You are on page 1of 10

CURRICULAM VITAE

Personal Information
Position applied for: Name: Fathers Name: Date of Birth: Permanent Address: Civil Sub Engineer Sujan Shrestha Hiraman Shrestha 2035/06/10, 26 September 1978 Khandbari Municipality-1, Sankhuwasabha District Koshi Zone, Nepal Tel No: 029560328 Temporary Address: Residence- Sitapaila-6, Kathmandu Contact No. 9841559204, 9849075203, E-mail Address: Sex: Marital Status: Religious Driving License No: Language Known: Sujan_ Shrestha480 @ Yahoo.com Male Married Hindu 08-61895(Motorcycle) Nepali, English, Hindi

Academic Qualification

Level

Examination Board

School/Campus

Division

Percentage

Year

SLC Diploma in Architectural Engineering(IE)

HMG,Nepal

Shreee Himalaya Secondary School Khandbari Institute of Engineering

First

69.86

1997 From 1997 to2000 (3Yrs)

Tribhuvan University

Thapathali Campus Kathmandu

First

70.00

Institute of Engineering Bachelor in Civil Engineering(BE) Tribhuvan University Kathmandu Engineering College, Kalimati, Kathmandu From 2003 to 2007(4Yrs)

Result Wait

Training

Course

Institute/College Global Software Engineering/Sunrise Computer Institute, Putalisadak, Kathmandu Pokhara Engineering College Phirke, Pokhara NIIT Computer Institute Mahendrapool, Pokhara Kathmandu Engineering College, Kalimati Kathmandu

Duration

Auto CAD 2000with 3D (1st June 2001 to 30th Aug 2001) Auto CAD 14 Version (Nov 21st 2002 to Jan 20th 2003) MS Word, MS Excel, MS PowerPoint 45 hrs Training in Auto CAD held in month of September 2007 45 hrs Training in SAP 2000 held in month of September 2007 One Day Seminar on Different Aspects of Transportation Engineering organized by Civil Engineering Student Society Nepal(CESS)

3 Months

2 Months

2 Months

1 and Months Kathmandu Engineering College, Kalimati Kathmandu 1 and Months

Pulchowk Engineering College

1 day Seminar July 28, 2006

Job Experience
From 10th September 2000 to 12th December 2000 Employer: M.D Consultancy, Jamemarket, Ghantaghar, Kathmandu

Responsibilities
General Building Design Works including Residential as well as
Commercial building Estimating and Costing of building Valuation of Land and Property

From 13th April 2001 to 11th October 2001

Employer: Kalika Construction Pvt. Ltd Bharatpur 10, Chitwan

Responsibilities
Day to day Supervision and Monitoring of Construction of Sauhara RCC Bridge of Span 70m Preparation of Working Drawing of Sauhara Bridge for the submission of Report

Preparation of Running bills for each and every Bridge Items

From 20th November 2001 to 15th July 2003 as a Civil Overseer

Employer: Second Tourism Infrastructure Development Project East Consult (P) Ltd, Lazimpat, Kathmandu In association with CEAD Consultants (P) Ltd, Pokhara Pokhara Sub Metropolis Pokhara Environmental Improvement Project (PEIP) ADB Loan No: 1451(SF)

Responsibilities
Day to Day Site Supervision, Monitoring and Quality Control of Construction activities of Landfill Area Development in Package No 2 Auto CAD Drawing work as related to Package No 2 for giving line and level for work proceeding to Contractor Detail Survey Work in 1.5 Ha Area of Sanitary Landfill Site in Gridwise of regular interval of 15m and taking its necessary Cross Section as well as Longitudinal Profile with the help of using Survey Instrument Theodolite and Level Machine. Involved in detailed Survey work initially start period of project for Access Road of Package No3 as supporting staff of Senior Surveyor and Engineer, by fixing of 20m interval Chainage upto 8 km Road alignment & finally taking its detail Cross Section from Amarsingh Chowk to Proposed Site of Landfill with the reference of already established BL during prefeasibility detail survey in the year 1998. The survey work carried out as per design. Overall Monitoring and Supervision of Access Road Package No-3 which mainly include supervision at Construction of different type and sizes retaining wall, different types of stone masonry side drain, NP3 Hume Pipe Culverts of various diameter, causeways etc and also Quality control of proctor density test up to 95% in Sub grade level, thickness of Sub base and base course and Black top WBM Course which mainly include Semi grouting Penmac surface road and checking other bituminious procedure related to road Construction Overall Day to Day Site Monitoring and Supervision of Septage and Solid Waste Management and Waste water Treatment Plant of Package No-1 which mainly detail survey work for giving line and level of different component like Septage settlement tank, sand drying bed, horizontal reed bed, vertical reed bed, surface water basin, storm water drain around the higher periferi of landfill site located 25m higher elevation of site, staff building etc. Supervision of building involved in Pkg -1 for staff building, vehicle and equipment shed, which include Quality control of all building items of work initially from substructure to superstructure and upto final finishing level Checking of running bills(Intirm payment Certificate)submitted by Contractor involving Landfill area Development Pkg No-2 as per their work item and making monthly progress report of all items Supervision and monitoring of Landfill area Development which mainly include Quality control for preparation on required slope in whole area as subgrade with proper compaction density for laying HDP Geomembrane for the purpose of possible outlet of liquid leachate flowing from higher elevation to lower elevation after stacking lots of solid waste over the whole landfill area, laying of 1mm HDP Geomembrane for prohibition of leachate under beneath the GL and not allow to polluted underground water table,laying of jute mat over Geomembrane,30cm thick clean river bed shingles,Laying of perforated pipe at toe of landfill site throught out (3x1x0.30) size gabion Box, Construction of brick masonry trapezoidal drain at the toe of whole area, establishing of gas vent pipe & construction of different sizes manhole at various grid corner points etc. Supervision of different other Civil works related to three package of project as per design like as E/W in Excavation,E/W in filling, Gabion work , Spur work, bituminous work, Fencing work, providing Concentina barbed wire fencing for enclosing boundary of site etc

Employer: as JV of Multiple offices From 25th Janauary 2008 to 30th Nov 2008 as a Jr. Civil Engineer 1) Integrated Development Consultant Pvt. Ltd 63-Swarnapur Galli, Gaurighat Kathmandu

2) Infrastructure Development Consultant Nepal


Pvt Ltd, Kathmandu, Nepal

3) C.K Engineering Consultant Pvt Ltd Kumarigal, Kathmandu Nepal

4)Janaki Women Awareness Society Nepal(JWAS)

5) Rajshreee Janak National Foundation for Research and Development (RAJANFORD)

Responsibilities
Preparation of Report with the aid of Auto CAD on Detail Survey Design and Prefeasiability Study of Urban Environment in Charikot Bhimeshwor Municipality Project No K2G - 016- F Under Employer of Town Development Fund which include Storm Water Drainage System, Bus Park Design and Waste Water treatment plant Preparation of Report with the aid of Auto CAD on Detail Survey, Design and Cost Estimate of Kabahigoth -Bariyarpur - 13 km (MRM) Road Project ( 6.5 km Section)and Bahuari- SimraungadhAruwa Nadi Road Project (6.5 Km Section) Under Rural Access improvement and Decentralization Project(RAIDP) Office of the District Development Committee, Bara Detail Survey in Core area of Gulariya Municipality with team works in the month of March 2008 till 10 days with reference from Checklist under the employer of Town Development Fund and corresponding Municipal Office Bardia District. The Survey work include that detail Cross Section of whole existing road network of Municipality up to 22 km in Chainagewise, participating in discussion programme in local community people for determination about recent ward wise population and related documents history of flooding and water logging due to rain water

including flood by near by river (Sarju and babai) possible outlet points of proposed drain their condition including flooding ,topography, downstream use of river discharge, existing waste disposal system and practice involving hygiene and environment existing sources of water pollution, Hierarchy of road study stretch, present water supply system and pattern water consumption pattern and rate. Design of Prefeasibility Study of Storm Water Drainage System as well as preparation of Master plan with the aid of Auto CAD of Urban area of Gulariya Municipality under the Employer of Town Development Fund and Corresponding Municipal office Bardiya District Participating in Detail Presentation Work Organized by Gulariya Municipality about Detail Survey and Design of Prefeasibility Study of Storm Water Drainage System as well as preparation of Master plan of Urban area of Gulariya Municipality with local Community people held on the month of September 15 to 20 2008 Preparation of Draft master Plan Report with the aid of Auto CAD for Design and detail Engineering of Storm water Drainage System of Gulariya Municipality (Project No K2G-044-F) under the employer of TDF with corresponding municipality Participate in Meeting organized by Asian Development Bank, Bishalnagar on dated 2 nd April 2008,for the purpose of selecting Consultants from short listing individually in different project works by grading their own technical as well as financial score obtained. The different project include is Galchi-Trishuli Road,Tamakoshi-Manthali-Khurkot Road(55km),Phidim-Taplejung Road and Janakpur-Dhalkebar road respectively Preparation of Technical and financial Submission on form for Monitoring and Evaluation of Batch VII,VIII and IX Schemes (Package 1 and 2) which being submitted to Rural Water Supply and Sanitation form Development Board (RWSSFDB) Lazimpat Kathmandu on dated 10th Nov 2008 Preparation and Submission of Expression of Interest for Inclusion of Consulting firm in Standard List for Bridge Related Consulting Services to be carried out in FY 065/066 which being submitted to Department of Road, Planning and Design Branch ,Bridge Unit, Babarmahal, Kathmandu Participate in one day Discussion meeting held in Department of Irrigation ,Jawalakhel ,Irrigation and Water Resources Management Project(IWRMP) about submission of Proposal for External Monitoring and Evaluation Support of Irrigation which being held in 19th Nov 2008 Participate in One day Discussion meeting held in Department of Irrigation, Jawalakhel Community Managed Irrigated Agriculture Sector Project (CMIASP) Performance of local Consultants(November 26, 2008)

Employer: From 1st December 2008 to till date Jr Civil Engineer Padma Merchant Company Pvt Ltd Sitapaila-6, Kathmandu

Responsibilities
Preparation of daily Report of Construction site from particular Building Plots where construction work effective continuously and submit same report to managing Director on the same day Preparation of drawing of Residential building as per design of Colony with the aid of Auto CAD Day to Day site supervision and Monitoring which include Quality Control of Different Civil works in building Project like RCC Reinforcement work, Plastering work,PCC and Punning work, pipe fitting work, Plaster of Paris work, Crazy flooring work, E/W in excavation and built up Stone masonry retaining wall as well as other supporting wall, RCC Shear wall in back elevation of building, Brick laying work etc Checking of running bills submitted by the Contractor and Sub Contractor in particular period of certain finished item of work which include tally of such bills as per detailed measurement. Daily tentative measurement of construction item of work in site and taken necessary signature from Contractor or Contractor representative. as per condition for progress sheet. Learnt about different idea and tricks related to building construction in engineering field by hired external structural expert once a week and shearing lots of problems faced during the construction period. Auto CAD Drawing work of land by different method like radius circle method, regenerating and remodifying drawing work of residential building of colony or related to colonys client as per companys requirement. Auto CAD Drawing work of different types of residential building as per standard of Architectural Drawing with the Aid of software 3D Home plans Supervision of other different Miscellaneous Civil Work as per site topography condition which include different design types of stone masonary wall with (1:6) cement mortar, Construction of Gabion wall of size (3mX 1mX1m) and (2mX 1mX1m) at the edge of existing stream of site near the existing Mineral water factory) Discussion about construction of modern type of retaining wall at site near water factory in sloppy ground like Crib wall in the edge of existing stream , the explanation was described by related expert of wall from EMCIT Heavy Industries Pvt Ltd, Pimphali, Thankot Kathmandu Detail Survey work for Design of Sewerage pipeline, storm water drainage pipe line in whole area of colony including outlet points from each and every building plots Supervision of construction of Manholes, laying of NP2 Hume pipes, construction of Septic Tank of Size (256x 146) at lowest elevation point near the water factory. Detail Survey work, rate analysis of different item of road work and taking line and level for Access Road Construction and upgrading works including multiple categories of road in different chainage likewise Semi grouting Penmac Road in Sloppy portion total in length 190m and Premix carpet in remain portion upto length of 440m which helps to improve knowledge about construction of base course with stone dust (water bound macadam)-10cm thick, supplying and applying of prime coat over base course all complete, construction of 5cm thick semi grouting with watering and compaction all complete, supplying and applying of 20 mm thick premix carpet all complete, supplying and applying of tack coat all complete and sand seal coat over premix carpet all complete Site Supervision for Land Development Project for making different number of plots in various individual areas as per Housing rules from existing topographic Sloppy Land

Layout for the proposed RCC Slab Bridge of Span 4m located in existing stream lies in between two land development plots of the colony which include detail supervision on earthwork in excavation, stone soling work, RCC foundation slab, stone masonary work and RCC slab as span of Road.

Certification
I, the understand; certify that to the best of my knowledge and belief, this bio data correctly describes my qualification, my experience and myself. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Signature

Date of signing

Refrences

Er Shiva Pd Koirala Principal Kathmandu Engineering College 01-4276130

Mr.Raju Prasad Kadel Padma Merchant Company Pvt Ltd Sitapaila-6

Mr Purushottam Pd Adhikari Er Renu Biswas HOD Kathmandu Engineering College Contact No.01-4276130 Padma Merchant Company Pvt Ltd Sitapaila-6

Nabin Raj Singh Er Arun Pd Parajuli Civil 4th Year Coordinator Kathmandu Engineering College Contact No-01-4276130 On and behalf of IDC Pvt Ltd Gaurighat, Kathmandu

Mr Aananta B Gurung East Consult Pvt Ltd Lazimpat, Kathmandu Ph: 4413267,4412062

Mr Suresh Pd Shrestha CEAD Consultant Pvt Ltd Mahendrapool; Pokhara