You are on page 1of 6

Annexure - A

Gujarat Green Revolution Company Ltd.


ADC Building, P. O. Fertilizernagar - 391 750

Revised Unit Cost (Jantri) per hac. for Drip Irrigation System with & without inclusion of water sump cost w.e.f. 15.10.2011 (Figures in Rs.)
Crop Spacing / Lateral Spacing (Mtr.)
Lateral
Size

12 mm

16 mm

Particular

12 x 12
10 x 10
and
above

9X9

8X8

6X6

5X5

4X4

3X3

3 X 1.5 2.5 X 2.5

2X2

1.5 X 1.5

1.25X1.25

1X1

Sump size-40m3

Total MIS Cost

39820

40974 42063 46435 50340 53220 52759 59773 65011

71971

79473

91827

103251

121902

Sump size-25m3

Total MIS Cost

34295

35449 36538 40910 44815 47695 47234 54248 59486

66446

73948

86302

97726

116377

Sump size-20m3

Total MIS Cost

32170

33324 34413 38785 42690 45570 45109 52123 57361

64321

71823

84177

95601

114252

Sump size-13m3

Total MIS Cost

28895

30049 31138 35510 39415 42295 41834 48848 54086

61046

68548

80902

92326

110977

Total MIS Cost Excluding Sump Cost 17820

18974 20063 24435 28340 31220 30759 37773 43011

49971

57473

69827

81251

99902

Sump size-40m3

Total MIS Cost

41667

43201 44672 49152 54037 57570 58195 67383 72622

82278

92356 108897

123690

147293

Sump size-25m3

Total MIS Cost

36142

37676 39147 43627 48512 52045 52670 61858 67097

76753

86831 103372

118165

141768

Sump size-20m3

Total MIS Cost

34017

35551 37022 41502 46387 49920 50545 59733 64972

74628

84706 101247

116040

139643

Sump size-13m3

Total MIS Cost

30742

32276 33747 38227 43112 46645 47270 56458 61697

71353

81431

97972

112765

136368

19667

21201 22672 27152 32037 35570 36195 45383 50622

60278

70356

86897

101690

125293

Total MIS Cost Excluding Sump Cost

Note:
1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be irrigated, due to this requirment of PVC / HDPE pipe or double
lateral line in case of wider crop spacing or selection of components from within the approved list with variable dimention or components other than considered for working out
unit cost per ha may be needed due to requirement of design consequently exceeding the above unit cost. GGRC will consider 5% deviation in the above cost for the purpose of
calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be calculated on the pro rata bases of the nearest plant spacing. The
assistance amount shall be calculated as per the unit cost of the nearest spacing of plants.
3. In case of Disc / Screen filter, the cost will be calculated considering the rate of Screen filter for the purpose of calculation of Govt. Contribution
4. Cost of Micro Tube will be considered in place of online emitter wherever needed and prefered by farmer.
4.1 Use of Micro tube is allowed throughout Gujarat across the MIS Suppliers, if irrigation water is of bad quality and meets anyone or all water analysis parameter as described
below
i) Irrigation water having Fe content equal to or more than 0.1 Mg/litre ii) Irrigation water with TSS (TDS) level equal to or more than 2000 PPM. iii) Irrigation water with Residual
Sodium Carbonate (RSC) equal to or more than 2.5 Meq./litre

Annexure - B

Gujarat Green Revolution Company Ltd.


ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost (Jantri) per hac.for Mini (Impact) sprinkler Irrigation System with & without inclusion of water
sump cost w.e.f. 15.10.2011 (Figures in Rs.)
Crop Spacing / Lateral Spacing (Mtr.)
Lateral
Size

25 mm

Particular
10 x 10

9X9

8X8

7.5 X 7.5

Sump size-40m3

Total MIS Cost

84885

92026 104156 110467 124034

Sump size-25m3

Total MIS Cost

79360

86501

98631 104942 118509

Sump size-20m3

Total MIS Cost

77235

84376

96506 102817 116384

Sump size-13m3

Total MIS Cost

73960

81101

93231

99542 113109

62885

70026

82156

88467 102034

Total MIS Cost Excluding Sump Cost

32 mm

11 x 11

Sump size-40m4

Total MIS Cost

93078 100989 114113 121665 135977

Sump size-25m4

Total MIS Cost

87553

95464 108588 116140 130452

Sump size-20m4

Total MIS Cost

85428

93339 106463 114015 128327

Sump size-13m4

Total MIS Cost

82153

90064 103188 110740 125052

71078

78989

Total MIS Cost Excluding Sump Cost

92113

99665 113977

Note:

1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be
irrigated, due to this requirment of PVC / HDPE pipe or double lateral line in case of wider crop spacing or selection
of components from within the approved list with variable dimention or components other than considered for
working out unit cost per ha may be needed due to requirement of design consequently exceeding the above unit
cost. GGRC will consider 5% deviation in the above cost for the purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be
calculated on the pro rata bases of the nearest plant spacing. The assistance amount shall be calculated as per the
unit cost of the nearest spacing of plants.

Annexure - C

Gujarat Green Revolution Company Ltd.


ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost (Jantri) per hac.for Porous pipe based Irrigation System with & without inclusion of water sump cost w.e.f. 15.10.2011 (Figures in Rs.)
Crop Spacing / Lateral Spacing (Mtr.)
Lateral
Size

9 mm

12 mm

16 mm

22 mm

Particular

12 x 12
and
above

10 x 10

9X9

8X8

6X6

5X5

4X4

3X3

3 X 1.5

2.5 X 2.5

2X2

1.5 X 1.5

1.25 X
1.25

1X1

Sump size-40m3

Total MIS Cost

55466

58051

59923

62191

69101

74807

76295

96842

130129

111073

100290

119657

135136

158367

Sump size-25m3

Total MIS Cost

49941

52526

54398

56666

63576

69282

70770

91317

124604

105548

94765

114132

129611

152842

Sump size-20m3

Total MIS Cost

47816

50401

52273

54541

61451

67157

68645

89192

122479

103423

92640

112007

127486

150717

Sump size-13m3

Total MIS Cost

44541

47126

48998

51266

58176

63882

65370

85917

119204

100148

89365

108732

124211

147442

Total MIS Cost Excluding Sump Cost

33466

36051

37923

40191

47101

52807

54295

74842

108129

89073

78290

97657

113136

136367

Sump size-40m3

Total MIS Cost

57566

60554

62722

65320

73265

79813

80937

104806 144397

121086

111667

134828

153340

181122

Sump size-25m3

Total MIS Cost

52041

55029

57197

59795

67740

74288

75412

99281

138872

115561

106142

129303

147815

175597

Sump size-20m3

Total MIS Cost

49916

52904

55072

57670

65615

72163

73287

97156

136747

113436

104017

127178

145690

173472

Sump size-13m3

Total MIS Cost

46641

49629

51797

54395

62340

68888

70012

93881

133472

110161

100742

123903

142415

170197

Total MIS Cost Excluding Sump Cost

35566

38554

40722

43320

51265

57813

58937

82806

122397

99086

89667

112828

131340

159122

Sump size-40m3

Total MIS Cost

59666

63057

65521

68449

77429

84820

85579

112770 158664

131098

123045

149998

171544

203877

Sump size-25m3

Total MIS Cost

54141

57532

59996

62924

71904

79295

80054

107245 153139

125573

117520

144473

166019

198352

Sump size-20m3

Total MIS Cost

52016

55407

57871

60799

69779

77170

77929

105120 151014

123448

115395

142348

163894

196227

Sump size-13m3

Total MIS Cost

48741

52132

54596

57524

66504

73895

74654

101845 147739

120173

112120

139073

160619

192952

Total MIS Cost Excluding Sump Cost

37666

41057

43521

46449

55429

62820

63579

90770

136664

109098

101045

127998

149544

181877

Sump size-40m3

Total MIS Cost

65528

69947

73148

76969

88620

98174

99413

134084 190840

157407

146413

181013

208673

250179

Sump size-25m3

Total MIS Cost

60003

64422

67623

71444

83095

92649

93888

128559 185315

151882

140888

175488

203148

244654

Sump size-20m3

Total MIS Cost

57878

62297

65498

69319

80970

90524

91763

126434 183190

149757

138763

173363

201023

242529

Sump size-13m3

Total MIS Cost

54603

59022

62223

66044

77695

87249

88488

123159 179915

146482

135488

170088

197748

239254

Total MIS Cost Excluding Sump Cost

43528

47947

51148

54969

66620

76174

77413

112084 168840

135407

124413

159013

186673

228179

Note:

1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be irrigated, due to this requirment of PVC / HDPE pipe or double lateral line in case of wider crop spacing or selection of
components from within the approved list with variable dimention or components other than considered for working out unit cost per ha may be needed due to requirement of design consequently exceeding the above unit cost. GGRC will
consider 5% deviation in the above cost for the purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be calculated on the pro rata bases of the nearst plant spacing. The assistance amount shall be calculated as per the unit cost of the
nearst spacing of plants.
3. In case of Disc / Screen filter, the cost will be calculated considering the rate of Screen filter for the purpose of calculation of Govt. Contribution

Annexure - D

Gujarat Green Revolution Company Ltd.


ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost/Ha. (Jantri) per hac.for Drip Tape based Irrigation System with & without inclusion of water sump w.e.f. 15.10.2011 (Figures in Rs.)
Crop Spacing / Lateral Spacing (Mtr.)
Lateral
Size

Particular

12 x 12
and
above

10 x 10

9X9

8X8

6X6

5X5

4X4

3X3

3 X 1.5

2.5 X 2.5

2X2

1.5 X 1.5

1.25 X
1.25

1X1

Sump size-40m3

Total MIS Cost

47077

48097

48790

49639

52213

54258

57345

62484

62484

66574

72719

82988

91173

103504

Sump size-25m3

Total MIS Cost

41552

42572

43265

44114

46688

48733

51820

56959

56959

61049

67194

77463

85648

97979

12.5 mm
(wall
Sump size-20m3
thickness
0.40 mm)

Total MIS Cost

39427

40447

41140

41989

44563

46608

49695

54834

54834

58924

65069

75338

83523

95854

Sump size-13m3

Total MIS Cost

36152

37172

37865

38714

41288

43333

46420

51559

51559

55649

61794

72063

80248

92579

Total MIS Cost Excluding Sump Cost

25077

26097

26790

27639

30213

32258

35345

40484

40484

44574

50719

60988

69173

81504

Sump size-40m3

Total MIS Cost

48761

50113

51032

52159

55574

58290

62385

69206

69206

74638

82799

96429

107300

123664

Sump size-25m3

Total MIS Cost

43236

44588

45507

46634

50049

52765

56860

63681

63681

69113

77274

90904

101775

118139

Total MIS Cost

41111

42463

43382

44509

47924

50640

54735

61556

61556

66988

75149

88779

99650

116014

Total MIS Cost

37836

39188

40107

41234

44649

47365

51460

58281

58281

63713

71874

85504

96375

112739

Total MIS Cost Excluding Sump Cost

26761

28113

29032

30159

33574

36290

40385

47206

47206

52638

60799

74429

85300

101664

Sump size-40m3

Total MIS Cost

50063

51672

52766

54108

58173

61408

66283

74404

74404

80875

90595

106823

119773

139255

Sump size-25m3

Total MIS Cost

44538

46147

47241

48583

52648

55883

60758

68879

68879

75350

85070

101298

114248

133730

Total MIS Cost

42413

44022

45116

46458

50523

53758

58633

66754

66754

73225

82945

99173

112123

131605

Total MIS Cost

39138

40747

41841

43183

47248

50483

55358

63479

63479

69950

79670

95898

108848

128330

Total MIS Cost Excluding Sump Cost

28063

29672

30766

32108

36173

39408

44283

52404

52404

58875

68595

84823

97773

117255

Sump size-40m3

Total MIS Cost

47916

49102

49907

50895

53888

56267

59857

65834

65834

70593

77742

89686

99210

113550

15.875
mm (wall
thickness Sump size-20m3
0.508
mm)

Sump size-13m3

15.875
mm (wall
thickness Sump size-20m3
0.635
mm)

Sump size-13m3

Sump size-25m3

Total MIS Cost

42391

43577

44382

45370

48363

50742

54332

60309

60309

65068

72217

84161

93685

108025

16.5 mm
(wall
thickness Sump size-20m3
0.40 mm)

Total MIS Cost

40266

41452

42257

43245

46238

48617

52207

58184

58184

62943

70092

82036

91560

105900

Sump size-13m3

Total MIS Cost

36991

38177

38982

39970

42963

45342

48932

54909

54909

59668

66817

78761

88285

102625

Total MIS Cost Excluding Sump Cost

25916

27102

27907

28895

31888

34267

37857

43834

43834

48593

55742

67686

77210

91550

Note:

1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be irrigated, due to this requirment of PVC / HDPE pipe or double lateral line in case of wider crop spacing or selection of components
from within the approved list with variable dimention or components other than considered for working out unit cost per ha may be needed due to requirement of design consequently exceeding the above unit cost. GGRC will consider 5%
deviation in the above cost for the purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be calculated on the pro rata bases of the nearst plant spacing. The assistance amount shall be calculated as per the unit cost of the nearst
spacing of plants.
3. In case of Disc / Screen filter, the cost will be calculated considering the rate of Screen filter fot the purpose of calculation of Govt. Contribution

Annexure - E

Gujarat Green Revolution Company Ltd.


ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost (Jantri) for sprinkler irrigation system for 1 Ha. & 2 Ha. Set. w.e.f. 15.10.2011 (Figures
in Rs.)

Coupler Diameter
Particular

Total MIS Cost

63 MM (1 Hac)

75 mm (2 Hac)

19505

31178

Note:
For every increase in Hectare unit above 2 hac. Installation for Sprinkler Irrigation System, addition of Rs. 4000
/ - will be considered.

Annexure - F

Gujarat Green Revolution Company Ltd.


ADC Building, P. O. Fertilizernagar - 391 750
Unit Cost (Jantri) for Rain Gun Sprinkler Set for 1 Ha. & 2 Ha. w.e.f. 15.10.2011
(Figures in Rs.)

Note:-

Particular

1 Hac

2 Hac

Total MIS Cost ( A + B)

15612

22217

1. When irrigated area is below 1 ha. then


MIS cost will be reduced proportionately to area and reference MIS cost will be existing MIS
cost of 1 Ha. per Set.
2. When irrigation area is between 1 & 2 Ha. then
For working out MIS cost, differential amount between existing MIS cost of 1 Ha. per set and 2
Ha. per set will be added in 1 Ha. set, proportionate to increase in area from 1 Ha. to 2 Ha.

You might also like