.1 million
-4-
. Design Concept
1. Plane Feature / Structure Layout 2. Generation Type 3. Generation System 4. Turbine Generator Structure 5. Sluice Gate Structure 6. Eco Park Area Plan
. Design Concept
Plane Feature
West Sea
Generator Section Gate Section
Structure Layout
Turbine Generator Structure Sluice Gate Structure
Connecting Structure
Green Area
-5-
. Design Concept
Generation Type
Single-effect style Scheme Items Ebb generation type Direction of Seawater Basin Sea Flood generation type Sea Basin Basin Sea Double-effect type
Discharge
Much
A Little Less
Much
Much
A Little Less
Much
Middle
Middle
High
Stabilize the water level of the basin for the industrial zone and metropolitan area around Sihwa Lake
-6-
. Design Concept
Generation Type
-7-
. Design Concept
Generation System
Sea Side Generation Dewatering Standby Lake Side
Management Level:EL(-)1.00
Turbine Generator
Sluice Gate
-8-
. Design Concept
Turbine Generator Structure
Capacity : 254M (25.4MW x 10units) Structure provides 2 level road Roof
Road
-9-
. Design Concept
Sluice Gate Structure
Culvert Type, 8units Dimension : B19.3mH24.0mL44.3m Max. discharge : 1,098m3/sec
- 10 -
. Design Concept
Eco Park Area Plan
Culture & Art Area Recreation Area
Drive in Cinema
Marina
Eco-environmental Area
Garibi Plaza
Island of Nature
Sea Plaza
- 11 -
. Construction Work
1. Construction Plan 2. Sihwa Tide Embankment 3. Cofferdam 4. Turbine Generator Structure 5. Sluice Gate Structure 6. Birds eye View 7. Turbine Installation Ceremony
. Construction Work
Construction Plan
Construction Period : 2004~2010
- 12 -
. Construction Work
Sihwa Tide Embankment Before Construction
- 13 -
. Construction Work
Cofferdam Circular Cell Type
- 14 -
. Construction Work
Turbine Generator Structure
- 15 -
. Construction Work
Sluice Gate Structure
- 16 -
. Construction Work
Birds eye View June 2009
- 17 -
. Construction Work
Turbine Installation Ceremony November 4, 2009
- 18 -
. Annexation
1. Tidal Power Plants in the World
. Annexation
Tidal Power Plants in the World
Name Spring Tide Capacity Annual Generation Completion Generation Type Rance (France) 13.5m 240MW 544GWh 1966 Double Effect Annapolis (Canada) 8.7m 20MW 50GWh 1984 Single Effect Jianxia (China) 8.39m 3.2MW 6GWh 1985 Double Effect
General View
- 19 -
. Construction Work
Tidal Power Potential in Korea
- 20 -
Thank you