PLN CONNECTION RAB APPROVAL

PROJECT :
NEPA MEGA

Date :
PLN Branch : BTL/AKLI : Subcon : Price Standard Connection 3.3 New Transformer 25 Additional Item more than 200m Multiguna/ Temporary connection Total Cost WHT 3% (if Applied) VAT 10% (Total Cost + WHT) Grand Total Remarks and Justification : Site ID Region North Sumatera

kVA kVA

IDR IDR IDR IDR IDR IDR IDR IDR

Agree

Disagree

PLN Coordinator Signature: Agree Date: Disagree

Review comments of the CME Manager

Signature:
Agree

Date:
Disagree

Review comments of the RPM / RPD

Herewith I commit that as RPM/RPD , I will fully responsible to mobilize all efforts to achieve the integration milestone for this site by the latest .. / / 20 .

Signature:
Agree

Date:
Disagree

Review comments of the TK Manager Signature:


Agree

Date:
Disagree

Review comments of the Project Director Signature: Review comments of Vice Director of Delivery and Service in the representative office
Agree

Date:
Disagree

Signature:

Date:

AS PLAN BOQ PLN CONNECTION


Site ID Site Name Subcontractor NO 1 TDL PLN BP (Biaya Penyambungan) UJL (Uang Jaminan Langganan) VA VA : : : ITEM UNIT QTY

Installation drawing

VA

Konsuil

VA

Cable for low tension (JTR) + Accessories LVTC 3x35 + 1x25 mm2 LVTC 3x50 + 1x35 mm2 LVTC 4x16 mm2 LVTC 4x25 mm2 LVTC 4x50 mm2 LVTC 4x70 mm2 NYY 4 x16 mm2 NYY 4 x50 mm2 NYY 4 x70 mm2 NYFGBY 4X16 mm2 Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter

Cable for MIDDLE tension (JTM) + Accessories AAAC 70 mm2 Meter

Pole Complete incl.all nec.Material for assembly (lumpsum) Pole 9m 90 daN Pole 11m 156 daN Pole Pole

Service performance / Upah Kerja Jaringan JTR / JTM : - for 0 - 4 Pole - for 5 - 8 Pole - for 9 Pole - up * Including all Service charges, transportation and performance charges LS LS LS

Document revision: 01 Date of issue: January 19, 2010 References:Tower Construction Start M8

2 of 4

Document title: BOQ PLN As Planned Document number: SID/WP[WP1,WP2,WP3]/09-9.15 Release status: Released

AS PLAN BOQ PLN CONNECTION


Site ID Site Name Subcontractor NO 8 : : : ITEM New travo completed incl.install material and service (Strandang, fuse cut out, cables, arrester etc). Travo Nego - Travo 25 KVA 1 Phase - Travo 25 KVA 3 Phase - Travo 50 KVA 1 Phase - Travo 50 KVA 3 Phase - Trafo 100 KVA 3 Phase Travo upgrading charges: - Upgrade/Mutation/ incl.Accesories for 25 KVA - Upgrade/Mutation/ incl.Accesories for 50 KVA - Upgrade/Mutation/ incl.Accesories for 100 KVA - Upgrade/Mutation/ incl.Accesories for 200 KVA - Upgrade/Mutation/ incl.Accesories for 250 KVA Add Work LS LS LS LS LS LS LS LS LS LS LS UNIT QTY

___________, _________________

Subcontractor

BOQ Checked By,

Pimpinan
BOQ Details verified by PT. HCPT

PLN Coordinator

SDP/CME

Document revision: 01 Date of issue: January 19, 2010 References:Tower Construction Start M8

3 of 4

Document title: BOQ PLN As Planned Document number: SID/WP[WP1,WP2,WP3]/09-9.15 Release status: Released

PLN DRAWING AS PLANNED


GAMBAR JARINGAN PLN Site ID Site Name No Tanda Gambar Lama Baru 1 2 3 4 5 6 7

Keterangan Druk Schoor Trek Schoor Tiang Beton Tiang Besi JTM JTR Transformator

BIRO TEKNIK LISTRIK

. PIMPINAN PT. HUAWEI TECH INVESTMENT

. PLN CONNECTION COORDINATOR

.. CME MANAGER

Revision number: 01 Date of issue: September 27, 2006 References: M8. Construction Start

4 of 4

Document title: PLN Drawing As Planned Document number: 3050 Release status: Released