CONTAINER CONCEPT
Containerized SWRO
THIS MEANS:
No need for expensive buildings
No time consuming and costly civil works
All what the clients need to do is to arrange for the Seawater supply and the Electricity, and a foundation for the container
Installation Procedure:
The following is a presentation of the installation of a HOH Standard Containerized SWRO Desalination Plant, with a capacity of 300m/day, producing potable water
The Playa Roca Resort, Lanzarote, Canary Islands, Spain where the installation took place - Aug.11, 2003
Installation site prepared by local contractor with power supply and connection pipes to feed water well, product water reservoir and brine disposal injection well.
The 300 m/day plant fully assembled in 20-ft container arrives at Resort at 8:00 AM
A local crane contractor prepare to remove the containerized plant from the truck - 8:15 AM
Crane contractor moving the containerized plant from the truck towards it's permanent location 9:00AM
- ready for the HOH technician to commission and to perform training of the local operator and maintenance technicians
Close-up view of the plant with a capacity of 300 m/day producing high quality potable water at $0.70/m
Inside view of 250 m/day containerized plant installed at another Island Resort
Inside view of 300 m/day containerized plant installed at International Hotel & Beach Resort, Spain
www.HOHUSA.net
Contact: Phone: 706 694 8869 Facsimile: 706 694 4124 - Email: info@HOHUSA.net
Gunnar A. Axelsen,
President