Tender Inviting Authority: EXECUTIVE ENGINEER, BARGARH (R&B) DIVISION, BARGARH Name of Work:S/R to Burla link road such

as construction of Box culvert at road crossing Kirba chowk, providing cement concrete shoulder, cement concrete drain and retaining wall in front of VSS U.T. Burla Contract No: Bid Identification No.: EE PWD BGH-01 of 2012-13 Bidder Name: Sl. No. 1 Description of work SCHEDULE OF WORKS Quantity Unit One hundred cubic metre Figure 5399.22 Excess ( + ) Estimated Rate Words Rupees Five Thousand Three Hundred Ninety Nine And Twenty Two Paise Only 0.00 % AMOUNT Rs. P 26488.03

Earth work in excavation of foundation in all kinds of soil including 490.590 cum moorum, stony earth mixed with boulders (except sheet rocks and boulders requiring blasting) with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the works etc. complete as directed by the Engineer-in-charge. Supplying, filling in foundation and plinth with sand in 22.5 cm (9) thick 434.630 cum layers including watering and ramming with cost, conveyance, royalties and taxes of sand with labour and T&P required for the work etc. complete (Measurement will be taken on finished compacted section only). Cement concrete of proportion (1:4:8) in foundation and floors using 436.880 cum 4cm (1 ) size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6) thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with all labour and T&P required for the work etc. complete in all respect.

Each cubic metre

327.52

Rupees Three Hundred Twenty Seven And Fifty Two Paise Only

142350.02

Each cubic metre

2674.49

Rupees Two Thousand Six Hundred Seventy Four And Forty Nine Paise Only

1168431.19

Signature of Tenderer with seal

Tender Inviting Authority: EXECUTIVE ENGINEER, BARGARH (R&B) DIVISION, BARGARH Name of Work:S/R to Burla link road such as construction of Box culvert at road crossing Kirba chowk, providing cement concrete shoulder, cement concrete drain and retaining wall in front of VSS U.T. Burla Contract No: Bid Identification No.: EE PWD BGH-01 of 2012-13 Bidder Name: Sl. No. 4 Description of work SCHEDULE OF WORKS Quantity Unit Each cubic metre Figure 3612.89 Excess ( + ) Estimated Rate Words Rupees Three Thousand Six Hundred Twelve And Eighty Nine Paise Only 0.00 % AMOUNT Rs. P 2272471.68

R.C.C. work of Grade-M15 in Retaining wall, drain wall etc. using 628.990 cum 20mm size & down graded hard black crusher broken granite stone chips of approved quality from approved quarry in specified proportion including hoisting, lowering, laying and compacting concrete, watering and curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour and T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position. R.C.C. work of Grade-M15 using 20mm size & down graded hard black crusher broken granite stone chips of approved quality from approved quarry in specified proportion including hoisting, lowering, laying and compacting concrete, watering and curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour and T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position. 20.340 cum

Each cubic metre

3848.04

Rupees Three Thousand Eight Hundred Forty Eight And Four Paise Only

78269.13

Signature of Tenderer with seal

Tender Inviting Authority: EXECUTIVE ENGINEER, BARGARH (R&B) DIVISION, BARGARH Name of Work:S/R to Burla link road such as construction of Box culvert at road crossing Kirba chowk, providing cement concrete shoulder, cement concrete drain and retaining wall in front of VSS U.T. Burla Contract No: Bid Identification No.: EE PWD BGH-01 of 2012-13 Bidder Name: Sl. No. 6 Description of work SCHEDULE OF WORKS Quantity Unit Each quintal Figure 6443.97 Excess ( + ) Estimated Rate Words Rupees Six Thousand Four Hundred Forty Three And Ninety Seven Paise Only 0.00 % AMOUNT Rs. P 997011.04

Straightening bent up or coiled M.S. rod or HYSD steel (Fe-415 / Fe154.72 qtl 500), cutting, bending, cranking, hooking, welding or jointing (if required), the M.S. rod or HYSD steel and binding, tying the grills, hoisting, lowering and placing in proper position as per drawing & design required for R.C.C. works including cost, conveyance and taxes of M.S. rod or HYSD steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc. complete in all floors (weight of binding wires will not be considered for payment and payment will be made on weight of M.S. rod or HYSD steel only. Steel bars of only manufacturing companies such as S.A.I.L. of Fe-415 / Fe-500 grade are to be used in the work & if required original bill of S.A.I.L. steel has to be produced by the contractor) Earth work in excavation of road surface by mechanical means and 1329.200 cum depositing the earth with in 5 Km by mechanical meansng as per direction of Engineer-in-charge. 6.330 cum R.C.C. work of Grade-M15 in foundation using 20mm size & down graded hard black crusher broken granite stone chips of approved quality from approved quarry in specified proportion including hoisting, lowering, laying and compacting concrete, watering and curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour and T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position.

Each cubic metre Each cubic metre

141.90

3506.79

Rupees One Hundred Forty One And Ninety Paise Only Rupees Three Thousand Five Hundred Six And Seventy Nine Paise Only

188613.48

22197.98

Total estimated cost in Figures Quoted Amount Quoted rate in Words

4895832.55 4895832.55 4895833.00 Rupees Forty Eight Lakh Ninety Five Thousand Eight Hundred Thirty Three Only

Signature of Tenderer with seal