Erection of the James Rumsey Bridge

A Case Study in Long Span Steel Erection

OTEC 2007 October 2007

Thomas Leech,P.E.,S.E., Vice President David A. Lattanzi, Structural Engineer

James Rumsey Bridge

Erection of the James Rumsey Bridge


A Case Study in Long Span Steel Erection
1,085 ft

OTEC 2007 October 2007

Overview
History Lesson

425 ft

Project Introduction

Rumsey Bridge Erection Procedure (Proposed and Implemented) Erection Procedure Considerations MD
WV

ver iiver ac R ac R m om Potto Po

Deep unbraced plate girders are inherently unstable and careful consideration must be given individually to all states of stress during transport, fit-up, erection & closure to avoid overstress and out of plane distortions during all phases of James Rumsey Bridge erection.

Erection of the James Rumsey Bridge


A Case Study in Long Span Steel Erection

OTEC 2007 October 2007

General Contractor: Brayman Construction

Erector: Advantage Steel & Construction

James Rumsey Bridge

INTRODUCTION

OTEC 2007 October 2007


Cumberland MD Cumberland MD

Maryland Maryland

Swearingens Ferry? Swearingens Ferry? Pack Horse Ford? Pack Horse Ford?
James Rumsey Bridge

West Virginia West Virginia Fairfax Stone Fairfax Stone Shepherdstown WV Shepherdstown WV

Potomac River

Located in Shepherdstown, WV Located in Shepherdstown, WV 90 miles from the Fairfax Stone 90 miles from the Fairfax Stone 150 miles from Chesapeake Bay 150 miles from Chesapeake Bay
Virginia Virginia

Washington DC Washington DC

Maryland Maryland

Chesapeake Bay Chesapeake Bay

James Rumsey Bridge

INTRODUCTION

OTEC 2007 October 2007

Spans the Potomac River


James Rumsey Bridge

1,085 ft river crossing New structure is upstream

Fairfax Stone

Ties into existing alignment with horizontal curve Replaces an existing six span Wichert Truss
What is a Wichert Truss?

Chesapeake Bay

Located in Shepherdstown, WV 90 miles from the Fairfax Stone 150 miles from Chesapeake Bay
PC PC PT PT

James Rumsey Bridge

WHAT IS A WICHERT TRUSS?


Before the use of computers, the interaction of forces on continuous trusses was difficult to calculate.

OTEC 2007 October 2007

One solution to the problem was developed by E. M. Weichert of Pittsburgh, PA, in 1930.

statically statically determinate determinate The open diamond panel above each pier is the easily recognized mark of this truss type; without a vertical truss member in this hinged location. By introducing a open, hinged quadrilateral over the intermediate piers, each span could be calculated independently.

hinges hinges

James Rumsey Bridge

WHAT IS A WICHERT TRUSS?


Before the use of computers, the interaction of forces on continuous truss was difficult to calculate. The Charles Anderson Bridge over Junction Hollow, City of Pittsburgh, is another example of the unusual "Wichert SelfAdjusting Truss.

OTEC 2007 October 2007

One solution to the problem was developed by E. M. Wichert of Pittsburgh, PA, in 1930.. The curved lower chord gives the bridge the form of an arch, but it does not rely on arch action to carry the load. The open diamond panel above each pier is the easily recognized mark of this truss type; without a vertical truss member in this hinged location.

What is a Wichert Truss? Or is it a Weichert Truss?

By introducing a open, hinged quadrilateral over the intermediate piers, each span could be calculated independently.
James Rumsey Bridge

WHAT IS A WICHERT TRUSS?

OTEC 2007 October 2007

What is a Wichert Truss? Or is it a Weichert Truss?

WV WV

James Rumsey Bridge, James Rumsey Bridge, Shepherdstown, WV, 1939-2004 Shepherdstown, WV, 1939-2004

James Rumsey Bridge

STEEL ERECTION PROCEDURE


Original Concept as outlined in the design documents
Barge mounted temporary towers Balancing of girder segments over piers Drop in erection of main span

OTEC 2007 October 2007

Max web depth: 18 feet Max span length: 425 ft Horizontally curved

Proposed and accepted erection procedure


Five temporary towers located on the river causeway Span by span erection proceeding from the south abutment Single girder erection

Erection Strategy
Use of high capacity crawler cranes Stable tower/girder system for specified wind and hydraulic loadings Placement of temporary jacking stiffeners at critical tower locations

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners Required to remain stable under wind and hydraulic loads
MD

MD

WV

Potomac River (looking downstream)

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

IMPLEMENTED ERECTION PROCEDURE

OTEC 2007 October 2007

Span by span erection, north to south Five temporary towers on causeway High capacity crawler cranes Temporary jacking stiffeners
MD

James Rumsey Bridge

CONSIDERATIONS FOR STABLITY

OTEC 2007 October 2007

Deep unbraced plate girders are inherently unstable and careful consideration must be given individually to all states of stress during transport, fit-up, erection & closure to avoid overstress and out of plane distortions during all phases of James Rumsey Bridge erection.

CONSIDERATIONS

OTEC 2007 October 2007

1. Holding Cranes or Temporary Towers? 2. Web Stiffening At Towers? 3. Drop In or Span By Span Erection? 4. Pitfalls of Single-Plate Girder Erection 5. Considerations for Curved Members 6. Adequacy of Lateral Bracing Points 7. Adequacy of Temporary Tower

James Rumsey Bridge

CONSIDERATION 1 Holding Cranes or Temporary Towers?

OTEC 2007 October 2007

holding crane

temporary tower Do I really need a temporary tower? Do I really need a temporary tower?
James Rumsey Bridge

CONSIDERATION 1 Holding Cranes or Temporary Towers?

OTEC 2007 October 2007

temporary tower

James Rumsey Bridge

CONSIDERATION 2 Web Stiffening at Towers?

OTEC 2007 October 2007

Do I really need to stiffen this web? Do I really need to stiffen this web?
James Rumsey Bridge

CONSIDERATION 2 Web Stiffening at Towers?

OTEC 2007 October 2007

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Why can I not use span by span erection? Why can I not use span by span erection?
James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

1. What do we mean by drop-in erection? 2. What do we mean by span by span erection?

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Illustration of drop-in erection Bloomfield Bridge, Pittsburgh, PA single viaduct 180 feet above valley floor

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Illustration of drop-in erection Bloomfield Bridge, Pittsburgh, PA single viaduct 180 feet above valley floor

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Illustration of span by span erection PA Toll 43, Washington County, PA twin viaducts 260 feet above valley floor

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Illustration of span by span erection PA Toll 43, Washington County, PA twin viaducts 260 feet above valley floor

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Illustration of span by span erection PA Toll 43, Washington County, PA twin viaducts 260 feet above valley floor

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

Illustration of span by span erection PA Toll 43, Washington County, PA twin viaducts 260 feet above valley floor

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?

OTEC 2007 October 2007

drop-in span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 3 Drop In or Span by Span Erection?


drop-in span

OTEC 2007 October 2007

drop-in span erection

span by span erection

James Rumsey Bridge

CONSIDERATION 4 Pitfalls of Singe-Plate Girder Erection

OTEC 2007 October 2007

Why can I not just place oneof lesserup at a demands, erectors prefer single-plate girder erection. Why can I not just place one girder up at a time? Because girder crane time? The decision to employ single-plate girder erection in lieu of erecting girders James Rumsey Bridge in stable pairs is typically made at the time of bid.

CONSIDERATION 4 Pitfalls of Singe-Plate Girder Erection

OTEC 2007 October 2007

Illustration of single-plate girder erection PA Toll 43, Washington County, PA twin viaducts 260 feet above valley floor

lifting crane holding crane erection bench erection bench

Because of lesser crane demands, erectors prefer single-plate girder erection. The decision to employ single-plate girder erection in lieu of erecting girders James Rumsey Bridge in stable pairs is typically made at the time of bid.

CONSIDERATION 4 Pitfalls of Singe-Plate Girder Erection

OTEC 2007 October 2007

Frequently erection plans fail to properly consider stability of the first girder line during erection of the second girder line.

Because of lesser crane demands, erectors prefer single-plate girder erection. The decision to employ single-plate girder erection in lieu of erecting girders James Rumsey Bridge in stable pairs is typically made at the time of bid.

CONSIDERATION 4 Pitfalls of Singe-Plate Girder Erection

OTEC 2007 October 2007

Frequently erection plans fail to properly consider stability of the first girder line during erection of the second girder line.

high stress concentrations

torque

James Rumsey Bridge

CONSIDERATION 5 Considerations for Curved Members

OTEC 2007 October 2007

What if my girders are curved? What if my girders are curved?


James Rumsey Bridge

CONSIDERATION 5 Considerations for Curved Members

OTEC 2007 October 2007

temporary tower girder


PC PC

girder stabilization device


PT PT
James Rumsey Bridge

CONSIDERATION 5 Considerations for Curved Members


0.5 ff= P/A +Pe/S sec [(P/EI) ((L/2)] = P/A +Pe/S sec [(P/EI) L/2)] Secant formula Secant formula 0.5 0.5

OTEC 2007 October 2007

The following can be derived: The following can be derived: 0.5 fa= P/A =Fy/(fs)/ (1+eA/S secL/2r{(fa)(fs)/E} fa= P/A =Fy/(fs)/ (1+eA/S secL/2r{(fa)(fs)/E}
PC PC PT PT
James Rumsey Bridge

CONSIDERATION 6 Adequacy of Lateral Bracing Points

OTEC 2007 October 2007

Cross frames are adequate bracing, right? Cross frames are adequate bracing, right?

James Rumsey Bridge

CONSIDERATION 6 Adequacy of Lateral Bracing Points

OTEC 2007 October 2007

top strut provided

A properly designed cross frame system with adequate struts will inhibit higher buckling modes (as illustrated) and develop adequate temporary flexural strength

James Rumsey Bridge

CONSIDERATION 6 Adequacy of Lateral Bracing Points

OTEC 2007 October 2007

top strut provided top strut omitted

NOT THE JAMES RUMSEY


BRIDGE James Rumsey Bridge

CONSIDERATION 7 Adequacy of Temporary Tower

OTEC 2007 October 2007

What are reasonable loading expectations for temporary towers? What are reasonable loading expectations for temporary towers?
James Rumsey Bridge

CONSIDERATION 7 Adequacy of Temporary Tower

OTEC 2007 October 2007

James Rumsey Bridge

CONSIDERATION 7 Adequacy of Temporary Tower

OTEC 2007 October 2007

James Rumsey Bridge

CONSIDERATION 7 Adequacy of Temporary Tower


blocking blocking

OTEC 2007 October 2007

jack jack

James Rumsey Bridge

CONSIDERATION 7 Adequacy of Temporary Tower


wind pressure wind pressure

OTEC 2007 October 2007

braced for braced for overturning overturning

James Rumsey Bridge

CONSIDERATION 7 Adequacy of Temporary Tower

OTEC 2007 October 2007

hydraulic hydraulic pressure pressure

Although not anticipated by the erection plan, three significant meteorological events, Hurricanes Charley, Frances, and Ivan James Rumsey Bridge occurred between June and November of 2004.

Erection of the James Rumsey Bridge


A Case Study in Long Span Steel Erection

OTEC 2007 October 2007

Thomas Leech,P.E.,S.E., Vice President David A. Lattanzi, Structural Engineer

end

James Rumsey Bridge