You are on page 1of 4

CURRICULUM VITAE

JOHN RAY CANONIGO


OBJECTIVES:
A position where an extensive background in the Field of Engineering Construction would be utilized particularly in evaluating and applying standard construction, engineering techniques, procedures and criteria using applicable codes and specifications.

SUMMARY OF WORK EXPERIENCE:

More than six (6) years of experience in construction works; assigned on the fabrication and erection/installation of piping works such as; UREA and AMMONIA FERTILIZER PLANT; GAS and OIL SEPARATION PLANT (GOSP); GAS POWER PLANT; GAS and OIL REFINERY; and with comprehensive exposure in fabrication and assembly of structural trusses, columns, girders and has gained enough exposures on field execution and has thorough knowledge and idea on Fabrication and Erection, Plan Drawings, Isometric Drawings, P&ID and details. Proven ability in monitoring and updating daily accomplishment report.

WORK HISTORY FROM PRESENT WORK BACKWARD


EMPLOYER: POSITION: PERIOD: PROJECT: COUNTRY: SAIPEM QATAR LINE TRACKER APRIL 22, 2010 UP TO PRESENT UREA & AMMONIA FERTILIZER PLANT MESSAIEED INDUSTRIAL, DOHA, QATAR

DUTIES AND RESPONSIBILITIES


Conduct safety tool box meeting, like proper usage of PPE and give instructions the safest method to prevent accident. Received work schedule from piping engineer. Received direct instruction from site supervisor. Reviewed work schedule/instructions from piping foreman. Planning and scheduling for the designated area as per priority schedule according to the field constructions and general plans. Lay-out of underground piping in their orientation and elevation using piping plan and isometric drawing.

Responsible for pre-walk down inspections with QA/QC inspectors


prior for final inspections. commissioning.

Responsible for closing the test packages prior for hydro testing. Responsible for reinstatement activities prior to hand-over for pre-

EMPLOYER: POSITION:
PERIOD :

SAIPEM SAUDI ARABIAN COMPANY CHARGEHAND PIPING

SEPTEMBER 29,2007 UP TO JULY 01,2009

PROJECT: COUNTRY:

GAS & OIL SEPARATOR PLANT (GOSP) KINGDOM OF SAUDI ARABIA (K.S.A.)

DUTIES AND RESPONSIBILITIES


Conduct safety tool box meeting, like proper usage of PPE and give instructions to the safest method to prevent accident. And to remind all subordinates regarding work progress and project status. Checking of cold work and hot work permit. Responsible for all the requirements needed specially confine space and removal of gratings for workers assurance and security. In-charge in getting all As-Built dimensions which corresponds to underground and above ground piping systems. Responsible for the fabrication works, and site erections/installations works such as; Fuel Gas line, Condensate drain line, Flare vent line, Nitrogen line, Compressed Air line, Utility air/water and Fire Fighting system. And to make sure that every activity is on scheduled. In case of obstructions, responsible in preparing plans for re-routing using isometric drawing. Checking and analyzing actual work condition for the daily activities and identify any possible hazard. Supervision of spool erection to prevent wrong orientation and elevation. Prepare and review the plan drawing, Isometric drawing and P&ID to insure that the said drawings are detailed based on the plan as well as P&ID, and scheduled all required equipments and manpower. Giving latest information when there is (FDN) Field Design Notice. Responsible for pre-walk down inspections with QA/QC inspectors prior for final inspections. Responsible in gathering and preparation of all daily reports to be submitted to the site supervisor. Checking the pipelines to know that balance work or materials as well as the as built status.

Remind and distribute daily piping works activities to pipe fitters for
pipe spool fabrication and site installation/erections. commissioning.

Responsible for closing the test packages prior for hydro testing. Responsible for reinstatement activities prior to hand-over for pre-

EMPLOYER: POSITION: PERIOD: PROJECT: COUNTRY: EMPLOYER: POSITION: PERIOD: PROJECT: COUNTRY: EMPLOYER: POSITION: PERIOD: PROJECT: COUNTRY: EMPLOYER: POSITION: PERIOD: PROJECT: COUNTRY:

DESCON PIPE FITTER DECEMBER 21, 2005 UP TO JANUARY 06, 2007 DOLPHIN ENERGY LTD. RAS LAFFAN, QATAR CTCI-ACCGI METAPHIL PIPE FITTER SEPTEMBER 02, 2004 UP TO FEBRUARY 28, 2005 PETRON BATAAN REFINERY BATAAN, PHILIPPINES J6C-ACCGI METAPHIL DIVISION PIPE FITTER JANUARY 15, 2003 UP TO JULY 19, 2004 PETRON BATAAN REFINERY LIMAY, BATAAN, PHILIPPINES TSUNEISHI PIPE FITTER OCTOBER 2001 UP TO JULY 2002 SHIPYARD (FABRICATION) PROJECT BUANOY, BALAMBAN, CEBU, PHILIPPINES

DUTIES AND RESPONSIBILITIES Received direct instruction from site supervisor. Received work schedule from piping foreman. Responsible for fit-up and fabrication of carbon steel pipes,

stainless steel pipes, galvanized iron pipes and copper pipes. Responsible for erection and installation of chilled water line, fire fighting system, sprinkler system and fire hose reel system.

Responsible for installation at mechanical room connection such


as; fire pumps, gate valves, ball valves, butterfly valves, check valves etc. Responsible for pipe support fabrication and installation. Prepare daily work progress report to be submitted to the piping foreman.

PERSONAL DETAILS:
Age Date of Birth Civil Status Sex Nationality Religion Height Weight Permanent address Email address: Contact nos.: 30 Years Old September 26, 1979 Married Male Filipino Roman Catholic 6 0 120 Lbs. Cabulihan, Toledo City esayjohn@yahoo.com 0063-9283930794 / 0063-4018345

EDUCATION:
Elementary High School Vocational Course College Date Graduated: 1993 ~ 1994 Date Graduated: 1997 ~ 1998 Date Attended: 02/07 ~ 14/12/2003 Date Graduated: (undergrad)

SPECIAL SKILLS: Driving (light vehicle only) Mechanical / Piping works


I hereby certify that all information is true and correct to the best of my knowledge.

Applicant Signature

You might also like