You are on page 1of 24

present

The Reverse Osmosis Seawater Desalination

CONTAINER CONCEPT

The Energy Efficient Low Maintenance Containerized

Reverse Osmosis Seawater Desalination Plants

The Containerized Solution

Containerized SWRO

THE CONTAINER CONCEPT


- takes the expenses and mystery out of seawater RO Desalination and brings it DOWN-TO-EARTH - by making pre-designed module sized plants, fully assembled in standard 20-ft and 40-ft containers

and install them right where the potable water is needed.

THIS MEANS:
No need for expensive buildings
No time consuming and costly civil works

No advanced calculations and projecting procedures


- but reduced costs
-due to an extremely short installation, commissioning and training schedule of only 1 week compared to a 3-4 month installation time for a conventional NON containerized plant.

Its all there:


inside the container, fully tested before shipping, ready to produce high-quality potable water within days of delivery.

All what the clients need to do is to arrange for the Seawater supply and the Electricity, and a foundation for the container

The Container Concept includes:


for clean seawater from beach well 250m/day One (1) 20-ft container 300m/day One (1) 20-ft container 500m/day One (1) 40-ft container 1000m/day One (1) 40-ft container for seawater requiring pre filtration 250m/day One (1) 40-ft container 300m/day One (1) 40-ft container 500m/day Two (2) 40-ft containers 1000m/day Two (2) 40-ft containers

- and as the example on the following page

A 300 m/day plant like this!

Installed in a 20-ft container

Produce all the potable water requirements for this resort

Installation Procedure:
The following is a presentation of the installation of a HOH Standard Containerized SWRO Desalination Plant, with a capacity of 300m/day, producing potable water

with a TDS of less than 500 ppm, as recommended by


the WHO (World Health Organization). The feed water source is clean seawater from a seawater well with a TDS of 36,000 ppm.

The Playa Roca Resort, Lanzarote, Canary Islands, Spain where the installation took place - Aug.11, 2003

Installation site prepared by local contractor with power supply and connection pipes to feed water well, product water reservoir and brine disposal injection well.

The 300 m/day plant fully assembled in 20-ft container arrives at Resort at 8:00 AM

A local crane contractor prepare to remove the containerized plant from the truck - 8:15 AM

Crane contractor moving the containerized plant from the truck towards it's permanent location 9:00AM

Plant at installation site 9:15 AM

- and lowered into position 9:25 AM

Containerized plant at permanent location - 9:50 AM

- ready for the HOH technician to commission and to perform training of the local operator and maintenance technicians

Close-up view of the plant with a capacity of 300 m/day producing high quality potable water at $0.70/m

Inside view of 250 m/day containerized plant installed at another Island Resort

Inside view of 300 m/day containerized plant installed at International Hotel & Beach Resort, Spain

Thank you for viewing this presentation of the

HOH Container Concept


- and our

Containerized SWRO Plants