Professional Documents
Culture Documents
SHEET 2 OF 3
PLANT ITEM :HFO PRESSURISING PUMP PLANT NOMENCLATURE: LOCATION: FUEL OIL PUMP HOUSE REF: Sl.No.
11
ACTIVITY / CHECKS
Provision for adjustments maintenance and repairs is satisfactory. Correct lubricating oils and greases have been applied. Check that oil level in out board bearing can be adequately monitered. Confirm adequate facilities for filling and draining the oil. Confirm that pump is free to rotate. Confirm satisfactory coupling alignment values and that coupling is done. Confirm proper fitting of mechanical seals at both the ends of the screws. Confirm drainage facilities are satisfactory for the fluid being pumped. Verify that discharge side relief valve provided is calibrated (tested /Test certificate provided ). Check that all rotating parts (couplings,etc) are adequately guarded. Confirm that lifting lugs/eyes are rendered inoperable and (if applicable) holes plugged and threads identified.
STATUS YES / NO
REMARK
12 13
14 15 16
17
18
19
20
21
Name
Signature
Date
NTPC Comg.
NTPC Erec.
SHEET 3 OF 3
PLANT ITEM : HFO PRESSURISING PUMP PLANT NOMENCLATURE: LOCATION: FUEL OIL PUMP HOUSE REF: Sl.No.
22
ACTIVITY / CHECKS
Confirm pressure gauges and instruments are provided as per approved drawings. Confirm satisfactory operation of the relief valve. Confirm for no leakages from mechanical seals. As soon as the pump can be operated as part of a system, run the pump for preferably 8 hours to verify that vibration levels are within acceptable limits. Monitor the following parameters and record the stable levels: Pump Suction Pressure Pump Discharge Pressure Pump Speed Pump flow Pump Inboard Bearing Temperature Pump Outboard Bearing Temperature Pump Inboard Bearing Vibration Pump Outboard bearing Vibration Motor Starting Current and run Up time
STATUS YES / NO
REMARK
23 24 25
26
A B C D E F G H I
Name
Signature
Date
NTPC Comg.
NTPC Erec.
SHEET 1 OF 3
PLANT ITEM : HFO PRESSURISING PUMP PLANT NOMENCLATURE: LOCATION: FUEL OIL PUMP HOUSE REF: Sl.No.
1 2 3
ACTIVITY / CHECKS
Access to the plant item is adequate. Illumination in the plant area is adequate. Any other requisite safety provision is adequate for immediate commissioning activity. Plant item is in a clean condition. The name plant legend and tag no.agrees with the approved NTPC drawing and is clearly visible, properly fixed.
STATUS YES / NO
REMARK
4 5
Equipment is properly supported as per drawing, if applicable. Any damage to the equipment and its constituents. All necessary locks and keys for pad-locks, interlocks etc., are available. Hot surfaces lagged or screened sufficiently to provide protection for personnel. Painting / coating as per drawing and satisfactory.
7 8
10
Name
Signature
Date
NTPC Comg.
NTPC Erec.