Problema 1

*****************************
* MODSIM UNIT DESIGN REPORT *
*****************************
UNIT EQUIPMENT DATA SHEET - GYRATORY CRUSHER
********************************************
Unit number 1
MODSIM model name GYRA
Job name: erick fernandez
Tonnage to be processed 360.0
Open side discharge setting 15.00

Size distribution in feed


Size % passing
cms
0.421
100.000
0.297
100.000
0.210
100.000
0.149
100.000
0.105
100.000
0.743E-01 100.000
0.526E-01 100.000
0.371E-01 100.000
0.263E-01 100.000
0.186E-01 100.000
0.131E-01 100.000
0.929E-02 100.000
0.657E-02 99.999
0.465E-02 99.939
0.328E-02 99.203
0.232E-02 95.878
0.164E-02 87.792

tons per hour


cms

0.116E-02 75.029
0.821E-03 59.966
0.581E-03 45.337
0.411E-03 32.868
0.290E-03 23.117
0.205E-03 15.922
0.145E-03 10.811
0.00
0.000
Top size in feed is approximately 0.00 cms
Dimension A of crusher must be at least 0.00 cms
Minimum head diameter required to handle the tonnage.....
"Fall through" material in feed NaN percent.
Size distribution in product
Size % passing
cms
0.421
5.629
0.297
4.223
0.210
3.163
0.149
2.366
0.105
1.767
0.743E-01 1.319
0.526E-01 0.984
0.371E-01 0.734
0.263E-01 0.547
0.186E-01 0.408
0.131E-01 0.304
0.929E-02 0.227
0.657E-02 0.169
0.465E-02 0.126
0.328E-02 0.094
0.232E-02 0.070
0.164E-02 0.052
0.116E-02 0.039
0.821E-03 0.029
0.581E-03 0.021
0.411E-03 0.016
0.290E-03 0.012
0.205E-03 0.009
0.145E-03 0.007
0.00
0.000
Impact work index of the material is 10.88 kWhr/ton
80% passing size in feed is 0.01 mms.

80% passing size in product is 216.88 mms.


Estimated power requirements -.107E+05 kW
Power requirement to allow for 35% surge capacity-.1447E+05 KW.
Crusher selected.....

Crusher capacity from manufacturer's tables.....tons per hour.


Number of crushers required......

Distribucin de tamao de la alimentacin:

Distribucin de tamao de la salida:

Problema 2:

*****************************
* MODSIM UNIT DESIGN REPORT *
*****************************

UNIT EQUIPMENT DATA SHEET - GYRATORY CRUSHER


********************************************
Unit number 1
Job name: erick

MODSIM model name GYRA

Tonnage to be processed 100.8


Open side discharge setting 15.00

Size distribution in feed


Size % passing
cms
0.421
90.433
0.297
89.186
0.210
84.999
0.149
76.308
0.105
63.897
0.743E-01 50.183
0.526E-01 37.435

tons per hour


cms

0.371E-01 26.876
0.263E-01 18.777
0.186E-01 12.875
0.131E-01 8.719
0.929E-02 5.857
0.657E-02 3.911
0.465E-02 2.600
0.328E-02 1.724
0.232E-02 1.144
0.164E-02 0.759
0.116E-02 0.502
0.821E-03 0.332
0.581E-03 0.220
0.411E-03 0.146
0.290E-03 0.097
0.205E-03 0.064
0.145E-03 0.042
0.00
0.000
Top size in feed is approximately 33.97 cms
Dimension A of crusher must be at least 42.47 cms
Minimum head diameter required to handle the tonnage.....
"Fall through" material in feed 98.28 percent.
Scalping of the feed is recommended.

Size distribution in product


Size % passing
cms
0.421
5.629
0.297
4.223
0.210
3.163
0.149
2.366
0.105
1.767
0.743E-01 1.319
0.526E-01 0.984
0.371E-01 0.734
0.263E-01 0.547
0.186E-01 0.408
0.131E-01 0.304
0.929E-02 0.227
0.657E-02 0.169
0.465E-02 0.126
0.328E-02 0.094
0.232E-02 0.070

0.164E-02 0.052
0.116E-02 0.039
0.821E-03 0.029
0.581E-03 0.021
0.411E-03 0.016
0.290E-03 0.012
0.205E-03 0.009
0.145E-03 0.007
0.00
0.000
Impact work index of the material is 10.88 kWhr/ton
80% passing size in feed is 1.71 mms.
80% passing size in product is 216.88 mms.
Estimated power requirements -242. kW
Power requirement to allow for 35% surge capacity-326.3

KW.

Crusher selected.....

Crusher capacity from manufacturer's tables.....tons per hour.


Number of crushers required......

NOTES:

UNIT EQUIPMENT DATA SHEET - VIBRATING SCREEN


********************************************
Unit number 2
Job name: erick

MODSIM model name SCRN

There is/are 1 screen/s in parallel


Tonnage to be processed 100.8 tonnes/hr.
Tonnage in undersize product 90.72 tonnes/hr.
Mesh size 50.00 mms.
Surface water on deck oversize 0.0 %
Factors are calculated for horizontal screen.
Basic capacity = 76.150 tons per hour per square meter
Particle size distribution in the feed.
Size % passing

mms
4.21
5.629
2.97
4.223
2.10
3.163
1.49
2.366
1.05
1.767
0.743
1.319
0.526
0.984
0.371
0.734
0.263
0.547
0.186
0.408
0.131
0.304
0.929E-01 0.227
0.657E-01 0.169
0.465E-01 0.126
0.328E-01 0.094
0.232E-01 0.070
0.164E-01 0.052
0.116E-01 0.039
0.821E-02 0.029
0.581E-02 0.021
0.411E-02 0.016
0.290E-02 0.012
0.205E-02 0.009
0.145E-02 0.007
0.00
0.000
Percent oversize in feed 62.69%
Oversize factor is 1.399
Percent half size in feed 22.91%
Half-size factor is 0.658
Deck location factor 1.00
Specific gravity of material in feed 2.70
Bulk density of material in feed 1620. kgs/m**3
Bulk density factor is 1.013
Screen area required

1.420 sq meters

Particle size distribution in the overflow.


Size % passing
mms
4.21
5.629
2.97
4.223
2.10
3.163
1.49
2.366
1.05
1.767
0.743
1.319
0.526
0.984

0.371
0.734
0.263
0.547
0.186
0.408
0.131
0.304
0.929E-01 0.227
0.657E-01 0.169
0.465E-01 0.126
0.328E-01 0.094
0.232E-01 0.070
0.164E-01 0.052
0.116E-01 0.039
0.821E-02 0.029
0.581E-02 0.021
0.411E-02 0.016
0.290E-02 0.012
0.205E-02 0.009
0.145E-02 0.007
0.00
0.000
Particle size distribution in the underflow
Size % passing
mms
4.21
5.629
2.97
4.223
2.10
3.163
1.49
2.366
1.05
1.767
0.743
1.319
0.526
0.984
0.371
0.734
0.263
0.547
0.186
0.408
0.131
0.304
0.929E-01 0.227
0.657E-01 0.169
0.465E-01 0.126
0.328E-01 0.094
0.232E-01 0.070
0.164E-01 0.052
0.116E-01 0.039
0.821E-02 0.029
0.581E-02 0.021
0.411E-02 0.016
0.290E-02 0.012
0.205E-02 0.009
0.145E-02 0.007
0.00
0.000

1.-Alimentacin:

2.-Entrada al triturador:

3.-Entrada al Tamizador:

4.-Reciclo:

5.-Finos: