You are on page 1of 10

MAIN INDEX

Sl No 1 2 3 4 5 6 7 8

Sections I II III IV V VI VII VIII

Description General Write up of the Power plant Boiler Electrostatic Precipitator (ESP) Steam Turbine Generator Critical Piping Balance of Plant - Mechanical Balance of Plant - Electrical Control & Instrumentation

Page No

4773 306 861 190

Page 01 of 10

Section-1 - Index General Write up of the Power plant Volume 1


Chapter 1 2 3 4 5 6 7 8 Clause 1.00.00 2.00.00 3.00.00 4.00.00 5.00.00 6.00.00 7.00.00 8.00.00 Description Project Information Plant operational general write-up Over all plant SLD Plant P&ID Key Plan Water Balance Diagram Vendor Information CCOE approved Document Page No ---43 2 117 ---2 18 4

Page 02 of 10

Section-II - Index Boiler


Chapter Clause Description Page No

Volume 1 General Description of CFBC Boiler


1 1.00.00 Introduction of General Write Up
Volume 2 Mechanical Documents

166

1 2 3 4 5

1.00.00 2.00.00 3.00.00 4.00.00 5.00.00

Boiler Pressure Part Piping Boiler Non Pressure Parts Fuel Feeding & Firing System Fan

566 87 541 513 405

Volume 3 Controls & Instrumentations


1 2 3 1.00.00 2.00.00 3.00.00 Control & Instrumentation Documents Control & Instrumentation System Documents Control &Instrumentation Data Sheets & Vendor Instruction Manuals Field Instrumentation 566 967 925

Volume 4 Drawings
1 1.00.00 Drawings 31

Notes :

Index for Volume 2 Mechanical Documents Index for Volume 3 Controls & Instrumentations Index for Boiler

2 2 2

Page 03 of 10

Section-III - Index Electrostatic Precipitator (ESP) Volume 1


Chapter Clause 1.00.00 1.01.00 1.02.00 1 1.03.00 1.04.00 1.05.00 1.06.00 1.07.00 Description Technical Specification Working Principle Component Description Safety Precautions Commissioning Maintenance Trouble Shooting Sub vendor manuals & Data sheet 306 Page No

Page 04 of 10

Section-IV - Index Steam Turbine Generator


Chapter Clause Description Page No Volume 1 Technical Specification, Installation, Operation and Maintenance of Steam Turbine 1 2 3 1.00.00 2.00.00 3.00.00 General description and main technical specification Steam Turbine Manual of Installation Startup / Operation instruction of Steam Turbine Volume 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1.00.00 2.00.00 3.00.00 4.00.00 5.00.00 6.00.00 7.00.00 8.00.00 9.00.00 10.00.00 11.00.00 12.00.00 13.00.00 14.00.00 15.00.00 16.00.00 Instruction of Turbine Auxiliary Equipments 123

Instruction of Condenser Instruction of LP heaters Instruction of HP heaters Instruction of Gland steam Condenser Instruction of Pneumatic check valve & control device Instruction of Drain Flash Tank Instruction of Layout of High & Low heater drainage valve Instruction of water level alarm Instruction of Air Tank Lube Oil system Instruction Installation,Operation and maintenance manual of Turbine oil conditioning Purifier Instruction of Shaft jacking device Instruction of Oil Vapor Extractor Instruction of Turning gear Instruction of Rubber ball cleaning device Data Sheet for Turbine Generator Volume 3 Turbine Electrical 162 Control and instrumentation 191

1 2

1.00.00 2.00.00

Generator AVR and Excitation System Volume 4

1 2 3

1.00.00 2.00.00 3.00.00

C&I Documents C&I TG-DCS Documents C&I System Panels Volume 5 General Arrangement Drawings 184 199

1.00.00

GA Drawings

Notes :

Index for Steam Turbine Generator

Page 05 of 10

Section-V - Index Critical Piping Volume 1


Chapter 1 2 3 4 Clause 1.00.00 2.00.00 3.00.00 4.00.00 Control Valves Safety Relief Valve Safety Valve Spring Hanger 190 Description Page No

Page 06 of 10

Section-VI - Index Balance of Plant - Mechanical


Chapter 1 Clause Description Page No

Volume 1 Water System


1.00.00 Operation & Maintenance Manual

Volume 2
1 2 3 4 5 6 1.00.00 2.00.00 3.00.00 4.00.00 5.00.00

Ash Handling System


970 73 66 6 61 14 3

Dense Phase Ash Handling System Redler Chain Conveyor Chain and Bucket Elevator RIECO Vendor Drawings RUD India Chain Conveyor

6.00.00 O&M Manual for Actuators Index for Volume 2 Ash Handling System Notes :

Volume 3 Fire Fighting System


1 2 3 1.00.00 2.00.00 3.00.00 Operation & Maintenance Manual Data Sheet for Fire Fighting System G.A Drawing for Fire Fighting System 316

Volume 4
1 2 3 1.00.00 2.00.00 3.00.00

Elevator
52

Operation & Maintenance Manual Data Sheet for Elevator G.A Drawing for Elevator

Volume 5
1 2 3 1.00.00 2.00.00 3.00.00

Air Compressor

Operation & Maintenance Manual Data Sheet for Air Compressor G.A Drawing for Air Compressor

Volume 6 LDO Unloading System


1 2 1.00.00 2.00.00 Operation & Maintenance Manual G.A Drawing for LDO Unloading System

Volume 7
1 2 3 4 5 6 7 1.00.00 2.00.00 3.00.00 4.00.00 5.00.00 6.00.00 7.00.00

LP Piping System
325 235 ------137 171 34

Cooling Tower Makeup Water System Service Water System DM Water Transfer System Potable Water System CT BlowDown System Boiler BlowDown System Portable Drain Pump

Volume 8
1 1.00.00

HVAC

Operation & Maintenance Manual

Page 07 of 10

Chapter 2 3

Clause 2.00.00 3.00.00 Data Sheet for HVAC G.A Drawing for HVAC

Description

Page No

Volume 9 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 1 2 3 4 5
1.00.00 2.00.00 3.00.00

Self Cleaning Strainer


32

Operation & Maintenance Manual Data Sheet for Self Cleaning Strainer G.A Drawing for Self Cleaning Strainer

Volume 10
1.00.00 2.00.00 3.00.00

Portable Compressor
101

Operation & Maintenance Manual Data Sheet for Portable Compressor G.A Drawing for Portable Compressor

Volume 11
1.00.00 2.00.00 3.00.00

EOT Crane
65

Operation & Maintenance Manual Data Sheet for EOT Crane G.A Drawing for EOT Crane

Volume 12
1.00.00 2.00.00 3.00.00

HOT Crane
36

Operation & Maintenance Manual Data Sheet for HOT Crane G.A Drawing for HOT Crane

Volume 13
1.00.00 2.00.00 3.00.00

Electric Hoist
43

Operation & Maintenance Manual Data Sheet for Electric Hoist G.A Drawing for Electric Hoist

Volume 14
1.00.00 2.00.00 3.00.00

Plate Heat Exchanger


84

Operation & Maintenance Manual Data Sheet for Plate Heat Exchanger G.A Drawing for Plate Heat Exchanger

Volume 15
1.00.00 2.00.00

Rubber Expansion Joint


18

Operation & Maintenance Manual Data Sheet & G.A Drawing for Rubber Expansion Joint

Volume 16
1.00.00 2.00.00 3.00.00 4.00.00 5.00.00 Cooling Tower

Cooling Water System


268 114 49 101 ----

Main Cooling Water System and Auxiliary Cooling Water System Demineralised Closed Circuit Cooling Water System Gas Chlorination System Chemical Conditioning System

Page 07 of 10

Section-VII - Index Balance of Plant - Electrical Volume 1


Chapter 1 2 3 4 5 6 7 8 9 10 11 12 13 Clause 1.00.00 2.00.00 3.00.00 4.00.00 5.00.00 6.00.00 7.00.00 8.00.00 9.00.00 10.00.00 11.00.00 12.00.00 13.00.00 400KV Switchyard Transformer & Accessories Busduct HT Panel LT Panel Motors DC System UPS Diesel Generator Illumination System Electrical Control Panel Layout Drawings DC Starter Panels Description Page No

Page 09 of 10

Section-VIII - Index Balance of Plant - C&I


Chapter Clause Description Page No

Volume 1
1 2 3 1.00.00 2.00.00 3.00.00

Water Treatment Plant (WTP)

Instrument list PLC system Vendor Documents by BOP_mechanical Volume 2 Cooling Water System 151

1.00.00

Cooling water system (MCW/ACW/CT/DMCCW)

Volume 3
1 2 3 4 1.00.00 2.00.00 3.00.00 4.00.00

Ash Handling System

Ash Handling Plant AHP Bed ash handling system PLC system Vendor Documents

Volume 4
1 2 1.00.00 2.00.00

Fire Fighting System

Fire fighting & alarm system PLC system

Volume 5
1 2 3 1.00.00 2.00.00 3.00.00 HVAC system PLC system P&V system

HVAC

Volume 6
1 2 1.00.00 2.00.00

Air Compressor

Air Compression system (plant air) PLC system

Volume 7
1 1.00.00

Gas Chlorination System

Gas Chlorination system

Volume 8
1 1.00.00

Sewage Treatment System

Sewage Treatment System

Volume 9
1 1.00.00

Drawing Files
13

Fire Alarm System Building / Floor Wise Drawings

Page 10 of 10

You might also like