3 6.1.

Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand)

Detail of Cost for 1 cum Material : Bricks F.P.S.bricks class designation 75 Cement mortar 1: 4 (1 Cement: 4 coarse sand) Sundries Labour: Mason (for brich work) 1st class Mason (for brick work)2nd class Coolie Bhishti Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 1 cum

1000 Nos. cum 1 time each each each each - -

0.494 2602 0.25 3.9 2.73 9999 0.36 0.36 1.37 0.2 0123 0124 0115 0101 - -

2800.00 3515.60 1.36 350.00 300.00 256.00 158.00 - -

1383.20 878.90 3.71 0.00 126.00 108.00 350.72 31.60 2882.13 28.82 2910.95 436.64 3347.60 33.48 3381.07 per cum

- -

Say Rs. 3.9 Cement mortar 1: 4 (1 Cement: 4 coarse sand) Detail of Cost for 1 cum Material : Portland Cement Coarse sand (zone III) Labour : Beldar Bhishti Hire and running charges of mechanical mixer Sundries L.S. Provision Total

3381.10

tonne cum each each 1 time 1 time - -

0.38 0367 1.07 0982 0.75 0114 0.07 0101

5400.00 1120.00 256.00 260.00

2052.00 1198.40 0.00 192.00 18.20

26.91 9999 1.36 36.60 13.52 9999 1.36 18.39 - - - 3515.58 Say Rs. 3515.60 per cum

1 15.2.1

Demolishing cement concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer-in-Charge 1:3:6 or richer mix. Detail of Cost for 1 cum Labour : Beldar Coolie Sundries L.S. Provision Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 1 cum Say Rs.

each each 1 time - -

- -

1.59 0114 0.72 0115 4.81 9999 - -

256.00 256.00 1.36 - -

407.04 184.32 6.54 597.90 5.98 603.88 90.58 694.46 6.94 701.41 701.40 per cum

Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth lead upto 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed: All kinds of soil 2.1.1 Detail of Cost for 100 sqm Labour : Beldar Coolie Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 100 sqm Say Rs.

each each - -

- -

7.2 0114 6 0115 - -

256.00 256.00 - -

1778.40 1482.00 3260.40 32.60 3293.00 493.95 3786.95 37.87 3824.82 3824.8 per 100 sqm

Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth evel: 1:4: 8 (1cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) Detail of Cost for 1 cum Material : Stone Aggregate (Single size) 40 mm nominal size Stone Aggregate (Single size) 20 mm nominal size Coarse sand (zone III) Portland Cement Labour : Mason (average) Beldar Bhishti Hire charges for Concrete Mixer 0.14 cubic metre Hire charges for Vibrator (Needle type 40mm) Sundries L.S. Provision Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 1 cum

4.1.8

cum cum cum tonne each each each day day 1 time - -

0.65 0293 0.24 0295 0.47 0982 0.17 0367 0.1 0155 1.63 0114 0.7 0101 0.07 0002 0.07 0012 13.52 9999 - - -

950.00 1050.00 1120.00 5400.00 325.00 256.00 158.00 500.00 250.00 1.36 - -

617.50 252.00 526.40 918.00 0.00 32.50 417.28 110.60

35.00 17.50 18.39 2945.17 29.45 2974.62 446.19 3420.81 34.21 3455.02 3455.00 per cum

Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required . In gratings, frames, guard bar, ladders, railings, brackets, gates and similar works. Detail of Cost for 21.8 kg Material : Flats upto 10mm in thickness Mild steel round bar 12mm dia and below Welding By electric plant Labour : Blacksmith 1st class Beldar Bandhani Applying priming coat with ready mixed red oxide zinc chromate primer of on steel galvanised iron / steel work Sundries L.S. Provision Total Add 1% for Water Charges Except marked R in Ref. Column Add 15% for Contractor's Profit & Overheads Except marked R in Ref. Column Add 1% for Labour Cess Except marked R in Ref. Column Cost For 21.8 kg Cost for 1 kg Say Rs. quintal quintal cm each each each 0.145 1008 0.084 1002 60 1215 0.7 0102 0.5 0114 0.25 0100 3700.00 4000.00 1.45 350.00 256.00 148.00 536.50 0.00 336.00 87.00 0.00 245.00 128.00 37.00

10.25.2

sqm 1 time - -

- -

0.6 13.50.3 15.00 4.55 9999 1.36 - - -

9.00 6.19 1384.69 13.85 1398.53 209.78 1608.32

16.08 1624.40 74.51 74.50 per Kg

Providing and laying C.C. pavement of mix M-30 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vaccum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately). Detail of Cost for 1 cum Material : P/L RMC grade M-30, all works upto floor V cum level i/c admixture if required. Operational charges for vaccum dewatering system i/c screed vibration, placing of filter 1 time mat, top mat, vaccum process, floating trowelling, brooming etc. T&P charges i/c consumeable power charges, loading, unloading and hire charges of 1 time equipments - Total Add 1% for Water Charges Except marked R in Ref. Column Add 15% for Contractor's Profit & Overheads Except marked R in Ref. Column Add 1% for Labour Cess Except marked R in Ref. Column Cost For 1 cum Add providing richer or leaner mixes respectively. Providing M-30

16.75

1.0000

5.37

####### #######

#######

9999

1.36

77.79

####### - -

9999 - -

1.36 - -

56.58 ####### 58.04 ####### 879.25 ####### 67.41

As per annexure Total Rs. Say Rs.

####### 65.40 ####### #######

Providing and laying in position ready mixed concrete manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for rinforced cement concrete work including pumping of R.M.C. from trnasit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in reommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-Charge. M-25 grade Reinforced cement concrete by using 410 kg of cement per cum of concrete. All works up to plinth level. 5.37 Detail of Cost for 1 cum Material : Stone Aggregate (Single size) 20 mm nominal size Stone Aggregate (Single size) 10 mm nomianl size Coarse sand (zone III) Portland Cement Chemicals Plasticizer /super plasticizer k Production cost, carriage to site, pumping to respective floors and laying in position: Hire charges for Production cost of concrete by batch mix plant Hire charges for Carriage of concrete by transit mixer Hire charges for Pumping charges of concrete including Hire charges of pump, piping work & accessories etc. Labour for pouring, consolidating & curing Mason (average) Beldar Bhishti Hire charges for Vibrator (Needle type 40mm) Sundries L.S. Provision Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 1 cum Say Rs. each each each day 1 time - 0.1700 2.0000 0.9000 0.0700 ####### - 0155 0114 0101 0012 9999 - -

cum cum cum tonne kg

0.5700 0.2800 0.4250 0.4100 2.0500

0295 0297 0982 0367 7318

1050.00 #######

598.50 294.00

1120.00 476.00 5400.00 ####### 35.00 71.75 0.00

cum - cum

1.0000 ####### 1.0000

0004 0029 0009

200.00 18.00 80.00

200.00 180.00 80.00 0.00

325.00 55.25 256.00 512.00 260.00 234.00 200.00 14.00 1.36 17.68 - ####### 49.47 ####### 749.50 ####### 57.46 ####### 5803.60 per cum

4 13.9.1

Cement plaster 1:3 (1 cement :3 coarse sand) finished with a floating coat of neat cement: 12 mm cement plaster Detail of Cost for 10 sqm Material : Cement mortar 1: 3 (1 Cement: 3 coarse sand) cum Labour : Mason (average) each Coolie each Bhishti each Scaffolding and sundries 1 time Portland Cement tonne Mason (average) each Coolie each Scaffolding and sundries 1 time Total - Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 10 sqm Cost for 1 sqm Cement mortar 1: 3 (1 Cement: 3 coarse sand) Detail of Cost for 1 cum Material : Portland Cement Coarse sand (zone III) Labour : Beldar Bhishti Hire and running charges of mechanical mixer Sundries L.S. Provision Total

0.144 3.8 0.67 0.75 0.92 12.61 0.02 0.27 0.27 8.06 - 0155 0115 0101 9999 0367 0155 0115 9999 - -

3940.95 325 256 256 1.36 5400 325 256 1.36 - -

567.50 0.00 217.75 192.00 235.52 17.15 108.00 87.75 69.12 10.96 1505.75 15.06 ####### 228.12 ####### 17.49 1766.42 176.64

3.8

tonne cum each each 1 time 1 time - -

0.5100 1.0700 0.7500 0.0700 ####### ####### - -

0367 0982 0114 0101 9999 9999 - -

####### ####### ####### ####### 256.00 260.00 1.36 1.36 - 192.00 18.20 36.60 18.39 ####### per cum

7 5.28

Providing and fixing in position 12 mm thick bitumen impregnated fiber board confirming to IS: 1838 including cost of primer, sealing compound in expansion joint. Detail of Cost for 10 per cm depth per 100 m Material : Impregnated fibre board 12mm thick Bitumen solution primer of approved quality Bitumen hot sealing compound Grade A Carriage Labour : Mason (for brich work) 1st class Mason (for brick work)2nd class Beldar Sundries L.S. Provision Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 10 per cm depth per 100 m Cost for 1 per cm depth per 100 m Cost for 1 per cm depth per m Carriage of material by mechanical transport including loading, unloading and stacking complete; Lime, moorum, building rubbish, earth, manure or sludge and excaveted rock : Lime, moorum, building rubbish ; Detail of Cost for 8 cum Rate for 1 km Rate for 2 km Rate for 3 km Rate for 4 km Rate for 5 km Rate per km beyond 5 km upto 10 km lead Rate per km beyond 10 km upto 20 km lead Rate per km beyond 20 km lead Lead =5 km Rate for 5 km including Contractor's Profit & Overhead charges: Add 1% for Labour Cess

sqm litre

7.5000 1.2500

0339 0316 0314 9999 0123 0124 0114 9999 - -

279.00 40.00 25.00 1.36 350.00 300.00 256.00 1.36 - -

kilogram ####### 1 time ####### each each each 1 time - 0.1200 0.1200 0.2500 ####### - -

####### 0.00 50.00 0.00 787.50 36.60 0.00 42.00 36.00 64.00 36.60 ####### 31.45 ####### 476.50 ####### 36.53 3689.68 368.97 3.69

1.1.1

52.43 59.79 67.07 74.08 80.90 6.14 5.11 4.23 Rs. Rs. Rs. 80.9 0.81 81.71 per cum

Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry,but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20mm nominal size stone aggregate Detail of Cost for 10 sqm Material : Stone Aggregate (Single size) 20 mm nominal size cum Stone Aggregate (Single size) 10 mm nomianl size cum Coarse sand (zone III) cum Portland Cement tonne Labour : Mason (for brick work)2nd class each Beldar each Bhishti each Driver for Road Roller,Concrete Mixer,Truck etc. ach e Hire charges for Concrete Mixer 0.14 cubic metre day Sundries L.S. Provision 1 time Total - Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 10 sqm Cost for 1 sqm

11.3.1

0.267 0.089 0.178 0.17 0.8 1.4 1.04 0.03 0.03 40.43 - -

0295 0297 0982 0367 0124 0114 0101 0127 0002 9999 - -

1050 1050 1150 5400 325 256 260 300 500 1.36 - -

Say Rs.

289.10

280.35 93.45 204.70 918.00 0.00 260.00 358.40 270.40 9.00 15.00 54.98 2464.28 24.64 ####### 373.34 ####### 28.62 ####### 289.09 per sqm

Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) 5.1.2 Detail of Cost for 1 cum Material : Cement Concrete 1:1.5:3 Stone Aggregate (Single size) 20 mm nominal size Stone Aggregate (Single size) 10 mm nomianl size Coarse sand (zone III) Portland Cement Labour : Mason (average) Beldar Bhishti Hire charges for Concrete Mixer 0.14 cubic metre Hire charges for Vibrator (Needle type 40mm) Sundries Total Add 1% for Water Charges Add 15% for Contractor's Profit & Overheads Add 1% for Labour Cess Cost For 1 cum Say Rs.

cum cum cum tonne each each each day day 1 time - -

0.57 0295 0.28 0297 0.425 0982 0.4 0367 0.17 0155 2 0114 0.9 0101 0.07 0002 0.07 0012 14.3 9999 - -

1050.00 1050.00 1120.00 5400.00 325.00 256.00 260.00 500.00 250.00 1.36 - -

598.50 294.00 476.00 2160.00 0.00 55.25 512.00 234.00

- -

35.00 17.50 19.45 4401.70 44.02 4445.71 666.86 5112.57 51.13 5163.70 5163.70 per cum