Professional Documents
Culture Documents
Volume II
Final Report
Appendices
May 2012
Appendix A
Field Inspection Memoranda and Photographs
Memorandum
To:
File
From:
Mike Nelson
Date:
12/2/10
Subject:
On Tuesday November 30th 2010, CDM conducted a field survey of the Williams Street Brook
drainage system in Northampton, MA. The purpose of the visit was to inspect the system,
identify design points for modeling, verify connectivity at specific locations, inspect the outfall,
and add any missing data found during the visit to the GIS maps. The weather was dry and cold
but the ground was not frozen at the time of inspection. The following is a summary of the
findings. Pictures of the system (referred to in the text) are provided.
The systems outfall was located on the bank of the Mill River near the WWTP
entrance. The 24-in concrete pipe was about 30 percent filled with silt and sediment.
It was also observed that the Mill River was highly silted in, as evidenced by the large
culvert under the WWTP entrance driveway. This culvert was almost 50percent full
of sediment with a berm of sediment off to one side, possibly spoils from previous
dredging. The outfall pipe was structurally intact, but had no headwall or erosion
control.
A wetland/brush area was located behind Montview Avenue, where the drain travels
cross-country. The drain in this area was TV-inspected by the City. These tapes
should be reviewed to assess the condition of the pipe below the levee.
Above the levee a valve enclosure was found about 30 ft past the toe of the levee. It is
used during flood events to close the pipe. Several inlets were also located along with
a network of drainage ditches in this wooded area. The ditches appear to convey
stormwater from upstream field areas during high flow events. Two of these ditches
end at 8-in VC pipe inlets connected to the 24-in drain. These inlets may act as relief
for the drain during peak flows and also allow flooded areas to drain after peak flows.
A small detention basin was located adjacent to the church parking lot off Pomeroy
Terrace. The basin seems to be inadequately sized and has irregular grading. Also
located in this area was a second, parallel drain (15-in) which has not been
Document code
abandoned, but may be collapsed in some sections. It is believed this drain connects
to the main line in the same area as the drainage ditches.
Some missing information was identified around Hawley Street, including a 15-in
drain on Hawley Street from the intersection of Hancock Street, a 12-in HDPE drain
on Bixby Court (to unknown location), and a 12-in RC drain from Butler Place to
Hawley Street. The GIS infomation in this area was also confirmed to be correct at the
intersection of Pomeroy Terrace and Phillips Street.
It was confirmed that there is no pipe on Bridge Street between Grant Avenue and
Elizabeth Street.
The 42-in outfall near the rail-trail bridge over the Connecticut River (Damon Road)
was inspected. The outfall area is highly deteriorated. Upstream of this system, a
MassDOT manhole was inspected and found to be in excellent condition (bike path
and Damon Road area).
The area around the Three County Fairgrounds was inspected, including Fair Street,
Old Ferry Road, and Cross Path Road. Several parcels possibly suitable for
stormwater detention were identified behind the Fairground stables and adjacent to
the park on Old Ferry Road. The owners of these parcels should be identified.
A drainage ditch in poor condition was inspected along Cross Path Road. The ditch
would be more effective if extended to Fair Street and cleared of trees and brush, and
possibly dredged. This ditch would convey stormwater downstream to the wooded
area where the network of drainage ditches was located.
Finally, several documents were obtained from the DPW, including TV inspection
videos and logs of the 24-in trunk drain. In addition, the final Weston & Sampson
report for this area was obtained for review. Still to be obtained is the Fairgrounds
Report from Berkshire Engineering.
Document code
Memorandum
To:
File
From:
Mike Nelson
Date:
12/16/10
Subject:
On Tuesday December 7th, 2010, CDM conducted a field survey of the King Street/Market
Street/Downtown drainage system in Northampton, MA. The purpose of the visit was to inspect
the system, identify design points for modeling, verify connectivity at specific locations, inspect
outfalls, and add any missing data found during the visit to the GIS maps. The weather was dry
and cold, but the ground was not frozen at the time of inspection. The following is a summary of
the findings. Pictures of the system (referred to in the text) are provided.
This system has two outfalls, a 60-in circular concrete pipe located under the railroad bridge
off Hockanum Road, and a 66-in circular concrete pipe located behind the apartments on
Randolph Place near the bikeway. Both outfalls discharge to the Historic Mill River. While the
river bed has significant sedimentation, the outfalls had less than 20 percent sediment at the
ends of the pipes.
The Historic Mill River bed was inspected between the two outfalls in the area of Pleasant
Street, Service Centre Road, and behind Maple/Wilson Ave. A 60-in circular culvert connects
the two sections of river bed on each side of Pleasant Street. The inlet of this culvert was
clogged with debris (e.g., branches). It was observed that boards had been placed in the pipe
inlet to act as a bar rack or screen. It appears to be preventing debris from migrating into the
pipe, but it also appears to have created an obstruction just outside the pipe.
The Historic Mill River bed from Maple Avenue to the WWTP provides a significant amount of
storage. Eight- to twelve-foot deep banks line each side of the stream with a varying
floodplain between the banks, with widths ranging from 20 to 80 ft.
The field crew met with DPW staff to discuss some specific areas where localized flooding had
occurred in a recent storm. These areas were: the North Street underpass between Market and
King Street; condominiums on Gothic Street (flows from State Street migrating through
property), and State Street at Stoddard Street.
Document code
On North Street, it appears that two catch basins at the low point of the underpass connect
directly to the old Market Street culvert and flooding may be due to catch basin maintenance
issues. Also a 24-in concrete drain running down North Street to the Market Street culvert was
discovered. The origin of this pipe is unknown. A manhole in King Street was opened to
determine if the 24-in drain was connected to the King Street culvert, but no connection could
be seen in the manhole.
Stoddard Street is experiencing flooding from backwater coming from the swamp behind Stop
& Shop. Heavy beaver activity has caused water to pool upstream of the wetlands sediment
trap and migrate through homeowners yards into the street along the side of the bikeway. The
crew also inspected the outlet of the swamp/wetland on Barrett Street where a large beaver
dam has impeded water from exiting the wetland into the outlet stream and raised the water
level of the wetland significantly (see pictures).
State Street is experiencing localized
flooding near Trumbull Road. Stormwater is
rising above the curb and running down the
driveway of a large residential property on
State Street through to the condominiums on
Gothic Street. The stormwater is flowing
down the handicap ramp on the north side of
the condominium building and accumulating
in the depressed entrance area in the front of
the building. The City believes the drain on
State Street is undersized, allowing water to
surcharge above the curb. Catch basin
cleaning is needed on State Street.
In this area it was noted that the RC drain from Gothic Street to King Street no longer exists and
now runs down Allen Place.
The two trunk drain lines in the King Street system have an interconnection at Main Street
(Rte. 9) underneath the railroad bridge. This interconnection was inspected by CDM and DPW
staff. It was confirmed that the old culvert (carrying sanitary and storm flows) located in the
Fitzwillys parking lot was abandoned. The new interconnection is located in the shoulder of
Main Street near the entrance to Fitzwillys parking lot. The King Street culvert enters the
structure as a 66-in pipe and exits as a 60-in pipe. A 36-in relief pipe is set at a higher elevation
(invert elevation is on record drawings) and connects to the Market Street culvert. The 36-in
pipe enters the Market Street culvert at a catch basin under the railroad bridge. It is unclear if
stormwater ever flows from the Market Street culvert back to the King Street line, or if it only
functions as an overflow relief pipe during surcharge of the King Street system. In addition,
Document code
record drawings indicate that the Market Street culvert changes size and shape numerous
times in this area as it flows south across Main Street.
The Marshall Street neighborhood was inspected last. The DPW informed CDM that the RC
drain between Hubbard and Marshall Streets was replaced by a new 24-in drain running down
Swan Street. The potential for using the drainage ditches along the bike path (under I-91) was
explored and may not be a feasible option. Heavy clearing would be needed along with
drainage infrastructure upgrades directly beneath I-91. There may be potential for storage
between the bike path and the intersection of Crosby and Marshall Streets. There is a clear
open corridor between Bates Street and the dead end of Crosby Street. There is potential for a
drain line to run through here, minimizing impacts to Rte. 9.
Document code
Stormwater Channel
Memorandum
To:
File
From:
Date:
12/30/2010
Subject: Elm Street Brook and Ryan Road/Austin Circle Areas Field Visit,
Wednesday 12/22/2010
On Wednesday, December 22, 2010, CDM conducted a field survey of the Broughtons
Brook/Elm Street Brook drainage system and a problem area in the Ryan Road/Austin Circle
area in Northampton, Massachusetts. The purpose of the visit was to verify GIS connectivity,
confirm pipe and culvert sizes, survey system conditions, identify design points for system
modeling, as well as system low points / areas prone to flooding.
Antecedent weather was dry, with sunny conditions and temperatures around 35 degrees (F)
at the time of inspection. The ground had started to freeze at the time of inspection, with
several wetland areas already iced over.
The following is a summary of the findings. Pictures referred to in the text are provided at
the end of this memorandum.
Elm Street Brook Area
The stormwater retention pond located adjacent to Federal Street, south of the
Northampton High School athletic fields is fed by a 36-in HDPE drain originating on
Elm Street. At the time of the inspection there was no base flow entering the pond.
The pond is an elongated kidney shape, allowing better treatment with its length. A
riprap emergency spillway is located on the east side, discharging to Broughtons
Brook. The wetland filter plants have been replaced by small trees and brush, and the
pond needs maintenance.
There is natural floodplain (low wooded areas) along the north and east sides of the
retention basin, which allows additional water storage before flooding the athletic
fields or Federal Street.
Elm Street Brook crosses underneath Federal Street and empties into the Mill River.
The box culvert under Federal Street is in poor condition. Headwalls on both sides
Document code
Elm Street Brook and Ryan Road/Austin Circle Areas Field Investigation
12-16-10
Page 2
If flooding were to occur at this location, 60 Federal Street would be affected before
any other structure, or before the road is flooded. The house abuts the brook at a 90
degree bend in the channel that runs from the Federal Street culvert to the Mill River.
The channel is about 10 feet wide, and 4 to 5 feet deep.
There are two outfalls directly downstream of the Federal Street culvert. One 36-in
flared end outfall from the retention pond; and a 15-in outfall from northwest on
Federal Street. This outfall was steadily flowing at the time of inspection and some
riprap from the mouth of the outfall had been pushed into the channel.
The crew inspected Broughtons Brook between the retention pond and the high
school. The stream has sediment accumulation, with sand bars occurring in
numerous spots causing braided flow in the channel. The stream channel originates
at a 12-ft by 8-in deep pool at an outfall on the southeast edge of the high school track.
Two sections of Milton Street were inspected. At the intersection with Ormond Drive,
in-line catch basins were inspected. Drainage on this road consists of 10-in clay pipes,
in fair condition. No clogging was observed.
There is a low-lying wooded area to the southwest of the intersection of Milton Street
and Ormond Drive, behind the houses. The map identified this area as a stream,
which outlets to manholes at the Ormond Drive intersection. However, the area is a
wooded area mostly filled with yard waste. No pipe outlet was observed in this area,
although there was base flow entering the Milton Street system from this direction.
At the intersection of Elm and Milton Street, Broughtons Brook is piped under Elm
Street /the high school grounds, reemerging south of the track. The base flow of the
brook is taken by a 48-in concrete flared end inlet (later transitions to HDPE and back
to concrete). No blockages were present during the time of inspection; however,
some large branches were found in the downstream manhole near the high school
parking lot. A relief 36-in concrete flared end inlet is set at a higher invert elevation
than the 48-in pipe.
On Riverside Drive, two catch basins were inspected just east of the intersection with
Milton Street and Elm Street. Both were in good condition, but drains were old 10-in
Document code
Elm Street Brook and Ryan Road/Austin Circle Areas Field Investigation
12-16-10
Page 3
clay pipes. The inlet to an 8-in cross country drain coming from behind houses along
Elm Street was blocked with yard waste and filled with sediment. The ditch that
conveys stormwater to this inlet has completely filled in with thorny vegetation and
small trees, losing all of its depth, and is merely a slight depression filled in with
leaves and other yard waste.
Nutting Avenue was identified as being a flood-prone area. The drainage system on
Nutting Avenue seems to be new and well done. Drainage from a field (and wetland
area) to the west of Nutting Avenue enters the system at the northern end of Nutting
Avenue. This connection is fed by a shallow grassed swale running parallel to Nutting
behind the homes bordering the field. The swale is about 6- to 8-foot wide and about
4-in deep at its deepest point. This swale most likely overtops, even in small rain
events, and floods these yards. Access to the swale (for improvements) is easily
obtained through the field.
The connection from the swale to the municipal system on Nutting is not typical. A
catch basin in a residence lawn is located approximately 4 feet below the road surface,
An opening in the curbing causes runoff from the road to be directed into that catch
basin. This most likely causes flooding in this homeowners yard. A solution would be
to replace the catch basin with a manhole and install curbing along the road. A catch
basin could be installed in the road and easily directed into the drain.
At Hospital Road, Broughtons Brook passes through a culvert with an upstream wing
wall. Along the upstream side, the box culvert is 4-ft by 8-ft; from stream invert to the
ground surface is a distance of 6 ft.
Hospital Road has a steep incline with a small stream originating from an elevated
retention pond (up on the hill) and marsh area at the base. At the top of the hill, the
eastern parking area contains a number of unmapped drains and catch basins which
drain to the large retention pond.
Broughtons Brook flows in an open channel along the northern side of Elm Street.
The stream is well established with vertical banks about 3-ft deep. The stream is very
close to the shoulder of Elm Street. In some locations, a guard rail has been installed
as a barrier between the travel lanes and the brook. Bank stabilization may be
needed here in the near future. There is very little grade change between the top of
the stream channel, Elm Street, the bottom of Hospital Road, and the houses on the
south side of Elm Street. Once the brook overtops, there is no barrier for flood
protection.
Upstream of this section, Broughtons Brook veers off away from Elm Street towards
the Vocational Schools land. Downstream of the Vocational School dirt road, which
Document code
Elm Street Brook and Ryan Road/Austin Circle Areas Field Investigation
12-16-10
Page 4
has a corrugated metal culvert, is a low-lying, sunken forest-type floodplain. This area
offers several flood control options that should be explored for the following reasons.
This area has virtually no potential for property loss due to flooding. There is
one structure on Elm Street well above the floodplain area.
There is a natural bowl area that could be flooded with a natural bottleneck on
the downstream side. This would provide opportunity for minimal earthwork
when creating retention.
North of Rte. 9 is a state-owned lot, once used as a yard for transportation equipment
and materials. This lot is mostly wetlands. The stream was located; however, only
one inlet was located: a 36-in circular culvert carrying the base flow of the stream.
Document code
Elm Street Brook and Ryan Road/Austin Circle Areas Field Investigation
12-16-10
Page 5
Further upstream the brook is conveyed under the elevated bike trail through a small
stone culvert. On the other side of the bike trail, the brook winds through a heavily
wooded and wetland area adjacent to the Meadow Brook Apartments. At this point,
the brook is quite small and fed by several detention ponds within the apartment
complex. The final inspection for this system was a 24-in concrete (circular) culvert
underneath Bridge Street carrying a small amount of base flow from a heavily
wooded, undeveloped area north of Bridge Street
There is a drainage ditch between Austin Circle and the elementary school on Ryan
Road that is prone to flooding. This ditch receives storm flows from the Matthew
Drive area, and is very flat. The natural water course before development appears to
have been in the opposite direction. The channel is very shallow but expanding into
residents yards.
While inspecting the area, the field crew was approached by several residents who
were concerned about the drainage problems in this area. Some residents have
successfully stopped erosion and channel expansion by laying down decorative
crushed stone in the channel. Yard waste is being used as a barrier between yards
and the channel. There was also a large frozen puddle near the back path to the
school. Long-time residents claimed the amount of water seen in the area now is
unprecedented.
Further downstream in the channel there are siltation issues at culvert crossings at
Brierwood Drive and Acrebrook Drive. These sections of channel are in need of
sediment removal.
Document code
Downstream Wingwall
Downstream Wingwall
Upstream Wingwall
Sandbars in Brook
Asphalt Sluiceway
Swale at Inlet
Memorandum
To:
Virginia Roach
From:
Tyler C. Dunn
Michael P. Smith
Subject:
City of Northampton
Stormwater and Flood Control System Assessment and Utility
Planning
Levee Assessment
Introduction
CDM was retained by the City of Northampton, Massachusetts to develop an inventory and
condition assessment of the Citys existing stormwater and flood control system. The purpose
of the project is to meet specific goals of the Sustainable Northampton Comprehensive Plan,
as well as to implement a new Sustainable Water Management Utility to fund capital projects
and maintenance of the citys stormwater and flood control facilities.
The purpose of this memorandum is to summarize the condition of the key elements of the
flood control facilities based on a general walk-through inspection, and to evaluate the
present condition of the levee and appurtenant structures to provide information that will
assist in both prioritizing levee repair needs and planning/conducting operation and
maintenance.
The condition assessment of the levee flood control system included the following scope:
Collect and review available reports, including U. S. Army Corps of Engineers (USACE)
design drawings and reports, inspection reports, operation and maintenance documents,
and other available plans and design information for the flood control structures pertaining
to the levee and appurtenant structures;
Perform a visual inspection of the levee system;
Prepare a memorandum summarizing the assessment of the levee system, including
recommendations.
Virginia Roach
May 25, 2011
Page 2
Background Information
General
The flood protection levee system consists of two main parts on each side of the city. The
eastern part of the system includes an earth embankment about one mile long that provides
flood protection against rising waters of the Connecticut River. The western part of the
system includes earth embankment segments and a concrete flood wall designed to protect
against rising waters and flash floods from the Mill River and backwater from a diversion
canal linked to the Connecticut River originating at the Ox Bow Lake. Construction of the
flood protection system was started in December 1938 and was completed in June 1941. The
following paragraphs describe the systems based on a review of the record drawings, the
operations and maintenance manual, and other references. Elevations that are presented were
taken from the documents referenced to Mean Sea Level Datum and converted to NAVD 88
datum. To convert from MSLD to NAVD 88, subtract 0.67 ft.
Crest
Based on the record drawings, the crest of the levee was shown to be generally 10 feet wide
with an 8-foot-wide gravel surface and grass-covered edges. The crest of the levee generally
was constructed at an elevation of about El. 131.6 to El. 131.3.
Virginia Roach
May 25, 2011
Page 3
River-side Slope
Based on the record plans, most of the river-side slope of the levee was presented as a 2.5
horizontal : 1 vertical (2.5H:1V) slope, and a 3H:1V slope at the segment between Ventures
Field Road and Hockanum Road. The slope surface has 6 inches of topsoil and is grass
covered except in some limited areas. The slope is protected with a one-foot layer of riprap for
about 1,000 feet on the embankment curve beyond the Ventures Field Road crossing, and on
the embankment between the pump station and the B&M railroad crossing. The upper limit
of the riprap is shown to reach El. 129.6, or about 1.8 feet below the crest surface.
Land-side Slope
Most of the land-side slope of the levee was shown to be a 2H:1V slope, and a 3H:1V slope at
the segment between Ventures Field Road and Hockanum Road. At the ground surface, a 12inch-thick layer of topsoil and grass covers the embankment pervious fill. A toe drain system
consisting of 8-inch to 15-inch porous concrete pipe in gravel bedding filtered trenches exists
below grade along most of the embankment toe of slope. Intermittent manholes are installed
to service the toe drain system. The toe drain system collects the seepage water through the
levee fill and discharges to the storm sewer system.
Pump Station
The Northampton Pump Station was built across the old Mill River to remove stormwater
and treated effluent from the land-side portion of the East Levee when the water in the river
rises. The pumping station is a brick building that was constructed between two earth
embankments with interconnecting concrete counterfort flood walls. Stormwater runoff
discharges into the old river bed at several locations upstream of the pump station. As the
flow in the old river reaches the pump station, stormwater is normally discharged by gravity
through an open 6-foot X 8-foot conduit at the base of the pump house building. Pumping
operations from inside the building are performed with four separate pumps, which include
three 48-inch propeller pumps (two gas-powered, one diesel-powered) and a 16-inch electric
Virginia Roach
May 25, 2011
Page 4
pump. The pump station building also includes engine batteries, an emergency generator,
electrical and manual gate controls, and other appurtenances. The pump station is operated
when the Connecticut River rises to a flood stage when open channel flow through the
rectangular conduit cannot occur. A sluice gate is closed in the conduit and the pumping
system is activated. The pumps discharge the water through the flap valve closures on the
discharge pipe outlets to the Mill River which flows southerly to the Connecticut River.
Bar/trash racks protect the pump inlet chambers from large debris at the river side of the
building.
Virginia Roach
May 25, 2011
Page 5
Crest
Based on the record plans, the crest of the levee segments was shown to be generally 10 feet
wide and grass-covered. The crest of the levee segment north of West Street generally was
constructed at elevations ranging from El. 145.5 to El. 144.8. The crest of the levee segment
south of the bridge of the former RR crossing was constructed at an elevation of about El.
139.1.
River-side Slope
Based on the record drawings, the river-side slope of the northerly levee segment was
presented as a 2.5H:1V slope. The levee segment south of the flood wall was built with a
3H:1V slope to the end at Hebert Avenue. The slope surface is protected with a one-foot layer
of hand-placed riprap. The upper limit of the riprap on the slope of the northerly levee
segment is shown to be about one foot below the level of the crest. The upper limit of the
riprap of the levee segment south of the floodwall is shown to be El. 137.1, or about 2 feet
below the crest surface.
Land-side Slope
Most of the land-side slope of the levee was shown to be a 2H:1V slope. At the ground
surface, a 12-inch-thick layer of topsoil and grass covers the embankment fill. A toe drain
system consisting of 8-inch to 10-inch porous concrete pipe in filtered trenches exists below
grade along most of the embankment toe of slope. Intermittent manholes are installed to
service the toe drain system.
Virginia Roach
May 25, 2011
Page 6
record drawings also indicate a 1-foot-square opening labeled as the Propper-McCallum
outlet exiting the retaining wall further to the south. This opening served as a drain operated
with a gate valve for the basement of the former Propper McCallum Silk Hosiery Co. which is
currently the Smith College Physical Plant. A March 2006 revision update to the Local
Emergency Flood Plan by the Northampton Emergency Management Department indicated
that the piping is not connected inside the building and that two high-water events in 2005
did not show an effect in the building.
Virginia Roach
May 25, 2011
Page 7
Diversion Channel
The diversion channel begins at the southern portion of the West Levee. The channel extends
downstream about 2,900 feet to the weir of the drop structure beneath the South Street Bridge.
In this portion, the channel bottom is about 35 feet wide, with channel side-slopes constructed
as 3H: 1V slopes. The bottom and side-slopes are lined with stone riprap. Downstream of the
drop structure, the channel grade is relatively flat with some definition of side slopes. The
channel extends about an additional 8,000 feet beyond the end of the drop structure to the
discharge point at Ox Bow Lake. Hulberts Pond forms the basin area prior to discharging to
the Ox Bow.
Field Inspection
General
CDM representative Tyler C. Dunn made a site visit on December 22, 2010 to perform a
general visual inspection of the levee system. A more-detailed inspection and evaluation of
the levee system was performed for the USACE in December 2010. Mr. Dunn was
accompanied by Mr. Felix Harvey, Assistant Civil Engineer with the City of Northampton. At
the time of the inspection, the weather was partly cloudy to overcast with the temperature
about 32F. There was no snow cover on the ground. Photographs to document the current
condition of the East Levee were taken during the inspection and are included in Appendix
A, and the photograph locations are shown on Figures A-1 and A-2. Photographs to
document the current condition of the West Levee were taken during the inspection and are
included in Appendix B, and the photograph locations are shown on Figures B-1 through B5. For convention, reported observations, photographs, data, and documented features on the
figures in this memorandum are referenced to stationing along the crest centerline based on
the 1951 Flood Emergency Mobilization Plans and the record drawings (design drawings
1939) dated 1949.
In general, the levee systems were found to be in very good condition. Only isolated areas
were noted to have deficiencies that would usually be corrected with normal maintenance
practices. In general, the deficiencies included:
Few trees and thick brush are growing near the toe of the river-side slopes of the levee
and at the river-side face of the concrete flood wall at isolated areas.
Ruts, small depressions were observed on the crest of the earth embankments.
The grass on the crest of the earth embankments was worn by foot traffic exposing bare
soil to potential erosion.
Isolated area of missing riprap on the slope of the diversion canal near the end of the West
Levee.
Potential clogging of the toe drain system as reported by recent USACE inspection.
Virginia Roach
May 25, 2011
Page 8
The specific observations are identified in the sections below. However, it should be noted
that a detailed inspection of all elements of each of the two levee systems was not performed.
General observations were made and the documentation of the existing condition of elements
and features are recorded in the photographs. Other potential deficiencies may not have been
observed during the general inspection.
Crest
The crest of the levee generally appears flat and level. One small area of the crest surface
appeared uneven and slightly lower at the location of the farm vehicle path near the natural
abutment near Eastern Avenue (Photo Nos. 8, 9, 10). Some small woody vegetation was
observed growing at the path location on the crest and the river-side slope. This should be
removed. The edges of the crest surface were grass-covered and the centerline portion of most
of the crest was generally bare exposing the granular fill surface (see many of the East Levee
photos). The lack of grass cover is attributed to pedestrian traffic. No significant erosion of
the bare areas was evident, but the grass cover should be restored and maintained.
River-side Slope
The river-side slope of the levee generally was in good condition. The slope appeared to be
even and consistent in plane with no obvious signs of erosion or sloughing. Most of the riverside slope is grass covered and recently mowed. Some segments of the slope are protected
with riprap. Minor amounts of brush were seen growing from the riprap edges or between
stones (Photo Nos. 15, 32, 35). This brush should be cut on a regular basis. Some areas along
the toe of the slope have woody vegetation and brush (Photo Nos. 9, 12, 14, 15, 17, 19, 20, 45),
which should be cut back to 15 feet from the toe of slope.
Land-side Slope
The land-side slope of the levee generally was in good condition and covered with a healthy
growth of grass. The slope appeared to be even and consistent in plane with no obvious signs
of erosion or sloughing. Some brush or woody vegetation was encountered in only a few
areas at or near the toe of the slope (Photo No. 22, 26, 33, 34). The brush and trees should be
Virginia Roach
May 25, 2011
Page 9
cut back to a distance of 15 feet from the toe. Brush was seen growing around some of the toe
drain manholes (Photo Nos. 22, 26), and should be cut to maintain manholes for access. The
toe drain system should be inspected to identify any areas where sediment could be collected
within the porous pipes. It is suggested that an internal video investigation be performed and
that the sediment encountered be removed to maintain the function of the toe drain. Some
rutting of the slope surface was seen on the earth embankment segment between B&M RR
crossing and the Route 5 crossing (Photo No. 39). This rutting should be filled with proper fill
and covered with loam and seeded to restore the slope plane and the grass cover.
Pump Station
The exterior of the pump station appeared to be in good condition (Photo Nos. 27, 28, 29, 30,
31) with no signs of structural distress. The interior was not observed during this abbreviated
inspection.
Virginia Roach
May 25, 2011
Page 10
Crest
The crest of the levee generally appears flat and level. The crest surface is grass-covered with
some flattened grass slightly bare ground due to foot traffic. No erosion of the bare areas was
evident, but the grass cover should be restored and maintained (Photo Nos. 1, 7, 9, 10, 33,
34, 35).
River-side Slope
The river-side slope of the levee generally was in good condition. The slope appeared to be
even and consistent in plane with no obvious signs of erosion or sloughing. Practically the
entire river-side slope is protected with riprap (Photo Nos. 4, 6, 8, 12, 31, 32, 35). A small area
along the toe of the slope has some woody vegetation and trees (Photo No. 4) which should
be cut back to about 15 feet from the toe of slope. Some small area of trees and woody growth
was observed near the toe of the slope at the south end of the embankment near the transition
to the diversion channel (Photo No. 32). This growth should be cut back to a distance of 15
feet from the toe.
Land-side Slope
The land-side slope of the levee was in good condition and covered with a healthy growth of
grass. The slope appeared to be even and consistent in plane with no obvious signs of erosion
or sloughing. Some trees and woody vegetation were observed behind the flood wall near the
toe of the slope (Photo No. 30). Any brush or trees should be cut back to a distance of 15 feet
from the toe. The toe drain system should be inspected to identify any areas where sediment
could be collected within the porous pipes. It is suggested that an internal video investigation
be performed and that the sediment encountered be removed to maintain the function of the
toe drain.
Virginia Roach
May 25, 2011
Page 11
Woody vegetation was observed behind and on the river-side face of the concrete retaining
wall along the east bank of the river in front of the flood wall (Photo Nos. 14, 15, 16, 20). This
vegetation was growing close to the two cast iron flap valves observed on the north end of the
retaining wall face (Photo No. 49) near the east abutment of the West Street bridge. The lower
flap valve was not sealed properly and should be repaired or replaced. Some spalling and
deterioration of the concrete was observed in the limited area. The remaining retaining wall
should be inspected to note areas of deterioration, and proper repairs should be performed.
Additionally, any perforations or pipe conduits through the wall should checked for potential
transmission of flood water flow. If the conduits are not needed for drainage, then the
conduits should be sealed or plugged.
Pump Station
The West Street pumping station is located adjacent to the West Street crossing on the landside of the concrete flood wall. This pump station was installed several years after the
completion of the West Levee System. The exterior of the building and the piping for the
pump operation appeared to be in good condition. The pump station is a small 12-foot X 9foot concrete block structure with a wood-framed roof. The pump station draws water from
the stormwater collection system through a 6-inch steel suction pipe that extends vertically
above the ground surface and horizontally into the building. Pumped water is discharged
through a galvanized steel 6-inch pipe. The discharge pipe rises to the top of the flood wall
and down the river-side face of the flood wall where it discharges onto a bituminous
pavement pad that permits flow towards the river. The pump is powered by propane fuel.
Interior inspection of the building was not performed.
Virginia Roach
May 25, 2011
Page 12
vegetation is shown along the edges of Hulberts Pond (Photo No. 45). The discharge point
into Ox Bow Lake includes a temporary bridge crossing that is currently closed (Photo Nos.
46, 47) and an existing concrete box culvert (Photo No. 48).
Accreditation
For flood control projects to be recognized by FEMA on the NFIP maps, adequate evidence
must be provided showing the flood control system provides reasonable assurance that
protection from the base flood exists in accordance with CFR 65.10. The accreditation process
with respect to the stability of the earthen embankment levees and flood walls includes:
A topographic survey of the system to confirm system geometry and the 3-foot freeboard
requirement;
A subsurface exploration program to evaluate the composition and in-situ strength of
embankment and foundation materials;
Evaluating erosion protection from currents and/or wave action;
Embankment and foundation stability and seepage analyses of the earthen embankments
in accordance with USACE EM-1110-2-1913, Design and Construction of Levees;
Stability and seepage analyses of the flood walls in accordance with the USACE Phase II
Interim Guidance for Evaluating Existing I-Walls, dated October 25, 2006;
Settlement evaluations to assess the potential and magnitude of loss of freeboard.
Below is a brief summary of the current status or information regarding the above studies.
Topographic Survey
The as-built records from the 1940s appear to be the most recent survey of the levee system.
Freeboard Evaluation
As part of this assessment a preliminary comparison of the flood control system crest
elevations and the 100-year flood elevations was performed. Based on the record drawings
and the FEMA FIRM for Northampton, the flood control systems have sufficient freeboard
above the 100-year base flood elevation as shown in Table 1. It should be noted that for a 500year storm event, freeboard is reduced to 1.5 feet at some locations.
Virginia Roach
May 25, 2011
Page 13
Erosion Protection
The river-side slope of the east levee system is primarily grass covered and the river-side
slope of the west levee system is protected with a one foot layer of hand-placed riprap. No
evaluations are available for the embankment erosion protection.
Settlement
The record drawings indicate the crest grades shown were built up to account for up to 0.75
feet of settlement. No other settlement calculations are available for the levee system and the
effect of potential pipe collapses have not been evaluated.
Additional studies in accordance with CFR 65.10 also include, but are not limited to, a specific
O&M plan, interior drainage study, documentation of flood warning system, and
maintenance plans and criteria.
Recommendations
Based on the visual inspection, the following recommendations are discussed below.
Additional Studies
This section identifies studies that should be completed to evaluate concerns.
Update the Operation and Maintenance Manual. This manual should include inspection
schedules, operational and maintenance procedures required to ensure satisfactory
operation of the levee system to reduce the potential for deterioration to the facility.
If accreditation of the flood control levee system is pursued, follow the general guidelines
outlined above in accordance with CFR 65.10.
Virginia Roach
May 25, 2011
Page 14
Cut and clear trees and thick brush on the levee and at least 15 feet beyond the abutments
and at the toe of the levee. Removal of the trees greater than 4 inches in diameter and any
planned excavation of roots should be designed by a qualified levee/dam engineer. Holes
should be filled with low-permeability fill on the river-side slope and compacted fill on the
land-side slope.
Remove burrowing animals and backfill holes with compacted fill.
Repair areas of sparse vegetation on the crest and land-side slope. Establish a healthy stand
of grass to prevent future erosion.
Closing
The findings and recommendations have been prepared for the levee system assessment in
the City of Northampton, Massachusetts as understood at this time and described in this
memorandum. The recommendations are based on information provided to CDM and the
limited observations made at the time of the inspection. The recommendations have been
prepared in accordance with generally accepted engineering practices. No other warranty,
express or implied, is made. A more-detailed inspection and evaluation of the levee system
was performed for the USACE in December 2010. The results of that inspection may provide
additional recommendations and details for maintenance, repairs, and certification
requirements for the levee systems.
Virginia Roach
May 25, 2011
Page 15
Attachments:
Table 1 Summary of Levee Crest and Base Flood Elevations
Figure 1 Site Location Aerial Map
Figure 2 Levee Assessment General Plan
Appendix A East Levee System Photographs and Photograph Location Plans
Appendix B West Levee System and Diversion Canal Photographs and Photograph
Location Plans
Appendix C FEMA FIRM Maps
City of Northampton, MA
Stormwater and Flood Control System Assessment and Utility Planning
Table 1
Summary of Levee Crest and Base Flood Elevations
Station
Freeboard (ft)
7.5
7.4
7.3
7.5
8.1
9.0
9.1
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
19.0
12.2
12.2
12.5
13.0
13.8
8.0
8.1
8.2
8.2
8.2
8.3
8.3
8.3
8.4
6.8
6.8
8.8
9.8
PROJECT LOCATION
N
WEST LEVEE SYSTEM
Appendix A
East Levee System Photographs and
Photograph Location Plans
Photo No. 1: Land-side East Levee contact at natural abutment at about Sta. 1+00, from
end of Eastern Ave.
Photo No. 2: Land-side East Levee looking up-station (SE) at about Sta. 2+50, from end of
Eastern Ave.
Photo No. 3: Crest of East Levee transition to natural abutment, near end of Eastern Ave.
Photo No. 4: Crest of East Levee looking up-station (SE) from about Sta. 2+50 near the
end of Eastern Ave.
Photo No. 5: Crest and land-side slope of East Levee from about Sta. 3+50.
Photo No. 6: East Levee land-side slope. Note manhole at toe of levee at about Sta. 4+75
that services a 24 in. storm sewer utility that crosses beneath levee.
Photo No. 7: East Levee land-side slope looking toward natural abutment near Eastern
Ave. Note manhole for 24 in. storm sewer.
Photo No. 8: Crest of East Levee looking toward natural abutment at Eastern Ave. from
about Sta. 6+50.
Photo No. 9: Crest and river-side slope of East Levee looking toward natural abutment at
Eastern Ave. from about Sta. 10+00.
Photo No. 10: Crest and land-side slope of East Levee looking toward natural abutment at
Eastern Ave. from about Sta. 10+00.
Photo No. 11: Crest and river-side slope of East Levee looking toward Ventures Field
Road crossing from about Sta. 10+00.
Photo No. 12: Crest and river-side slope of East Levee looking toward Ventures Field
Road crossing from about Sta. 13+00.
Photo No. 13: Crest and land-side slope of East Levee looking toward Ventures Field Road
crossing from about Sta. 12+50.
Photo No. 14: Crest of East Levee looking up-station (SE) from Ventures Field Road
crossing.
Photo No. 15: River-side slope of East Levee looking up-station (SE) from Ventures Field
Road crossing.
Photo No. 16: Land-side slope of East Levee looking up-station (SE) from Ventures Field
Road crossing.
Photo No. 17: Curved portion of river-side slope of East Levee looking up-station from
about Sta. 18+00.
Photo No. 18: Curved portion of land-side slope of East Levee looking up-station from
about Sta. 18+00.
Photo No. 19: Crest and river-side slope of East Levee looking up-station toward
Hockanum Road crossing from about Sta. 22+00.
Photo No. 20: Crest and river-side slope of East Levee looking down-station from about
Sta. 25+20). Note termination of riprap on the slope at about Sta. 24+90.
Photo No. 21: Crest and land-side slope of East Levee looking down-station from about
Sta. 26+00.
Photo No. 22: Crest and land-side slope of East Levee looking up-station toward
Hockanum Road crossing from about Sta. 22+00. Note two toe-drain manholes.
Photo No. 23: Crest and land-side slope of East Levee looking down-station toward
Hockanum Road crossing from about Sta. 34+00.
Photo No. 24: Crest and river-side slope of East Levee looking down-station toward
Hockanum Road crossing from about Sta. 34+00.
Photo No. 25: Crest and river-side slope of East Levee looking up-station toward pumping
station from about Sta. 32+00.
Photo No. 26: Crest and land-side slope of East Levee looking up-station toward pumping
station from about Sta. 32+00.
Photo No. 27: Crest and land-side slope of East Levee looking up-station at pump station
from about Sta. 36+50.
Photo No. 28: River-side slope of East Levee looking up-station at pump station and Mill
River discharge from about Sta. 36+50.
Photo No. 29: River-side face of pump station and concrete transition walls to levee,
looking up-station.
Photo No. 30: River-side face of pump station with three 48 in. discharge conduits, looking
up-station.
Photo No. 31: Pump station and river-side slope looking down-station.
Photo No. 32: Crest and river-side slope looking up-station toward B&M RR crossing
from about Sta. 40+50.
Photo No. 33: Crest and land-side slope looking up-station toward B&M RR crossing from
about Sta. 40+50.
Photo No. 34: Crest and land-side slope of East Levee looking down-station toward pump
station from about Sta. 41+50.
Photo No. 35: Crest and river-side slope of East Levee looking down-station toward pump
station and Mill River discharge from about Sta. 41+50.
Photo No. 36: Crest and land-side slope of East Levee looking up-station toward B&M RR
crossing from about Sta. 41+50.
Photo No. 37: East Levee concrete retaining wall/stop log structure at B&M RR crossing,
looking up-station, with river-side slope on left.
Photo No. 38: East Levee concrete retaining wall/stop log structure at B&M RR crossing,
looking down-station at crest and land-side slope toward pump station.
Photo No. 39: Land-side slope of East Levee looking down-station toward B&M RR
crossing from about Sta. 44+50.
Photo No. 40: Crest and river-side slope of East Levee looking down-station toward B&M
RR crossing from about Sta. 44+50.
Photo No. 41: East Levee and retaining wall/stop log structure at US Rte 5 crossing
looking down-station from about Sta. 45+00.
Photo No. 42: East Levee and retaining wall/stop log structure at US Rte 5 crossing
looking up-station from about Sta. 44+50.
Photo No. 43: East Levee and retaining wall/stop log structure at US Rte 5 crossing
looking up-station.
Photo No. 44: Crest and river-side slope of East Levee looking up-station toward natural
abutment from about Sta. 45+00.
Photo No. 45: Crest of East Levee looking down-station toward US Rte 5 crossing from
about Sta. 47+50, near natural abutment.
Photo No. 46: River-side slope of East Levee looking down-station toward US Rte 5
crossing from about Sta. 48+00, near natural abutment.
Photo No. 47: Land-side slope of East Levee looking down-station toward US Rte 5
crossing from about Sta. 48+00, near natural abutment.
Photo No. 48: East Levee looking down-station toward US Rte 5 crossing from about Sta.
49+50, at natural abutment contact.
Photo No. 49: East Levee looking up-station at natural abutment contact at about Sta.
49+50.
Appendix B
West Levee System and Diversion Canal
Photographs and Photograph Location
Plans
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-1
Photo No. 1: West Levee contact at natural abutment adjacent to College Lane, looking
up-station from about Sta. 0+50.
Photo No. 2: West Levee looking up-station from about Sta. 1+75, toward natural
abutment adjacent to College Lane.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-2
Photo No. 3: Crest and land-side slope of West Levee looking up-station from natural
abutment adjacent to College Lane.
Photo No. 4: Crest and river-side slope of West Levee looking up-station from natural
abutment adjacent to College Lane.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-3
Photo No. 5: Crest and land-side slope of West Levee looking up-station from about Sta.
5+00.
Photo No. 6: Crest and land-side slope of West Levee looking up-station from about Sta.
5+00.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-4
Photo No. 7: Crest and land-side slope of West Levee looking up-station toward West
Street crossing from about Sta. 6+00.
Photo No. 8: River-side slope of West Levee looking up-station from about Sta. 6+00.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-5
Photo No. 9: Crest and slopes of West Levee looking up-station toward West Street
crossing from about Sta. 9+50.
Photo No. 10: Crest and slopes of West Levee looking down-station from about Sta. 10+00.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-6
Photo No. 11: Retaining wall and stop-log structure of West Levee at about Sta. 11+50 at
north curb of West Street crossing, looking down-station. River-side slope at left.
Photo No. 12: Retaining wall, stop-log structure, and river-side slope of West Levee at
about Sta. 11+50 at north curb of West Street crossing, looking west from crest.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-7
Photo No. 13: Beginning of concrete flood wall and stop log wing wall structure at about
Sta. 12+00 at south curb of West Street crossing, looking up-station from West Levee crest
at about Sta. 11+50.
Photo No. 14: River-side face of concrete flood wall with stop log wing wall structure to the
left at about Sta. 12+00 at the south curb of West Street crossing.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-8
Photo No. 15: River-side face of concrete flood wall just south of West Street crossing.
Photo No. 16: Mill River parallel to and south of river-side flood wall (on left) between
West Street crossing and the railroad crossing, looking south from West Street.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-9
Photo No. 17: River-side face of concrete flood wall looking up-station from about Sta.
12+20 just south of West Street crossing.
Photo No. 18: Land-side face of concrete flood wall looking up-station from about Sta.
12+50 south of West Street crossing.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-10
Photo No. 19: Land-side face of concrete flood wall on left looking down-station from
about Sta. 12+70 toward West Street crossing.
Photo No. 20: River-side face of concrete flood wall looking down-station from about Sta.
13+00 toward West Street crossing.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-11
Photo No. 21: Land-side face of concrete flood wall looking down-station from about Sta.
13+00 toward West Street crossing.
Photo No. 22: River-side face of southern portion of concrete flood wall looking up-station
from about Sta. 14+00 toward former RR crossing.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-12
Photo No. 23: Land-side face of concrete flood wall looking up-station from about Sta.
13+80 toward former RR crossing.
Photo No. 24: River-side face of south end of concrete flood wall from about Sta. 14+80
looking up-station toward former RR crossing.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-13
Photo No. 25: Land-side face of south end of concrete flood wall from about Sta. 14+70
looking up-station toward former RR crossing. Note salt storage hut in contact with face of
wall.
Photo No. 26: Land-side face of concrete flood wall from about Sta. 14+70 looking downstation toward West Street crossing.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-14
Photo No. 27: South end of river-side concrete flood wall at about STA. 15+00 at contact
with stone abutment of bike-path (former RR crossing).
Photo No. 28: River-side face of stone abutment of former RR crossing. Flood wall contact
at Sta. 15+00 is shown beyond.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-15
Photo No. 29: River-side face of stone abutment, flood wall extension, and river-side slope
looking up-station from about Sta. 15+40.
Photo No. 30: Face of stone abutment and flood wall south extension transition to levee
looking down-station from levee crest at about Sta. 16+60.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-16
Photo No. 31: River-side face of flood wall south extension and slope looking up-station
from about Sta. 16+40.
Photo No. 32: River-side slope of West Levee looking up-station from about Sta. 16+40,
approximately at beginning of Mill River diversion canal.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-17
Photo No. 33: Crest and land-side slope of West Levee looking up-station from about Sta.
16+50.
Photo No. 34: Crest and land-side slope of West Levee looking up-station from about Sta.
20+50 toward natural abutment adjacent to Hebert Ave.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-18
Photo No. 35: Crest and river-side slope of West Levee looking down-station from about
Sta. 20+00 toward south end of flood wall and former RR crossing.
Photo No. 36: River-side slope of West Levee and Mill River diversion canal looking upstation from approx. levee Sta. 17+00 (approx. canal Sta. 0+75).
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-19
Photo No. 37: West slope of Mill River diversion canal from about canal Sta. 20+00
looking down-station toward direction of West Levee.
Photo No. 38: West slope of Mill River diversion canal from about canal Sta. 20+00
looking up-station toward direction of South Street Bridge drop structure.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-20
Photo No. 39: West slope of Mill River diversion canal from about canal Sta. 20+50
looking up-station toward direction of South Street Bridge drop structure.
Photo No. 40: West slope of Mill River diversion canal from about canal Sta. 25+00 looking
down-station toward general direction of West Levee.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-21
Photo No. 41: South Street bridge and canal drop structure looking up-station from
upstream canal Sta. 25+00.
Photo No. 42: South Street bridge and canal drop structure looking up-station from
upstream canal Sta. 26+75.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-22
Photo No. 43: South Street bridge and canal drop structure looking down-station from the
farm access road at about canal Sta. 30+90.
Photo No. 44: South Street bridge and canal drop structure looking down-station from the
farm access road at about canal Sta. 32+50.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-23
Photo No. 45: Lower end of Mill River diversion canal looking upstream toward Hulberts
Pond (down-station) from Old Springfield Road temporary bridge at about canal Sta.
107+85.
Photo No. 46: Discharge point of Mill River diversion canal flowing into Ox Bow Lake
beneath Old Springfield Road temporary bridge at about canal Sta. 107+85, looking north.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-24
Photo No. 47: Discharge area of Mill River diversion canal flowing into Ox Bow Lake
beneath Old Springfield Road temporary bridge at about canal Sta. 107+85, looking north.
Photo No. 48: Discharge area of Mill River diversion canal flowing into Ox Bow Lake
beneath Old Springfield Road temporary bridge at about canal Sta. 107+85, looking south.
Note 5 ft. x 7 ft. concrete culvert in foreground.
Northampton West Levee System Mill River and Mill River Diversion Channel
December 22, 2010
Page B-25
Photo No. 49: Flap valves at the retaining wall at the east bank of the Mill River near the
West Street bridge abutment.
Appendix C
FEMA FIRM Maps
8. There is concern about the main sluice gate operator located inside the station, that is used to cut off
the gravity flow draining into the River, whether it is reliable in electric mode. It works in manual mode,
but would be very time-consuming to operate manually.
9. Similarly, there is concern there may be electrical problems with the other main sluice gate operator,
located outside the station, that diverts from to the main pump wet well.
10. Heat for the building is now provided by gas unit heaters fueled with natural gas. The original boiler,
located in the basement is no longer used.
11. The major issue at the station is that everything is manually operated, and must be monitored
continuously when operating and/or when expecting that operation may need to commence.
Additionally, during times of high river elevation, even when there is no storm run-off, the station must
be manned around the clock to allow monitoring of the drainage inlet to the station, and occasional
operation of the electric motor driven pump to pump down the inlet bay. During daytime, the operator
may be dispatched from the WWTP, but at times the WWTP is not manned, an operator must be present
(paid on overtime) at the Main Station. At the time of my visit, the Connecticut River is running high,
because of winter run-off farther north, requiring occasional operation of the electric motor driven pump.
The dilema is that the cost to automate will be very high, because anything to be automated must be
replaced with new equipment. The trade-off is to choose the better option, whether to automate to
reduce required manpower, but spend money on new equipment, pay personnel to manually operate the
existing old equipment.
12. There do not appear to be issues regarding the capacity of the station, although John noted that he
has observed the station to be in operation with all pumps running.
13. The engines and the right angle drives appear to have some lubricating oil leaks, some of which are
controlled by absorbant sheets.
The West St. Pumping Station is located near the Mill River adjacent to the crossing of West St., on the
protected side of the flood wall. The pumping station draws from a storm water collection system, and
pumps over the flood wall to discharge into the Mill River. The storm water collection system appears to
serve a limited area inside the flood wall, that is a low point for collection of storm run-off.
The pumping station is an on-grade structure, of CMU construction with a wood framed, asphalt singled
roof. The exterior dimensions of the building are approximately 12 ft X 9 ft. A wooden double door on
one end provides access to the interior. The building houses one engine driven self-priming type pump.
The vintage of the equipment suggests the station was built in the 1960's or '70's.
The pump is connected to the storm collection system by a 6 inch steel suction pipe that rises just
outside the building from a manhole. The pipe turns horizontal through the building wall, and connects
through a gate valve to the pump suction. The gate valve seemed stuck in which ever position it is
currently set. Being a non-rising stem valve, it's position (open or closed) was not obvious.
The pump discharges through a light wall galvanized steel pipe that exits the back wall of the station,
rises up and over the top of the flood wall, drops down the opposite side of the flood wall, and bends
horizontal to an outlet onto a bituminous spill pad that flows to the river. This is a very light duty piping
system.
The pump is direct driven by a spark ignited engine power unit fueled by propane. The Power Unit is
assembled by Hanlon Waters. The engine is a Ford automotive type engine, straight 6, likely rated on
the order of 100 hp, radiator cooled. Engine serial number is 192432. The hour meter shows 36 hours
of run time. There is no muffler on the exhaust discharge outdoors, so the engine is likely rather noisy
during operation. The doors must be left open during operation for ventilation.
The propane fuel tank is a 300 lb propane bottle located outside the station. A prolonged operating time
during cold weather may cause problems with the ability of the propane in the tank to vaporize fast
enough to keep the engine fueled at full power operation.
The pump is a Rex Chainbelt, 6 inch, self-priming pump, Serial Number NJ0284. Being a 6 inch pump,
the capacity is likely to be on the order of 800 to 1000 gpm. No rating data plate could be identified.
The engine is started and operated on a regular basis as normal preventive maintenance. A trickle type
battery charger keeps the starting batteries charged. The building has a short strip of electric heater
baseboard to maintain warmth inside. There is one interior light.
The ability of the station to pump water is unknown. It has not been used for the purpose of pumping
water for a very long time, if at all. The only way for it to demonstrate an ability to pump water is if the
Mill River rises to the point the collection system floods, or if the outlet of the collection system into the
river is plugged.
There are two nearby outlets of piped collection systems into the river, one higher than the other, both
built into the retaining wall along the river bank. Both have a cast iron flap valve. Both flap valves
appear to open freely. The lower of the two flap valves appears to be rather new, and utilizes a resilient
seat. The seat appers to have swollen to the point that the flap cannot close onto its seat. The flap
cannot be forced manually to full closure. Thus, high river elevation will result in flooding of the
collection system tributary to this flap gate. If this flap valve serves the same collection system as the
pump, the leakage may fully negate the capacity of the pumping station.
As noted above, during exercising, the pump does not pump water. It is not known if the pump contains
priming water to initiate pumping, or if water would need to be poured into the pump to initiate the
priming action. The collection system may be rather deep, which requires greater priming effort by the
pump, and/or may require that the collection system must surcharged nearly to street level before the
pump will prime up. The condition of the seals on the pump is not known. The configuration of the
suction pipe inlet in the collection system is not known.
Similar to the Main Station, this pump is also completely manually operated. If the station must be
operated, an operator must be on site at all times. Note in one of the photos, that a chair has been
provided. There is no monitoring of the collection system served by the pumping station, thus,
monitoring for flooding must depend upon monitoring of the Mill River canal and/or the Connecticut
River.
There are no obvious deficiencies at the station, but its ability to actually pump water if needed may be
questionable.
I will be pleased to discuss any questions you may have.
I will also download and forward photos.
Rick
Appendix B
Drainage Analysis
Summary Tables
Location
Drainage
Area
(acres)
26.9
17.7
44.6
CN
20
20
84
70
20
25
80
74
Fairgrounds Site
10.9
3.4
21.5
13.5
20
73
5.2
15
66
Fair St.
10.4
15
85
25
20
15
66
72
79
Pomeroy Terrace
38.7
20.7
0.7
24.8
7.5
32.3
25.0
30
80
Eastern Ave.
10.0
15
82
Valley St.
19.4
30
69
Lincoln Ave.
Bridge St.
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
70
2-Yr
32.7
9.1
41.9
39.3
10.9
2.2
2.2
8.8
0.4
9.7
2
50.9
47
14.4
54.8
36.2
12.9
12.5
0.7
0.7
3.9
3.9
21.3
9.6
9.6
12
12.8
10.3
8
10-Yr
55.1
20.6
75.7
71.3
19.6
4.4
3.8
18.2
0.4
20.8
5.1
96
88.1
24
102.2
67.2
33.4
26.6
1.3
2.9
8.7
8.7
38.5
32.1
31.3
20.9
32.8
30.8
18.3
25-Yr
72.9
30.7
103.6
97.8
26.7
6.3
4.5
26.2
0.4
30
8.1
132.9
122
31.6
141.2
92.9
52.1
38.8
1.8
11
13
15.2
52.6
107.7
102.3
28.1
105.5
91.6
27.5
50-Yr
88.3
39.9
128.2
121.1
32.9
7.9
5
33.5
0.4
37.7
10.9
165.3
152.5
38.1
175.4
115.8
69.3
49.8
2.3
22.4
16.9
30.8
64.9
183.1
172.8
34.4
177.5
152.5
36.1
100-Yr
108.7
52.6
161.3
152.5
41.2
10.2
5.5
43.4
0.4
48.1
14.8
209.1
193.6
46.8
221.6
146.8
93.4
64.9
2.8
39.2
22.2
53.7
81.5
277.5
265.1
42.8
273.2
237.2
48
B-1
106678-80349-03-11
Location
Drainage
Area
(acres)
Tc
CN
William St.
Henry St.
11.1
9.7
15
15
83
74
2.4
15
70
82.9
34.8
117.7
25
30
84
82
Industrial Dr.
Marshall St.
10-Yr
25-Yr
50-Yr
100-Yr
18.4
14.1
7.2
35.6
35.4
1.3
36.6
36.7
24.1
14.7
68.6
67.9
3
70.4
96.3
32.2
21.2
101.8
101.6
4.4
102.1
160
39.3
26.9
167.8
167.6
5.8
168.3
249.2
48.6
34.8
260.5
260.3
7.6
261.4
92.6
32.9
125.5
155.3
57.5
212.8
206.4
77.3
282.6
250.6
94.6
343.0
309.5
117.7
423.4
13.2
0.7
116.5
117.0
13.0
2.2
117.4
119.5
57.3
9.6
115.6
116.5
27.9
2.9
117.0
117.0
23.9
3.8
118.2
119.5
112.9
32.1
116.5
116.5
40.5
11.0
117.1
117.0
32.8
4.5
118.7
119.5
165.2
107.7
116.6
116.5
51.9
22.4
117.2
117.0
40.7
5.1
119.1
119.5
221.7
183.1
116.6
116.5
67.6
39.2
117.3
117.0
51.4
5.5
119.5
119.5
300.6
277.5
116.7
116.5
24.8
21.5
B-2
106678-80349-03-11
Location
Bridge Rd.
Strawberry Hill Rd.
Straw Avenue
Drainage
Area
(acres)
27.1
54.8
27.7
73.0
18.2
113.9
6.8
3.1
31.0
CN
15
72
15
67
15
66
15
15
25
77
74
78
15
15
15
72
62
61
15
66
15
60
20
54
25
15
64
68
113.9
Junction-4
G
H
I
Junction-5
J
Detention Basin 2 (Inflow)
Detention Basin 2 (Outflow)
Maximum Stage (ft)
Spillway Elevation (ft)
157.8
20.7
17.0
6.3
180.5
14.6
K
Junction-6
L
Junction-7
M
O
8.1
208.6
28.1
241.6
23.0
10.0
14.6
Depot Avenue
2-Yr
10-Yr
25-Yr
50-Yr
100-Yr
17.5
27.9
11.8
32.4
7.1
59.3
6.2
2.3
25.5
59.3
27
186.9
187.5
37.5
63.4
29
74.2
18
124.5
11.8
4.8
47.2
124.5
51.8
188.1
187.5
55
95.5
45.3
112.2
28.5
181
16.5
6.9
65.1
181
55.4
188.2
187.5
70.8
124.7
60.3
146.9
38.2
232.6
20.6
8.7
80.9
232.6
59
188.4
187.5
92.5
165.1
81.4
195
51.8
304.1
26.2
11.3
102.5
304.1
64.9
188.5
187.5
29.4
13.4
4.1
1.3
33.8
5.7
5.7
3.3
180.9
186
65.2
28.7
13
4.5
83
14.5
14.5
6
181.9
186
80.5
42.1
21.5
7.5
115.2
22.9
22.9
7.8
182.9
186
98.7
54.2
29.9
10.5
149.6
30.7
30.7
9.2
183.8
186
120.4
70.8
41.9
14.9
192.8
41.6
41.6
10.8
185.1
186
1.5
34.6
1.5
42.0
6.2
4.7
5.4
89
9.4
108.7
17.5
11.2
9.2
128.9
19.1
165
28.1
17.2
13
171.6
29.2
222.3
37.9
22.7
18.5
229.3
44.6
295.5
51.9
30.4
B-3
106678-80349-03-11
Location
Locust St.
North Main St.
South Main St.
Federal St.
Milton St.
Elm St.
48-inch Pipe
Drainage
Area
(acres)
257.9
16.3
49.3
307.3
26.4
23.0
374.3
49.4
17.6
459.1
478.1
509.5
535.0
17.0
8.5
31.4
19.0
68.4
16.4
535.0
4.4
76.5
23.2
4.4
549.2
14.3
565.2
16.0
585.1
CN
15
73
15
20
76
74
15
15
65
61
15
15
15
15
25
15
73
74
70
73
67
60
15
20
20
73
74
82
15
84
15
68
2-Yr
47.2
11.3
38
74.7
22.5
16
89.3
17.5
3.7
106.9
93.2
97.6
101.7
11.8
6.3
17.5
13.2
25.1
3
73.8
29.0
53.0
16.1
4.8
76.7
18.9
76.6
7.6
80.3
10-Yr
118.0
23.7
74.1
171.5
43.9
32.3
209.3
46.1
12.6
254.2
221.7
230.2
237.8
24.7
13
39.2
27.6
62.5
10.9
157.4
82.5
111.2
32.6
8.4
161.1
32
156.7
17.9
162.4
25-Yr
183.7
34.4
104.8
262.7
61.9
46.3
320.8
73.7
21
390.6
340
353.3
364.1
35.8
18.6
58.8
40.1
96.2
18.6
239.2
127.9
161.4
46.7
11.2
243.2
42.4
235
27.5
242.7
50-Yr
247.7
44.1
132.8
349.6
77.9
58.7
425.7
99.6
29.5
518.1
450.5
467.3
481.8
45.8
23.7
76.6
51.3
127.2
26.2
315.7
169.6
206.6
59.2
13.7
320.3
51.4
308.5
36.4
317.6
100-Yr
333.3
57.3
170.9
471.6
99.7
75.7
573.1
136.2
41.7
697.6
607.2
626.8
646.4
59.5
30.6
101.3
66.7
170.3
37.4
423.7
227
268.3
76.4
17
429.2
63.4
412.1
48.7
423.1
B-4
106678-80349-03-11
Location
Washington St.
Drainage
Area
(acres)
19.8
27.5
27.5
689.1
CN
15
86
2-Yr
28.8
27.2
27.2
26.9
148.2
153.55
123.6
10-Yr
47.3
82.2
82.2
75.7
150.3
153.55
261
25-Yr
61.9
126.3
126.3
104.3
152.4
153.55
376.8
50-Yr
74.4
167
167
150.2
154.0
153.55
485.6
100-Yr
91.1
223
223
210
154.8
153.55
664.3
B-5
106678-80349-03-11
Location
Drainage Area
2-year
Tc
CN
10-year
25-year
50-year
100-year
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
95
46.8
5.0
56.7
6.1
70.4
4.8
82.1
9.1
97.7
83
31.8
3.0
41.6
3.9
55.4
3.5
67.4
6.4
83.4
78.3
8.0
97.8
10.0
125.2
4.2
148.7
15.4
180.0
52.5
4.9
66.6
6.3
86.5
3.9
103.6
9.9
126.2
(mi2)
(ac)
KS-E
0.0302
19.3
19
KS-F
0.0278
17.8
15
0.0580
37.1
0.0394
25.2
0.0580
37.1
73.3
8.0
91.6
10.0
117.2
4.2
139.2
15.4
168.4
0.0973
62.3
100.4
12.9
125.6
16.3
161.1
4.1
191.5
25.4
232.0
0.0973
62.3
98.9
12.9
123.9
16.3
158.8
4.1
188.8
25.4
228.8
J-1
KS-G
King 36"
J-2
King 48"
15
KS-I
0.0249
16.0
38.8
3.7
47.8
4.6
60.2
4.5
70.9
7.0
84.9
J-3
0.1223
78.3
114.3
16.6
142.9
20.9
182.9
4.2
217.3
32.4
263.0
0.1223
78.3
114.3
16.6
142.9
20.9
182.9
4.2
183.1
31.3
183.1
King 48"/54"
0.1223
78.3
112.8
16.6
141.2
20.9
181.0
4.2
183.1
31.3
183.1
KS-J
0.0258
16.5
15
89
36.7
3.5
46.0
4.4
59.0
4.1
70.2
6.8
84.9
KS-K
0.0324
20.7
15
88
44.6
4.2
56.3
5.3
72.6
4.0
86.6
8.4
105.2
KS-L
0.0425
27.2
15
85
52.7
4.9
67.9
6.4
89.2
3.7
107.7
10.2
132.2
KS-M
0.0070
4.5
15
84
8.4
0.8
10.9
1.0
14.4
3.6
17.5
1.7
21.5
0.0820
52.4
105.7
9.9
135.0
12.7
176.2
3.8
211.8
20.2
258.9
0.0820
52.4
103.8
9.9
132.6
12.7
173.0
3.8
207.8
20.2
253.8
0.2300
147.2
184.0
29.9
234.0
38.0
304.1
4.0
364.3
58.4
443.9
King 54"
0.2300
147.2
183.2
29.9
232.8
38.0
302.4
4.0
362.4
58.4
441.4
KS-Q
0.0386
24.7
63.1
6.2
76.9
7.6
95.9
4.7
112.2
11.3
133.7
J-9
0.2686
171.9
229.7
36.1
289.7
45.6
373.8
4.1
446.0
69.7
541.7
King 54"/66"
0.2686
171.9
225.1
36.1
283.8
45.6
366.1
4.1
436.8
69.7
529.8
KS-R
0.0230
14.7
39.1
3.9
47.2
4.8
58.4
4.9
67.9
7.0
80.6
J-10
0.2916
186.6
243.0
40.0
305.4
50.4
392.8
4.2
467.9
76.8
567.1
Div. at North St
J-8
Trumbull 24"
J-7
Div. at Main St
15
87
15
15
92
94
96
0.2916
186.6
232.8
39.6
235.4
47.7
285.2
3.8
285.2
68.3
285.2
King 60"/66"
0.2916
186.6
218.0
39.6
229.4
47.7
282.5
3.8
285.2
68.3
285.2
KS-T
0.0164
10.5
28.4
2.9
34.1
3.5
42.0
5.0
48.8
5.1
57.8
15
97
B-6
106678-80349-03-11
Location
King Street @ Pleasant
Street
Hampton Avenue
Drainage Area
(mi2)
(ac)
0.3079
197.1
0.3079
197.1
0.0119
7.6
2-year
Tc
CN
15
95
34
78
27
75
10-year
25-year
50-year
100-year
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
221.9
42.5
234.9
51.2
289.1
3.9
292.9
73.4
296.8
221.9
42.5
234.9
51.2
289.1
3.9
292.9
73.4
296.8
19.9
2.0
24.1
2.4
30.0
4.8
35.0
3.6
41.6
19.9
2.0
24.1
2.4
30.0
4.8
35.0
3.6
41.6
47.1
6.1
64.1
8.3
88.8
3.0
110.5
14.2
139.9
45.4
6.1
61.8
8.3
85.5
3.0
106.4
14.2
134.7
18.7
2.2
26.2
3.1
37.2
2.8
47.0
5.4
60.4
53.3
8.4
72.5
11.3
100.6
3.0
125.3
19.6
158.7
0.0119
7.6
0.0707
45.2
0.0707
45.2
KS-B
0.0293
18.7
0.0999
63.9
Brook Woodmont Rd
0.0999
63.9
52.9
8.4
72.1
11.3
99.9
3.0
124.5
19.6
157.7
KS-D
0.0233
14.9
31
92
27.8
3.5
34.3
4.3
43.3
4.5
50.9
6.6
61.0
0.0145
9.3
15
83
16.6
1.5
21.7
2.0
29.0
3.5
35.2
3.3
43.6
0.1377
88.1
66.5
13.4
89.0
17.7
121.5
3.3
150.2
29.5
188.8
Market 48"
0.1377
88.1
66.0
13.4
88.3
17.7
120.7
3.3
149.1
29.5
187.4
KS-H
0.0097
6.2
13.8
1.3
17.3
1.6
22.2
4.1
26.4
2.6
31.9
0.1474
94.4
68.9
14.7
90.8
19.3
123.6
3.3
182.1
33.1
264.6
Market 44"/48"
0.1474
94.4
68.0
14.7
89.9
19.3
122.5
3.3
174.8
33.1
255.6
KS-O
0.0480
30.7
19
89
63.5
6.4
79.6
8.1
102.1
4.1
121.3
12.7
146.7
KS-P
0.0065
4.2
20
90
8.7
0.9
10.9
1.1
13.9
4.2
16.5
1.8
19.8
0.0357
22.8
26
82
32.1
3.7
42.3
4.8
56.8
3.4
69.5
8.0
86.4
0.0357
22.8
29.7
3.7
39.2
4.8
52.6
3.4
64.3
8.0
80.0
0.2376
152.1
137.1
26.2
193.5
36.1
263.0
4.0
371.2
64.0
543.3
Market 72"
0.2376
152.1
120.5
26.2
189.3
36.1
260.9
4.0
367.1
64.0
534.9
KS-S
0.0370
23.7
51.7
5.0
64.8
6.3
83.2
4.1
98.8
9.8
119.5
0.2746
175.8
133.3
31.1
199.2
42.4
272.2
4.0
387.0
73.8
558.2
0.2746
175.8
128.6
31.1
198.0
42.4
271.2
4.0
384.6
73.8
553.7
KS-A
J-4
Culvert @ Bikeway
Culvert @ Woodmont
Road
KS-C
J-5
J-6
KS-N
Market 18"/21"
J-11
J-13
Market 82"
15
16
89
89
B-7
106678-80349-03-11
Drainage Area
Tc
CN
KS-W
0.0151
9.7
15
KS-V
0.0049
3.1
15
0.2947
J-14
Location
Market 60"
KS-X
J-15
Market Street Old Mill
River
2-year
10-year
25-year
50-year
100-year
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
(ac-ft)
(cfs)
90
22.2
2.1
27.7
2.6
35.3
4.2
41.8
4.1
50.4
96
8.4
0.8
10.1
1.0
12.5
4.9
14.5
1.5
17.2
188.6
133.6
34.1
202.7
46.0
276.6
4.0
392.7
79.4
563.1
0.2947
188.6
130.5
34.1
202.2
46.0
275.7
4.0
390.2
79.4
558.5
0.0058
3.7
7.1
0.7
9.2
0.9
12.1
3.7
14.6
1.4
17.9
0.3004
192.3
131.5
34.7
203.3
46.9
277.0
4.0
392.0
80.8
560.6
0.3004
192.3
131.5
34.7
203.3
46.9
277.0
4.0
392.0
80.8
560.6
15
85
B-8
106678-80349-03-11
Location
RR-A1
Gregory Ln DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Gregory Lane
RR-A2
Matthew Dr DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Matthew Lane
Drainage Area
2
(mi )
(ac)
0.0455
29.1
0.0455
29.1
0.0248
0.0703
15.9
45.0
0.0703
0.0377
0.0377
0.0100
0.1179
0.1179
0.0378
0.1557
0.1557
0.0332
0.1888
0.1888
45.0
24.1
24.1
6.4
75.4
75.4
24.2
99.6
99.6
21.2
120.9
120.9
Tc
CN
34
56
16
50
45
59
15
63
19
60
15
71
2-year
(cfs)
5.3
2.1
5.3
2.1
282.7
0.3
288.0
10-year
(cfs)
10.6
2.9
10.6
2.9
283.6
0.5
288.0
25-year
(cfs)
20.2
3.2
20.2
3.2
285.1
1.3
288.0
100-year
(cfs)
44.1
3.8
44.1
3.8
288.0
3.2
288.0
1.2
2.3
2.6
2.3
280.2
0.2
284.0
3.3
3.3
5.0
3.3
280.9
0.3
284.0
8.4
4.1
9.9
4.1
281.7
0.6
284.0
23.1
5.6
24.6
5.6
283.7
1.3
284.0
2.3
5.6
5.6
3.5
7.0
7.0
8.9
11.6
11.5
21.0
25.1
25.1
3.3
10.2
10.2
5.8
13.5
13.4
16.1
20.2
20.1
30.6
40.3
40.3
4.1
18.0
18.0
9.5
24.5
24.1
27.9
34.9
34.8
45.1
64.9
64.9
10.8
36.6
36.5
17.8
48.1
47.4
55.8
70.5
70.3
76.4
121.5
121.5
B-9
106678-80349-03-11
Location
Lincoln Ave.
Bridge St.
Fair St.
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Pomeroy Terrace
Drainage
Area
(acres)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
CN
20
20
86
71
15
67
15
86
15
25
78
74
15
15
79
79
15
82
15
95
15
80
20
15
76
87
25
30
66
81
2-Yr
35.8
9.9
45.7
43
2.2
45
41.5
15.1
49.7
32.9
34.6
2.2
4.4
4.4
8.4
0.7
1.8
1.8
5.8
1.4
2.1
2.5
0.6
7.6
1.3
0.7
7.9
12.9
22.5
10-Yr
58.5
21.7
80.2
75.6
5.5
80.3
73.6
24.7
87.7
58
64.8
4.4
10.8
10.8
15.5
1.3
4.8
4.8
10.2
3.5
3
4.8
1.1
19.4
2.5
1.1
20.3
33.4
39.9
25-Yr
76.4
32
108.4
102.4
8.5
109.4
100.1
32.3
118.9
79
90
6.3
13.7
13.7
21.3
1.8
8.1
8.1
13.7
5.6
3.8
7.5
1.5
28.3
3.4
1.4
30.4
52.1
54.2
50-Yr
91.8
41.3
133.1
125.8
11.3
135
123.4
38.9
146.3
97.4
112.1
7.9
15.5
15.5
26.5
2.3
10.9
10.9
16.8
7.4
4.4
9.7
1.9
35.3
4.3
1.7
38.2
69.3
66.6
100-Yr
112.2
54.1
166.3
157.3
15.3
169.4
154.9
47.6
183.3
122.2
142
10.2
17.9
17.9
33.4
2.8
13.1
13.1
20.9
9.9
5.2
12.8
2.4
42.7
5.5
2.1
47
93.4
83.1
B-10
106678-80349-03-11
Location
Eastern Ave.
Valley St.
William St.
Herny St.
Industrial Dr.
Marshall St.
Drainage
Area
(acres)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
CN
15
83
30
70
15
15
85
75
15
70
25
30
85
83
2-Yr
10-Yr
25-Yr
50-Yr
100-Yr
10.4
10.4
12.6
13.2
10.9
8.7
19.3
15.5
7.7
38.2
37.9
1.3
39.1
41.3
40
21.6
41.7
38.5
19.3
40.8
25.8
15.4
72
71.1
3
73.6
110.2
104.5
28.9
107.7
94
28.7
98.7
33.9
21.9
104.4
104.1
4.4
104.6
174.2
165.6
35.2
170.4
147.9
37.4
155.1
41
27.7
162.8
162.6
5.8
163.3
253.2
242.1
43.6
250.3
220.1
49.4
232.3
50.3
35.7
243.1
242.6
7.6
243.7
96.9
34.6
131.5
160.4
59.5
219.6
211.7
79.5
289.7
256
96.8
350.1
314.8
119.9
430.5
5.8
1.4
112.3
115.0
36.2
4.4
114.1
119.0
7.7
7.6
113.2
10.2
3.5
112.7
115.0
68.4
10.8
115.1
119.0
19.7
19.4
113.4
13.7
5.6
113.0
115.0
95.2
13.7
116.0
119.0
28.7
28.3
113.6
16.8
7.4
113.3
115.0
118.9
15.5
119.6
119.0
35.7
35.3
113.7
20.9
9.9
113.6
115.0
150.8
17.9
119.9
119.0
43.0
42.7
113.8
0.0
0.0
0.0
B-11
106678-80349-03-11
Location
Drainage
Area
(acres)
0.0
180.6
CN
2-Yr
114.0
112.85
9.1
1.8
112.7
117.0
54.8
10.4
115.7
116.5
10-Yr
114.0
112.85
16.8
4.8
113.3
117.0
119.9
41.3
116.5
116.5
25-Yr
114.0
112.85
23.2
8.1
113.8
117.0
173.5
110.2
116.6
116.5
50-Yr
114.0
112.85
28.7
10.9
114.2
117.0
218.9
174.2
116.6
116.5
100-Yr
114.0
112.85
36.2
13.1
114.8
117.0
280.6
253.2
116.7
116.5
B-12
106678-80349-03-11
Location
Bridge Rd.
Strawberry Hill Rd.
Straw Avenue
Drainage
Area
(acres)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
CN
15
15
73
73
15
68
15
66
15
15
25
77
75
79
15
67
15
62
15
67
15
60
2-Yr
14.4
18.8
17.8
12.2
12.0
29.5
28.1
7.1
33.9
32.6
6.2
2.3
27.0
62.1
30.9
30.2
33.6
32.7
7.4
7.1
1.5
8.6
8.2
6.3
3.5
3.5
1.5
39.1
38.7
10-Yr
30.1
39.4
36.2
29.9
30.2
66.1
61.7
18.0
76.7
72.9
11.8
4.8
49.0
128.4
52.1
52.0
65.9
64.1
17.9
17.6
4.8
22.4
20.8
15.4
6.2
6.2
5.4
89.8
88.3
25-Yr
43.8
57.1
52.2
46.6
46.6
98.7
91.6
28.5
115.3
109.7
16.5
6.9
67.1
185.6
55.8
55.7
82.4
79.3
27.9
27.3
8.0
35.2
32.7
24.0
8.0
8.0
9.2
125.3
122.8
50-Yr
56.0
73.1
66.9
62.0
61.5
128.4
119.3
38.2
150.4
143.4
20.6
8.7
83.0
237.7
59.3
59.3
101.6
96.7
37.1
36.2
11.1
47.0
43.9
31.9
9.4
9.4
13.0
159.5
155.2
100-Yr
72.7
95.0
87.0
83.3
82.2
169.3
157.6
51.8
198.9
190.0
26.2
11.3
104.8
309.7
65.6
65.6
122.5
116.2
50.0
48.6
15.5
63.6
59.4
43.0
10.9
10.9
18.5
200.3
195.3
B-13
106678-80349-03-11
Location
Depot Avenue
Locust St.
North Main St.
Elm St.
Hospital Rd.
Drainage
Area
(acres)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
CN
20
54
25
66
15
68
15
80
15
20
76
78
15
15
65
61
25
15
68
60
15
73
15
70
2-Yr
1.5
39.7
39.7
7.7
7.2
4.7
47.5
47.4
17.6
55.6
22.5
20.5
42.5
86.2
84.6
17.5
3.7
101.4
96.0
27.7
3.0
120.0
101.4
13.2
104.5
104.6
17.5
109.1
108.8
10-Yr
9.4
95.6
94.9
19.8
18.3
11.2
117.3
116.5
31.8
129.4
43.9
38.2
80.0
186.3
182.1
46.1
12.6
224.4
213.2
66.1
10.9
271.6
230.8
27.6
237.1
236.1
39.2
245.6
245.4
25-Yr
19.1
138.4
138.9
30.9
28.6
17.2
176.8
176.9
43.5
198.6
61.9
52.8
111.4
279.2
272.7
73.7
21.0
337.6
321.1
100.5
18.6
410.0
349.2
40.1
357.9
357.7
58.8
371.0
369.4
50-Yr
29.2
181.2
180.9
41.1
38.2
22.7
234.3
231.4
53.6
262.8
77.9
65.6
139.8
367.8
356.3
99.6
29.5
444.2
421.4
131.9
26.2
539.3
458.1
51.3
469.7
470.1
76.6
486.7
485.9
100-Yr
44.6
233.4
234.7
55.4
51.8
30.4
306.3
305.1
67.3
346.2
99.7
83.0
178.4
487.3
470.6
136.2
41.7
590.5
558.1
175.6
37.4
718.0
610.4
66.7
626.3
624.5
101.3
645.7
646.7
B-14
106678-80349-03-11
Location
North Elm St.
48-inch Pipe
Washington St.
Federal St.
Milton St.
Elm St.
Drainage
Area
(acres)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
689.0
113.9
14.6
CN
15
73
15
74
15
84
15
68
15
87
15
20
20
74
74
84
2-Yr
11.8
12.0
6.3
113.2
79.6
78.8
18.9
82.0
79.3
7.6
80.8
30.1
84.6
57.0
16.1
5.3
34.8
30.7
33.7
33.2
128.7
62.1
30.9
187.1
187.5
6.3
3.5
181.0
186.0
10-Yr
24.7
24.6
13.0
253.2
167.3
165.9
32.0
170.9
162.9
17.9
165.8
48.7
171.6
116.5
32.6
8.9
88.0
81.4
87.3
78.9
270.2
128.4
52.1
188.1
187.5
15.4
6.2
182.0
186.0
25-Yr
35.8
35.4
18.6
381.6
250.5
247.6
42.4
254.4
241.4
27.5
245.5
63.3
253.1
167.5
46.7
11.8
134.1
123.9
132.0
107.8
387.1
185.6
55.8
188.2
187.5
24
8.0
183.0
186.0
50-Yr
45.8
45.0
23.7
500.9
328.1
324.0
51.4
332.5
314.5
36.4
319.9
75.8
329.1
213.1
59.2
14.3
176.4
162.6
173.2
156.5
506.5
237.7
59.3
188.4
187.5
31.9
9.4
184.0
186.0
100-Yr
59.5
58.2
30.6
665.6
436.0
431.1
63.4
441.5
416.9
48.7
423.8
92.4
434.8
275.3
76.4
17.6
233.9
215.9
229.3
216.6
683.3
309.7
65.6
188.6
187.5
43
10.9
185.2
186.0
B-15
106678-80349-03-11
Location
Drainage
Area
(acres)
27.5
CN
2-Yr
33.7
33.2
148.4
153.55
10-Yr
87.3
78.9
150.5
153.55
25-Yr
132
107.8
152.7
153.55
50-Yr
173.2
156.5
154.1
153.55
100-Yr
229.3
216.6
154.9
153.55
B-16
106678-80349-03-11
Location
Drainage Area
2
(mi )
(ac)
0.0302
19.3
0.0278
17.8
0.0580
37.1
0.0394
25.2
0.0580
37.1
0.0973
62.3
0.0973
62.3
0.0249
16.0
0.1223
78.3
0.1223
78.3
0.1223
78.3
0.0258
16.5
0.0324
20.7
0.0425
27.2
0.0070
4.5
0.0820
52.4
0.0820
52.4
0.2300
147.2
0.2300
147.2
0.0386
24.7
0.2686
171.9
0.2686
171.9
0.0230
14.7
0.2916
186.6
0.2916
186.6
0.2916
186.6
0.0164
10.5
0.3079
197.1
0.3079
197.1
0.0119
7.6
Tc
CN
19
15
95
83
15
87
15
92
15
15
15
15
89
88
85
84
15
94
15
96
15
97
15
95
2-year
(cfs)
46.8
34.4
80.8
52.5
75.7
102.8
101.2
38.8
116.7
116.7
115.0
36.7
44.6
56.6
9.1
110.3
108.3
188.9
188.0
63.1
234.7
229.9
39.1
247.8
234.2
217.5
28.4
221.2
221.2
19.9
10-year
(cfs)
56.7
44.3
100.5
66.6
94.0
128.2
126.4
47.8
145.4
145.4
143.5
46.0
56.3
71.9
11.6
139.8
137.3
239.2
237.8
76.9
295.0
288.9
47.2
310.5
239.0
232.7
34.1
238.2
238.2
24.1
25-year
(cfs)
70.4
58.2
127.9
86.5
119.7
163.7
161.4
60.2
185.5
183.1
182.5
59.0
72.6
93.4
15.1
181.2
177.8
309.4
307.7
95.9
379.3
371.4
58.4
398.1
285.2
283.2
42.0
289.8
289.8
30.0
100-year
(cfs)
97.7
86.3
182.8
126.2
171.0
234.7
231.4
84.9
265.6
183.1
183.1
84.9
105.2
136.3
22.2
263.7
258.5
449.1
446.6
133.7
547.1
535.0
80.6
572.3
285.2
285.2
57.8
297.0
297.0
41.6
B-17
106678-80349-03-11
Location
Culvert @ Bikeway
Drainage Area
2
(mi )
(ac)
0.0119
7.6
0.0707
45.2
0.0707
45.2
0.0293
18.7
0.0999
63.9
0.0999
63.9
0.0233
14.9
0.0145
9.3
0.1377
88.1
0.1377
88.1
0.0097
6.2
0.1474
94.4
0.1474
94.4
0.0480
30.7
0.0065
4.2
0.0357
22.8
0.0357
22.8
0.2376
152.1
0.2376
152.1
0.0370
23.7
0.2746
175.8
0.2746
175.8
0.0151
9.7
0.0049
3.1
0.2947
188.6
0.2947
188.6
0.0058
3.7
0.3004
192.3
0.3004
192.3
Tc
CN
34
78
27
75
31
15
92
83
15
89
19
20
26
89
90
82
16
89
15
15
90
96
15
85
2-year
(cfs)
19.9
51.7
49.8
19.7
58.0
57.7
27.8
18.0
71.4
70.9
15.1
72.8
72.2
69.4
8.7
32.1
29.7
144.3
135.5
56.5
149.1
144.2
24.8
8.4
149.4
145.9
8.2
147.0
147.0
10-year
(cfs)
24.1
69.1
66.6
27.3
77.8
77.3
34.3
23.2
94.4
93.7
18.6
96.1
95.3
85.4
10.9
42.3
39.2
199.2
195.8
69.6
206.1
205.0
30.2
10.1
210.3
209.7
10.3
211.0
211.0
25-year
(cfs)
30.0
94.3
90.8
38.5
106.4
105.7
43.3
30.4
127.5
126.6
23.4
129.6
128.4
107.7
13.9
56.8
52.6
269.9
267.6
87.7
281.4
279.6
37.6
12.5
287.4
286.1
13.2
287.8
287.8
100-year
(cfs)
41.6
146.0
140.5
61.9
165.0
164.0
61.0
45.1
195.3
193.8
33.0
272.0
262.8
151.8
19.8
86.4
80.0
554.9
546.3
123.6
570.1
565.5
52.5
17.2
575.3
570.4
19.0
572.6
572.6
B-18
106678-80349-03-11
Location
RR-A1
Gregory Ln DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Gregory Lane
RR-A2
Matthew Dr DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Matthew Lane
Drainage Area
2
(mi )
(ac)
0.0455
29.1
0.0455
29.1
0.0248
0.0703
15.9
45.0
0.0703
0.0377
0.0377
0.0100
0.1179
0.1179
0.0378
0.1557
0.1557
0.0332
0.1888
0.1888
45.0
24.1
24.1
6.4
75.4
75.4
24.2
99.6
99.6
21.2
120.9
120.9
Tc
CN
34
56
16
54
45
60
15
63
19
60
15
71
2-year
(cfs)
5.3
2.1
5.3
2.1
282.7
0.3
288.0
10-year
(cfs)
10.6
2.8
10.6
2.8
283.6
0.6
288.0
25-year
(cfs)
20.2
3.1
20.2
3.1
285.1
1.3
288.0
100-year
(cfs)
44.1
3.8
44.1
3.8
288.0
3.2
288.0
2.6
2.6
3.1
2.6
280.2
0.2
284.0
6.0
3.5
6.6
3.5
281.1
0.4
284.0
12.6
4.4
13.6
4.4
282.1
0.7
284.0
29.2
6.0
30.8
6.0
284.3
1.5
284.0
2.6
6.3
6.3
3.5
8.3
8.2
8.9
11.9
11.8
21.0
25.1
25.1
3.5
11.1
11.1
5.8
15.5
15.3
16.1
20.7
20.6
30.6
40.4
40.4
4.4
19.2
19.1
9.5
26.2
25.9
27.9
35.8
35.7
45.1
65.1
65.1
11.3
38.1
38.1
17.8
50.2
49.5
55.8
72.4
72.2
76.4
122.1
122.1
B-19
106678-80349-03-11
Hydrologic Element
2
1
Junction-A
Reach-1
FG2
FG5
E-Pond2
FG3
E-Pump
E-CP1
3
Junction-B
Reach-2
4
Junction-C
Reach-3
6
FG1
FG6
E-Pond1
FG4
E-CP2
5
Wetland
Reach-4
7
Junction-E
Reach-5
8
Junction-E2
9
10
Junction-F
Reach-6
11
G-Mill River
13
12
42-inch Pipe
Location
Lincoln Ave.
Bridge St.
Fairgrounds Site
Fairgrounds Site
Drainage Area
(acres)
26.9
17.7
44.6
Tc
20
20
CN
84
70
20
25
80
74
Fairgrounds Site
10.9
3.4
21.5
13.5
20
73
5.2
15
66
Fair St.
10.4
15
85
25
20
15
66
72
79
Pomeroy Terrace
38.7
20.7
0.7
24.8
7.5
32.3
25.0
30
80
Eastern Ave.
10.0
15
82
Valley St.
19.4
30
69
William St.
Henry St.
11.1
9.7
15
15
83
74
2.4
15
70
82.9
34.8
117.7
25
30
84
82
Fairgrounds Site
Fairgrounds Site
Industrial Dr.
Marshall St.
70
2-Yr
32.7
9.1
41.9
39.3
10.9
2.2
2.2
8.8
0.4
9.7
2
50.9
47
14.4
54.8
36.2
12.9
12.5
0.7
0.7
3.9
3.9
21.3
9.6
9.6
12
12.8
10.3
8
18.4
14.1
7.2
35.6
35.4
1.3
36.6
92.6
32.9
125.5
100-Yr
108.7
52.6
161.3
152.5
41.2
10.2
5.5
43.4
0.4
48.1
14.8
209.1
193.6
46.8
221.6
146.8
93.4
64.9
2.8
39.2
22.2
53.7
81.5
277.5
265.1
42.8
273.2
237.2
48
249.2
48.6
34.8
260.5
260.3
7.6
261.4
309.5
117.7
423.4
24.8
21.5
13.2
0.7
116.5
117.0
13.0
2.2
117.4
119.5
57.3
9.6
115.6
116.5
27.9
2.9
117.0
117.0
23.9
3.8
118.2
119.5
112.9
32.1
116.5
116.5
40.5
11.0
117.1
117.0
32.8
4.5
118.7
119.5
165.2
107.7
116.6
116.5
51.9
22.4
117.2
117.0
40.7
5.1
119.1
119.5
221.7
183.1
116.6
116.5
67.6
39.2
117.3
117.0
51.4
5.5
119.5
119.5
300.6
277.5
116.7
116.5
Total Area
Area
Watershed
(acres)
(sq. mi.)
1
2
3
4
5
6
7
8
9
10
11
12
13
FG1
FG2
FG3
FG4
FG5
FG6
17.7
0.0277
2.3
13%
70
20
12
26.9
0.0420
12.4
46%
84
20
12
5.2
0.0081
0.7
14%
66
15
10.3
0.0162
5.3
51%
85
15
25.0
0.0391
9.6
38%
80
30
18
38.7
0.0605
2.7
7%
66
25
15
10.0
0.0156
4.4
45%
82
15
19.4
0.0303
3.3
17%
69
30
18
11.1
0.0174
6.3
56%
83
15
9.7
0.0151
3.4
35%
74
15
2.3
0.0037
0.1
6%
70
15
34.7
0.0543
11.7
34%
82
30
18
82.9
0.1296
45.1
54%
84
25
15
20.7
0.0324
2.9
14%
72
20
12
10.9
0.0171
3.6
33%
80
20
12
13.5
0.0211
3.2
24%
73
20
12
7.5
0.0117
1.3
17%
70
20
12
3.4
0.0053
0.6
19%
74
25
15
0.7
0.0011
0.3
48%
79
15
1500
0.005
1.3
19.2
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 4
Hydraulic Length
Slope
*Velocity
Tc4
Tc Used
Lag Time
990
0.005
1.3
12.7
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 7
Hydraulic Length
Slope
*Velocity
Tc7-1
Hydraulic Length
Slope
*Velocity
Tc7-2
Total Tc7
Tc Used
Lag Time
540
0.009
1.7
5.3
360
0.014
2.0
3.0
8.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 11
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
400
0.005
1.3
5.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 2
Hydraulic Length
Slope
*Velocity
Tc2
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 5
Hydraulic Length
Slope
*Velocity
Tc5-1
Hydraulic Length
Slope
*Velocity
Tc5-2
Hydraulic Length
Slope
*Velocity
Tc5-3
Total TcF
Tc Used
Lag Time
240
0.005
1.3
3.1
60
0.170
7.5
0.1
1950
0.005
1.3
25.0
28.2
30.0
0.30
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 8
Hydraulic Length
Slope
*Velocity
Tc8
Tc Used
Lag Time
1440
0.002
0.8
30.0
30.0
0.30
Area 12
Hydraulic Length
Slope
*Velocity
Tc12
Tc Used
Lag Time
1650
0.003
0.9
30.6
30.0
0.30
Area 3
Hydraulic Length
Slope
*Velocity
Tc3
Tc Used
Lag Time
510
0.005
1.3
6.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 6
Hydraulic Length
Slope
*Velocity
Tc6
Tc Used
Lag Time
1740
0.005
1.3
22.3
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area 9
Hydraulic Length
Slope
*Velocity
Tc9
Tc Used
Lag Time
1260
0.020
2.5
8.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 10
Hydraulic Length
Slope
*Velocity
Tc10
Tc Used
Lag Time
1050
0.005
1.3
13.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 13
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
1650
0.005
1.3
21.2
25.0
0.25
ft
ft/ft
fps
min
min
hr
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
600
0.004
1.2
8.3
0.14
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
2010
0.003
0.9
39.4
0.7
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD
tD
450
0.005
1.3
5.8
0.10
ft
ft/ft
fps
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
1290
0.008
1.5
14.3
0.24
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
150
0.003
0.9
2.8
0.05
ft
ft/ft
fps
min
hour
Hydrologic Element
2
1
Junction-A
Reach-1
3
Junction-B
Reach-2
4
Junction-C
Reach-3
FGP1
FGP7
Ppond2
SWTC2
FGP3
FGP8
Ppond4
SWCT1
FGP2
Ppond1
FGP6
SWTC3
FGP5
Ppond3
FGP4
FGP9
P-CP2
6
5
Wetland
Reach-4
7
Junction-E
Reach-5
8
Junction-E2
9
10
Junction-F
Reach-6
11
G-Mill River
13
12
42-inch Pipe
Location
Lincoln Ave.
Bridge St.
Old Ferry Rd.
Fair St.
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Pomeroy Terrace
Eastern Ave.
Valley St.
William St.
Herny St.
Industrial Dr.
Marshall St.
Drainage Area
(acres)
26.9
17.7
44.6
44.6
5.2
49.8
49.8
10.4
60.1
60.1
35.9
3.4
39.3
39.3
8.3
0.7
9.0
9.0
4.9
4.9
1.0
5.9
0.6
54.7
1.6
0.4
56.7
38.7
25.0
180.6
180.6
10.0
190.6
190.6
19.4
210.0
11.1
9.7
230.8
230.8
2.4
233.1
82.9
34.7
117.7
Tc(min)
20
20
CN
86
71
15
67
15
86
15
25
78
74
15
15
79
79
15
82
15
95
15
80
20
15
76
87
25
30
66
81
15
83
30
70
15
15
85
75
15
70
25
30
85
83
2-Yr
35.8
9.9
45.7
43
2.2
45
41.5
15.1
49.7
32.9
34.6
2.2
4.4
4.4
8.4
0.7
1.8
1.8
5.8
1.4
2.1
2.5
0.6
7.6
1.3
0.7
7.9
12.9
22.5
10.4
10.4
12.6
13.2
10.9
8.7
19.3
15.5
7.7
38.2
37.9
1.3
39.1
96.9
34.6
131.5
100-Yr
112.2
54.1
166.3
157.3
15.3
169.4
154.9
47.6
183.3
122.2
142
10.2
17.9
17.9
33.4
2.8
13.1
13.1
20.9
9.9
5.2
12.8
2.4
42.7
5.5
2.1
47
93.4
83.1
253.2
242.1
43.6
250.3
220.1
49.4
232.3
50.3
35.7
243.1
242.6
7.6
243.7
314.8
119.9
430.5
4.9
39.3
54.7
9.0
180.6
5.8
1.4
112.3
115.0
36.2
4.4
114.1
119.0
7.7
7.6
113.2
114.0
112.85
9.1
1.8
112.7
117.0
54.8
10.4
115.7
116.5
10.2
3.5
112.7
115.0
68.4
10.8
115.1
119.0
19.7
19.4
113.4
114.0
112.85
16.8
4.8
113.3
117.0
119.9
41.3
116.5
116.5
13.7
5.6
113.0
115.0
95.2
13.7
116.0
119.0
28.7
28.3
113.6
114.0
112.85
23.2
8.1
113.8
117.0
173.5
110.2
116.6
116.5
16.8
7.4
113.3
115.0
118.9
15.5
119.6
119.0
35.7
35.3
113.7
114.0
112.85
28.7
10.9
114.2
117.0
218.9
174.2
116.6
116.5
20.9
9.9
113.6
115.0
150.8
17.9
119.9
119.0
43.0
42.7
113.8
114.0
112.85
36.2
13.1
114.8
117.0
280.6
253.2
116.7
116.5
Tc Min)
Lag Time
(Min)
13%
71
20
12
12.4
46%
86
20
12
0.7
14%
67
15
0.0162
5.3
51%
86
15
25.0
0.0391
9.6
38%
81
30
18
38.7
0.0605
2.7
7%
66
25
15
10.0
0.0156
4.4
45%
83
15
19.4
0.0303
3.3
17%
70
30
18
11.1
0.0174
6.3
56%
85
15
9.7
0.0151
3.4
35%
75
15
2.3
0.0037
0.1
6%
70
15
34.7
0.0543
11.7
34%
83
30
18
82.9
0.1296
30.7
37%
85
25
15
35.9
0.0561
12.2
34%
78
15
4.9
0.0076
2.7
55%
82
15
8.3
0.0129
2.0
24%
79
15
1.6
0.0025
0.2
15%
76
20
12
0.6
0.0009
0.3
52%
80
15
1.0
0.0016
0.9
92%
95
15
3.4
0.0053
0.6
19%
74
25
15
0.7
0.0011
0.3
49%
79
15
0.5
0.0007
0.3
63%
87
15
Total Area
Area
Impervious %Imp.
(acres)
Watershed
(acres)
(sq. mi.)
1
2
3
4
5
6
7
8
9
10
11
12
13
FGP1
FGP2
FGP3
FGP4
FGP5
FGP6
FGP7
FGP8
FGP9
17.7
0.0277
2.3
26.9
0.0420
5.2
0.0081
10.3
1500
0.005
1.3
19.2
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 4
Hydraulic Length
Slope
*Velocity
Tc4
Tc Used
Lag Time
990
0.005
1.3
12.7
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 7
Hydraulic Length
Slope
*Velocity
Tc7-1
Hydraulic Length
Slope
*Velocity
Tc7-2
Total Tc7
Tc Used
Lag Time
540
0.009
1.7
5.3
360
0.014
2.0
3.0
8.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 11
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
400
0.005
1.3
5.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 2
Hydraulic Length
Slope
*Velocity
Tc2
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 5
Hydraulic Length
Slope
*Velocity
Tc5-1
Hydraulic Length
Slope
*Velocity
Tc5-2
Hydraulic Length
Slope
*Velocity
Tc5-3
Total TcF
Tc Used
Lag Time
240
0.005
1.3
3.1
60
0.170
7.5
0.1
1950
0.005
1.3
25.0
28.2
30.0
0.30
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 8
Hydraulic Length
Slope
*Velocity
Tc8
Tc Used
Lag Time
1440
0.002
0.8
30.0
30.0
0.30
Area 12
Hydraulic Length
Slope
*Velocity
Tc12
Tc Used
Lag Time
1650
0.003
0.9
30.6
30.0
0.30
Area 3
Hydraulic Length
Slope
*Velocity
Tc3
Tc Used
Lag Time
510
0.005
1.3
6.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 6
Hydraulic Length
Slope
*Velocity
Tc6
Tc Used
Lag Time
1740
0.005
1.3
22.3
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area 9
Hydraulic Length
Slope
*Velocity
Tc9
Tc Used
Lag Time
1260
0.020
2.5
8.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 10
Hydraulic Length
Slope
*Velocity
Tc10
Tc Used
Lag Time
1050
0.005
1.3
13.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 13
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
1650
0.005
1.3
21.2
25.0
0.25
ft
ft/ft
fps
min
min
hr
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
600
0.004
1.2
8.3
0.14
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
2010
0.003
0.9
39.4
0.7
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD
tD
450
0.005
1.3
5.8
0.10
ft
ft/ft
fps
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
1290
0.008
1.5
14.3
0.24
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
150
0.003
0.9
2.8
0.05
ft
ft/ft
fps
min
hour
Hydrologic Element
FGP1
FGP7
Ppond2
SWTC2
FGP3
FGP8
Ppond4
SWCT1
FGP2
Ppond1
FGP6
SWTC3
FGP5
Ppond3
FGP4
FGP9
P-CP2
6
FS-1
5
1
Junction-A
Reach-1
3
Junction-B
Reach-2
Junction-C
Reach-3
Wetland
Reach-4
7
Junction-E
Reach-5
8
9
10
Junction-F
Reach-6
11
G-Mill River
13
2
4
Reach-7
Junction-G
Reach-8
12
42-inch Pipe
Location
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Pomeroy Terrace
Bridge St.
Eastern Ave.
Valley St.
William St.
Herny St.
Industrial Dr.
Lincoln Ave.
Fair St.
Marshall St.
Drainage Area
(acres)
35.9
3.4
39.3
39.3
8.3
0.7
9.0
9.0
4.9
4.9
1.0
5.9
0.6
54.7
1.6
0.4
56.7
38.7
95.5
25.0
17.7
17.7
17.7
5.2
22.9
22.9
22.9
22.9
143.4
143.4
10.0
153.4
153.4
19.4
11.1
9.7
193.5
193.5
2.4
195.9
82.9
26.9
10.4
10.4
37.2
37.2
34.7
154.9
Tc(min)
15
25
CN
78
74
15
15
79
79
15
82
15
95
15
80
20
15
76
87
25
66
30
20
81
71
15
67
15
83
30
15
15
70
85
75
15
70
25
20
15
85
86
86
30
83
2-Yr
34.6
2.2
4.4
4.4
8.4
0.7
1.8
1.8
5.8
1.4
2.1
2.5
0.6
7.6
1.3
0.7
7.9
12.9
7.8
22.5
9.9
9.9
9.3
2.2
11.2
10.5
10.5
6.5
4.9
4.9
12.6
12.9
10.2
8.7
15.5
7.7
38
37.6
1.3
38.8
96.9
35.8
15.1
14.5
50.3
30.7
34.6
152.3
100-Yr
142
10.2
17.9
17.9
33.4
2.8
13.1
13.1
20.9
9.9
5.2
12.8
2.4
42.7
5.5
2.1
47
93.4
47.5
83.1
54.1
54.1
50.9
15.3
63.1
58.2
58.2
37.4
72.7
70.7
43.6
74.2
68.9
49.4
50.3
35.7
157.5
154.9
7.6
160.9
314.8
112.2
47.6
45.5
157.7
98
119.9
502.2
95.1
4.9
39.3
54.7
9.0
14.6
7.8
114.1
117.0
116.0
5.8
1.4
112.3
115.0
36.2
4.4
114.1
119.0
7.7
7.6
113.2
114.0
112.85
9.1
1.8
112.7
117.0
23.7
4.9
115.1
116.5
44.7
17.9
114.8
117.0
116.0
10.2
3.5
112.7
115.0
68.4
10.8
115.1
119.0
19.7
19.4
113.4
114.0
112.85
16.8
4.8
113.3
117.0
43.8
12.4
115.9
116.5
76.6
24.6
115.5
117.0
116.0
13.7
5.6
113.0
115.0
95.2
13.7
116.0
119.0
28.7
28.3
113.6
114.0
112.85
23.2
8.1
113.8
117.0
71.7
23.6
116.5
116.5
103.9
30.6
116.1
117.0
116.0
16.8
7.4
113.3
115.0
118.9
15.5
116.8
119.0
35.7
35.3
113.7
114.0
112.85
28.7
10.9
114.2
117.0
93.2
39.8
116.5
116.5
138.5
47.5
116.7
117.0
116.0
20.9
9.9
113.6
115.0
150.8
17.9
117.8
119.0
43.0
42.7
113.8
114.0
112.85
36.2
13.1
114.8
117.0
119.6
72.7
116.5
116.5
Tc Min)
Lag Time
(Min)
13%
71
20
12
12.4
46%
86
20
12
0.7
14%
67
15
0.0162
5.3
51%
86
15
25.0
0.0391
9.6
38%
81
30
18
38.7
0.0605
2.7
7%
66
25
15
10.0
0.0156
4.4
45%
83
15
19.4
0.0303
3.3
17%
70
30
18
11.1
0.0174
6.3
56%
85
15
9.7
0.0151
3.4
35%
75
15
2.3
0.0037
0.1
6%
70
15
34.7
0.0543
11.7
34%
83
30
18
82.9
0.1296
45.1
54%
85
25
15
35.9
0.0561
12.2
34%
78
15
4.9
0.0076
2.7
55%
82
15
8.3
0.0129
2.0
24%
79
15
1.6
0.0025
0.2
15%
76
20
12
0.6
0.0009
0.3
52%
80
15
1.0
0.0016
0.9
92%
95
15
3.4
0.0053
0.6
19%
74
25
15
0.7
0.0011
0.3
49%
79
15
0.5
0.0007
0.3
63%
87
15
Total Area
Area
Impervious %Imp.
(acres)
Watershed
(acres)
(sq. mi.)
1
2
3
4
5
6
7
8
9
10
11
12
13
FGP1
FGP2
FGP3
FGP4
FGP5
FGP6
FGP7
FGP8
FGP9
17.7
0.0277
2.3
26.9
0.0420
5.2
0.0081
10.3
1500
0.005
1.3
19.2
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 4
Hydraulic Length
Slope
*Velocity
Tc4
Tc Used
Lag Time
990
0.005
1.3
12.7
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 7
Hydraulic Length
Slope
*Velocity
Tc7-1
Hydraulic Length
Slope
*Velocity
Tc7-2
Total Tc7
Tc Used
Lag Time
540
0.009
1.7
5.3
360
0.014
2.0
3.0
8.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 11
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
400
0.005
1.3
5.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 2
Hydraulic Length
Slope
*Velocity
Tc2
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 5
Hydraulic Length
Slope
*Velocity
Tc5-1
Hydraulic Length
Slope
*Velocity
Tc5-2
Hydraulic Length
Slope
*Velocity
Tc5-3
Total TcF
Tc Used
Lag Time
240
0.005
1.3
3.1
60
0.170
7.5
0.1
1950
0.005
1.3
25.0
28.2
30.0
0.30
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 8
Hydraulic Length
Slope
*Velocity
Tc8
Tc Used
Lag Time
1440
0.002
0.8
30.0
30.0
0.30
Area 12
Hydraulic Length
Slope
*Velocity
Tc12
Tc Used
Lag Time
1650
0.003
0.9
30.6
30.0
0.30
Area 3
Hydraulic Length
Slope
*Velocity
Tc3
Tc Used
Lag Time
510
0.005
1.3
6.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 6
Hydraulic Length
Slope
*Velocity
Tc6
Tc Used
Lag Time
1740
0.005
1.3
22.3
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area 9
Hydraulic Length
Slope
*Velocity
Tc9
Tc Used
Lag Time
1260
0.020
2.5
8.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 10
Hydraulic Length
Slope
*Velocity
Tc10
Tc Used
Lag Time
1050
0.005
1.3
13.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 13
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
1650
0.005
1.3
21.2
25.0
0.25
ft
ft/ft
fps
min
min
hr
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
600
0.004
1.2
8.3
0.14
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
2010
0.003
0.9
39.4
0.7
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD
tD
450
0.005
1.3
5.8
0.10
ft
ft/ft
fps
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
1290
0.008
1.5
14.3
0.24
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
150
0.003
0.9
2.8
0.05
ft
ft/ft
fps
min
hour
Hydrologic Element
FGP1
FGP7
Ppond2
SWTC2
FGP3
FGP8
Ppond4
SWCT1
FGP2
Ppond1
FGP6
SWTC3
FGP5
Ppond3
FGP4
FGP9
P-CP2
6
5
1
Junction-A
Reach-1
3
Junction-B
Reach-2
Junction-C
Reach-3
Wetland
Reach-4
7
Junction-E
Reach-5
8
9
10
Junction-F
Reach-6
11
G-Mill River
13
2
4
Reach-7
Junction-G
Reach-8
12
42-inch Pipe
Drainage Area
(acres)
35.9
3.4
39.3
39.3
Fairgrounds Site
8.3
Fairgrounds Site
0.7
9.0
9.0
Fairgrounds Site
4.9
4.9
Fairgrounds Site
1.0
5.9
Fairgrounds Site
0.6
54.7
Fairgrounds Site
1.6
Fairgrounds Site
0.4
56.7
38.7
Pomeroy Terrace
25.0
Bridge St.
17.7
17.7
17.7
Old Ferry Rd.
5.2
22.9
22.9
22.9
22.9
143.4
143.4
Eastern Ave.
10.0
153.4
153.4
Valley St.
19.4
William St.
11.1
Henry St.
9.7
193.5
193.5
2.4
195.9
Industrial Dr.
82.9
Lincoln Ave.
26.9
Fair St.
10.4
10.4
37.2
37.2
Marshall St.
34.7
154.9
Location
Fairgrounds Site
Fairgrounds Site
Tc(min)
15
25
CN
78
74
15
15
79
79
15
82
15
95
15
80
20
15
76
87
25
30
20
66
81
71
15
67
15
83
30
15
15
70
85
75
15
70
25
20
15
85
86
86
30
83
2-Yr
9.9
9.9
9.3
2.2
11.2
10.5
10.5
6.5
34.6
2.2
4.4
4.4
8.4
0.7
1.8
1.8
5.8
1.4
2.1
2.5
0.6
7.6
1.3
0.7
7.9
12.9
22.5
38.1
37
12.6
44
39.4
8.7
15.5
7.7
56.2
56
1.3
56.6
96.9
35.8
15.1
14.5
50.3
30.7
34.6
152.3
100-Yr
142
10.2
17.9
17.9
33.4
2.8
13.1
13.1
20.9
9.9
5.2
12.8
2.4
42.7
5.5
2.1
47
93.4
83.1
54.1
54.1
50.9
15.3
63.1
58.2
58.2
37.4
139.9
130.2
43.6
136
117.9
49.4
50.3
35.7
158.9
156.5
7.6
162.4
314.8
112.2
47.6
45.5
157.7
98
119.9
502.2
4.9
39.3
54.7
9.0
5.8
1.4
112.3
115.0
36.2
4.4
114.1
119.0
7.7
7.6
113.2
114.0
112.85
9.1
1.8
112.7
117.0
38.1
6.3
115.2
116.5
10.2
3.5
112.7
115.0
68.4
10.8
115.1
119.0
19.7
19.4
113.4
114.0
112.85
16.8
4.8
113.3
117.0
88.2
13.6
116.1
116.5
13.7
5.6
113.0
115.0
95.2
13.7
116.0
119.0
28.7
28.3
113.6
114.0
112.85
23.2
8.1
113.8
117.0
137.3
35.6
116.5
116.5
16.8
7.4
113.3
115.0
118.9
15.5
119.6
119.0
35.7
35.3
113.7
114.0
112.85
28.7
10.9
114.2
117.0
177.9
70.3
116.5
116.5
20.9
9.9
113.6
115.0
150.8
17.9
119.9
119.0
43.0
42.7
113.8
114.0
112.85
36.2
13.1
114.8
117.0
232.3
139.9
116.6
116.5
Tc Min)
Lag Time
(Min)
13%
71
20
12
12.4
46%
86
20
12
0.7
14%
67
15
0.0162
5.3
51%
86
15
25.0
0.0391
9.6
38%
81
30
18
38.7
0.0605
2.7
7%
66
25
15
10.0
0.0156
4.4
45%
83
15
19.4
0.0303
3.3
17%
70
30
18
11.1
0.0174
6.3
56%
85
15
9.7
0.0151
3.4
35%
75
15
2.3
0.0037
0.1
6%
70
15
34.7
0.0543
11.7
34%
83
30
18
82.9
0.1296
45.1
54%
85
25
15
35.9
0.0561
12.2
34%
78
15
4.9
0.0076
2.7
55%
82
15
8.3
0.0129
2.0
24%
79
15
1.6
0.0025
0.2
15%
76
20
12
0.6
0.0009
0.3
52%
80
15
1.0
0.0016
0.9
92%
95
15
3.4
0.0053
0.6
19%
74
25
15
0.7
0.0011
0.3
49%
79
15
0.5
0.0007
0.3
63%
87
15
Total Area
Area
Impervious %Imp.
(acres)
Watershed
(acres)
(sq. mi.)
1
2
3
4
5
6
7
8
9
10
11
12
13
FGP1
FGP2
FGP3
FGP4
FGP5
FGP6
FGP7
FGP8
FGP9
17.7
0.0277
2.3
26.9
0.0420
5.2
0.0081
10.3
1500
0.005
1.3
19.2
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 4
Hydraulic Length
Slope
*Velocity
Tc4
Tc Used
Lag Time
990
0.005
1.3
12.7
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 7
Hydraulic Length
Slope
*Velocity
Tc7-1
Hydraulic Length
Slope
*Velocity
Tc7-2
Total Tc7
Tc Used
Lag Time
540
0.009
1.7
5.3
360
0.014
2.0
3.0
8.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 11
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
400
0.005
1.3
5.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 2
Hydraulic Length
Slope
*Velocity
Tc2
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 5
Hydraulic Length
Slope
*Velocity
Tc5-1
Hydraulic Length
Slope
*Velocity
Tc5-2
Hydraulic Length
Slope
*Velocity
Tc5-3
Total TcF
Tc Used
Lag Time
240
0.005
1.3
3.1
60
0.170
7.5
0.1
1950
0.005
1.3
25.0
28.2
30.0
0.30
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 8
Hydraulic Length
Slope
*Velocity
Tc8
Tc Used
Lag Time
1440
0.002
0.8
30.0
30.0
0.30
Area 12
Hydraulic Length
Slope
*Velocity
Tc12
Tc Used
Lag Time
1650
0.003
0.9
30.6
30.0
0.30
Area 3
Hydraulic Length
Slope
*Velocity
Tc3
Tc Used
Lag Time
510
0.005
1.3
6.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 6
Hydraulic Length
Slope
*Velocity
Tc6
Tc Used
Lag Time
1740
0.005
1.3
22.3
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area 9
Hydraulic Length
Slope
*Velocity
Tc9
Tc Used
Lag Time
1260
0.020
2.5
8.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 10
Hydraulic Length
Slope
*Velocity
Tc10
Tc Used
Lag Time
1050
0.005
1.3
13.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 13
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
1650
0.005
1.3
21.2
25.0
0.25
ft
ft/ft
fps
min
min
hr
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
600
0.004
1.2
8.3
0.14
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
2010
0.003
0.9
39.4
0.7
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD
tD
450
0.005
1.3
5.8
0.10
ft
ft/ft
fps
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
1290
0.008
1.5
14.3
0.24
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
150
0.003
0.9
2.8
0.05
ft
ft/ft
fps
min
hour
tG
Hydraulic Length
Slope
*Velocity
tD
tD
330
0.005
1.3
4.2
0.07
ft
ft/ft
fps
min
hour
tH
Hydraulic Length
Slope
*Velocity
tD
tD
2820
0.005
1.3
36.2
0.60
ft
ft/ft
fps
min
hour
Hydrologic Element
2
1
Junction-A
Reach-1
3
Junction-B
Reach-2
4
Junction-C
Reach-3
6
5
Wetland
Reach-4
7
Junction-E
Reach-5
8
9
10
Junction-F
Reach-6
11
G-Mill River
13
12
42-inch Pipe
FGP1
FGP7
Ppond2
SWTC2
FGP3
FGP8
Ppond4
SWCT1
FGP2
Ppond1
FGP6
SWTC3
FGP5
Ppond3
FGP4
FGP9
P-CP2
Sink-1
Flood Storage Routing
P-Pond1 (Inflow)
P-Pond1 (Outflow)
Maximum Stage (ft.)
Pond Surface Elevation (ft.)
P-Pond2 (Inflow)
P-Pond2 (Outflow)
Maximum Stage (ft.)
Pond Surface Elevation (ft.)
P-Pond3 (Inflow)
P-Pond3 (Outflow)
Maximum Stage (ft.)
Pond Surface Elevation (ft.)
Spillway Elevation (ft.)
P-Pond4 (Inflow)
P-Pond4 (Outflow)
Maximum Stage (ft.)
Spillway Elevation (ft.)
Location
Lincoln Ave.
Bridge St.
Old Ferry Rd.
Fair St.
Pomeroy Terrace
Eastern Ave.
Valley St.
William St.
Herny St.
Industrial Dr.
Marshall St.
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Drainage Area
(acres)
26.9
17.7
44.6
44.6
5.2
49.8
49.8
10.4
60.1
60.1
38.7
25.0
123.9
123.9
10.0
133.8
133.8
19.4
11.1
9.7
174.0
174.0
2.4
176.4
82.9
34.7
117.7
35.9
3.4
39.3
39.3
8.3
0.7
9.0
9.0
4.9
4.9
1.0
5.9
0.6
54.7
1.6
0.4
56.7
56.7
4.9
39.3
54.7
9.0
Tc(min)
20
20
CN
86
71
15
67
15
86
25
30
66
81
15
83
30
15
15
70
85
75
15
70
25
30
85
83
15
25
78
74
15
15
79
79
15
82
15
95
15
80
20
15
76
87
2-Yr
35.8
9.9
45.7
43
2.2
45
41.5
15.1
49.7
32.9
12.9
22.5
7.8
7.8
12.6
13.2
10.6
8.7
15.5
7.7
38.2
37.9
1.3
39.1
96.9
34.6
131.5
34.6
2.2
4.4
4.4
8.4
0.7
1.8
1.8
5.8
1.4
2.1
2.5
0.6
7.6
1.3
0.7
7.9
7.9
5.8
1.4
112.3
115.0
36.2
4.4
114.1
119.0
7.7
7.6
113.2
114.0
112.85
9.1
1.8
112.7
117.0
10.2
3.5
112.7
115.0
68.4
10.8
115.1
119.0
19.7
19.4
113.4
114.0
112.85
16.8
4.8
113.3
117.0
13.7
5.6
113.0
115.0
95.2
13.7
116.0
119.0
28.7
28.3
113.6
114.0
112.85
23.2
8.1
113.8
117.0
16.8
7.4
113.3
115.0
118.9
15.5
119.6
119.0
35.7
35.3
113.7
114.0
112.85
28.7
10.9
114.2
117.0
100-Yr
112.2
54.1
166.3
157.3
15.3
169.4
154.9
47.6
183.3
122.2
93.4
83.1
195.0
183.9
43.6
190.3
166.4
49.4
50.3
35.7
187.5
186.6
7.6
187.6
314.8
119.9
430.5
142.0
10.2
17.9
17.9
33.4
2.8
13.1
13.1
20.9
9.9
5.2
12.8
2.4
42.7
5.5
2.1
47.0
47.0
20.9
9.9
113.6
115.0
150.8
17.9
119.9
119.0
43.0
42.7
113.8
114.0
112.85
36.2
13.1
114.8
117.0
Tc Min)
Lag Time
(Min)
13%
71
20
12
12.4
46%
86
20
12
0.7
14%
67
15
0.0162
5.3
51%
86
15
25.0
0.0391
9.6
38%
81
30
18
38.7
0.0605
2.7
7%
66
25
15
10.0
0.0156
4.4
45%
83
15
19.4
0.0303
3.3
17%
70
30
18
11.1
0.0174
6.3
56%
85
15
9.7
0.0151
3.4
35%
75
15
2.3
0.0037
0.1
6%
70
15
34.7
0.0543
11.7
34%
83
30
18
82.9
0.1296
45.1
54%
85
25
15
35.9
0.0561
12.2
34%
78
15
4.9
0.0076
2.7
55%
82
15
8.3
0.0129
2.0
24%
79
15
1.6
0.0025
0.2
15%
76
20
12
0.6
0.0009
0.3
52%
80
15
1.0
0.0016
0.9
92%
95
15
3.4
0.0053
0.6
19%
74
25
15
0.7
0.0011
0.3
49%
79
15
0.5
0.0007
0.3
63%
87
15
Total Area
Area
Impervious %Imp.
(acres)
Watershed
(acres)
(sq. mi.)
1
2
3
4
5
6
7
8
9
10
11
12
13
FGP1
FGP2
FGP3
FGP4
FGP5
FGP6
FGP7
FGP8
FGP9
17.7
0.0277
2.3
26.9
0.0420
5.2
0.0081
10.3
1500
0.005
1.3
19.2
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 4
Hydraulic Length
Slope
*Velocity
Tc4
Tc Used
Lag Time
990
0.005
1.3
12.7
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 7
Hydraulic Length
Slope
*Velocity
Tc7-1
Hydraulic Length
Slope
*Velocity
Tc7-2
Total Tc7
Tc Used
Lag Time
540
0.009
1.7
5.3
360
0.014
2.0
3.0
8.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 11
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
400
0.005
1.3
5.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 2
Hydraulic Length
Slope
*Velocity
Tc2
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 5
Hydraulic Length
Slope
*Velocity
Tc5-1
Hydraulic Length
Slope
*Velocity
Tc5-2
Hydraulic Length
Slope
*Velocity
Tc5-3
Total TcF
Tc Used
Lag Time
240
0.005
1.3
3.1
60
0.170
7.5
0.1
1950
0.005
1.3
25.0
28.2
30.0
0.30
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 8
Hydraulic Length
Slope
*Velocity
Tc8
Tc Used
Lag Time
1440
0.002
0.8
30.0
30.0
0.30
Area 12
Hydraulic Length
Slope
*Velocity
Tc12
Tc Used
Lag Time
1650
0.003
0.9
30.6
30.0
0.30
Area 3
Hydraulic Length
Slope
*Velocity
Tc3
Tc Used
Lag Time
510
0.005
1.3
6.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 6
Hydraulic Length
Slope
*Velocity
Tc6
Tc Used
Lag Time
1740
0.005
1.3
22.3
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area 9
Hydraulic Length
Slope
*Velocity
Tc9
Tc Used
Lag Time
1260
0.020
2.5
8.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 10
Hydraulic Length
Slope
*Velocity
Tc10
Tc Used
Lag Time
1050
0.005
1.3
13.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 13
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
1650
0.005
1.3
21.2
25.0
0.25
ft
ft/ft
fps
min
min
hr
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
600
0.004
1.2
8.3
0.14
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
2010
0.003
0.9
39.4
0.7
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD
tD
450
0.005
1.3
5.8
0.10
ft
ft/ft
fps
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
1290
0.008
1.5
14.3
0.24
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
150
0.003
0.9
2.8
0.05
ft
ft/ft
fps
min
hour
Hydrologic Element
6
5
4
Junction-A
Reach-1
Junction-B
Reach-2
Junction-C
Reach-3
Wetland
Reach-4
7
Junction-E
Reach-5
8
Junction-E2
9
10
Junction-F
Reach-6
11
G-Mill River
13
12
42-inch Pipe
FGP1
FGP7
Ppond2
SWTC2
FGP3
FGP8
Ppond4
SWCT1
FGP2
Ppond1
FGP6
SWTC3
FGP5
Ppond3
FGP4
FGP9
P-CP2
2
1
3
Sink-1
Location
Pomeroy Terrace
Fair St.
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Industrial Dr.
Marshall St.
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Fairgrounds Site
Lincoln Ave.
Bridge St.
Old Ferry Rd.
Drainage Area
(acres)
38.7
25.0
10.4
0.0
0.0
0.0
0.0
10.4
10.4
74.1
74.1
10.0
84.1
84.1
19.4
103.5
11.1
9.7
124.2
124.2
2.4
126.6
82.9
34.7
117.7
35.9
3.4
39.3
39.3
8.3
0.7
9.0
9.0
4.9
4.9
1.0
5.9
0.6
54.7
1.6
0.4
56.7
26.9
17.7
5.2
106.5
Tc(min)
25
30
15
CN
66
81
86
15
83
30
70
15
15
85
75
15
70
25
30
82
83
20
20
15
86
71
67
2-Yr
12.9
22.5
15.1
0
0
0
0
15.1
8.2
3.7
3.7
12.6
13
10.4
8.7
19.1
15.5
7.7
38.1
37.7
1.3
38.9
96.9
34.6
131.5
34.6
2.2
4.4
4.4
8.4
0.7
1.8
1.8
5.8
1.4
2.1
2.5
0.6
7.6
1.3
0.7
7.9
35.8
9.9
2.2
49.9
100-Yr
93.4
83.1
47.6
0
0
0
0
47.6
26.3
44.7
42.3
43.6
47.4
41.9
49.4
87.4
50.3
35.7
158.7
156.3
7.6
162.2
314.8
119.9
430.5
142
10.2
17.9
17.9
33.4
2.8
13.1
13.1
20.9
9.9
5.2
12.8
2.4
42.7
5.5
2.1
47
112.2
54.1
15.3
221.7
4.9
39.3
54.7
9.0
5.8
1.4
112.3
115.0
36.2
4.4
114.1
119.0
7.7
7.6
113.2
114.0
112.85
9.1
1.8
112.7
117.0
10.2
3.5
112.7
115.0
68.4
10.8
115.1
119.0
19.7
19.4
113.4
114.0
112.85
16.8
4.8
113.3
117.0
13.7
5.6
113.0
115.0
95.2
13.7
116.0
119.0
28.7
28.3
113.6
114.0
112.85
23.2
8.1
113.8
117.0
16.8
7.4
113.3
115.0
118.9
15.5
119.6
119.0
35.7
35.3
113.7
114.0
112.85
28.7
10.9
114.2
117.0
20.9
9.9
113.6
115.0
150.8
17.9
119.9
119.0
43.0
42.7
113.8
114.0
112.85
36.2
13.1
114.8
117.0
Tc Min)
Lag Time
(Min)
13%
71
20
12
12.4
46%
86
20
12
0.7
14%
67
15
0.0162
5.3
51%
86
15
25.0
0.0391
9.6
38%
81
30
18
38.7
0.0605
2.7
7%
66
25
15
10.0
0.0156
4.4
45%
83
15
19.4
0.0303
3.3
17%
70
30
18
11.1
0.0174
6.3
56%
85
15
9.7
0.0151
3.4
35%
75
15
2.3
0.0037
0.1
6%
70
15
34.7
0.0543
11.7
34%
83
30
18
82.9
0.1296
21.0
25%
82
25
15
35.9
0.0561
12.2
34%
78
15
4.9
0.0076
2.7
55%
82
15
8.3
0.0129
2.0
24%
79
15
1.6
0.0025
0.2
15%
76
20
12
0.6
0.0009
0.3
52%
80
15
1.0
0.0016
0.9
92%
95
15
3.4
0.0053
0.6
19%
74
25
15
0.7
0.0011
0.3
49%
79
15
0.5
0.0007
0.3
63%
87
15
Total Area
Area
Impervious %Imp.
(acres)
Watershed
(acres)
(sq. mi.)
1
2
3
4
5
6
7
8
9
10
11
12
13
FGP1
FGP2
FGP3
FGP4
FGP5
FGP6
FGP7
FGP8
FGP9
17.7
0.0277
2.3
26.9
0.0420
5.2
0.0081
10.3
1500
0.005
1.3
19.2
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 4
Hydraulic Length
Slope
*Velocity
Tc4
Tc Used
Lag Time
990
0.005
1.3
12.7
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 7
Hydraulic Length
Slope
*Velocity
Tc7-1
Hydraulic Length
Slope
*Velocity
Tc7-2
Total Tc7
Tc Used
Lag Time
540
0.009
1.7
5.3
360
0.014
2.0
3.0
8.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 11
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
400
0.005
1.3
5.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 2
Hydraulic Length
Slope
*Velocity
Tc2
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area 5
Hydraulic Length
Slope
*Velocity
Tc5-1
Hydraulic Length
Slope
*Velocity
Tc5-2
Hydraulic Length
Slope
*Velocity
Tc5-3
Total TcF
Tc Used
Lag Time
240
0.005
1.3
3.1
60
0.170
7.5
0.1
1950
0.005
1.3
25.0
28.2
30.0
0.30
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area 8
Hydraulic Length
Slope
*Velocity
Tc8
Tc Used
Lag Time
1440
0.002
0.8
30.0
30.0
0.30
Area 12
Hydraulic Length
Slope
*Velocity
Tc12
Tc Used
Lag Time
1650
0.003
0.9
30.6
30.0
0.30
Area 3
Hydraulic Length
Slope
*Velocity
Tc3
Tc Used
Lag Time
510
0.005
1.3
6.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area 6
Hydraulic Length
Slope
*Velocity
Tc6
Tc Used
Lag Time
1740
0.005
1.3
22.3
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area 9
Hydraulic Length
Slope
*Velocity
Tc9
Tc Used
Lag Time
1260
0.020
2.5
8.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 10
Hydraulic Length
Slope
*Velocity
Tc10
Tc Used
Lag Time
1050
0.005
1.3
13.5
15.0
0.15
ft
ft/ft
fps
min
min
hr
ft
ft/ft
fps
min
min
hr
Area 13
Hydraulic Length
Slope
*Velocity
Tc11
Tc Used
Lag Time
1650
0.005
1.3
21.2
25.0
0.25
ft
ft/ft
fps
min
min
hr
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
600
0.004
1.2
8.3
0.14
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
2010
0.003
0.9
39.4
0.7
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD
tD
450
0.005
1.3
5.8
0.10
ft
ft/ft
fps
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
1290
0.008
1.5
14.3
0.24
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
150
0.003
0.9
2.8
0.05
ft
ft/ft
fps
min
hour
Location
Bridge Rd.
Strawberry Hill Rd.
Straw Avenue
Drainage
Area (acres)
27.1
54.8
27.7
73.0
18.2
113.9
6.8
3.1
31.0
Tc
15
CN
72
15
67
15
66
15
15
25
77
74
78
15
15
15
72
62
61
15
66
15
60
20
54
25
15
64
68
15
73
15
20
76
74
15
15
65
61
15
15
15
15
25
15
73
74
70
73
67
60
15
20
20
73
74
82
15
84
15
68
15
86
113.9
157.8
20.7
17.0
6.3
180.5
14.6
14.6
Depot Avenue
Locust St.
North Main St.
South Main St.
Federal St.
Milton St.
Elm St.
48-inch Pipe
Washington St.
8.1
208.6
28.1
241.6
23.0
10.0
257.9
16.3
49.3
307.3
26.4
23.0
374.3
49.4
17.6
459.1
478.1
509.5
535.0
17.0
8.5
31.4
19.0
68.4
16.4
535.0
4.4
76.5
23.2
4.4
549.2
14.3
565.2
16.0
585.1
19.8
27.5
27.5
689.1
2-Yr
17.5
27.9
11.8
32.4
7.1
59.3
6.2
2.3
25.5
59.3
27
186.9
187.5
29.4
13.4
4.1
1.3
33.8
5.7
5.7
3.3
180.9
186
1.5
34.6
1.5
42.0
6.2
4.7
47.2
11.3
38
74.7
22.5
16
89.3
17.5
3.7
106.9
93.2
97.6
101.7
11.8
6.3
17.5
13.2
25.1
3
73.8
29.0
53.0
16.1
4.8
76.7
18.9
76.6
7.6
80.3
28.8
27.2
27.2
26.9
148.2
153.55
123.6
10-Yr
37.5
63.4
29
74.2
18
124.5
11.8
4.8
47.2
124.5
51.8
188.1
187.5
65.2
28.7
13
4.5
83
14.5
14.5
6
181.9
186
5.4
89
9.4
108.7
17.5
11.2
118.0
23.7
74.1
171.5
43.9
32.3
209.3
46.1
12.6
254.2
221.7
230.2
237.8
24.7
13
39.2
27.6
62.5
10.9
157.4
82.5
111.2
32.6
8.4
161.1
32
156.7
17.9
162.4
47.3
82.2
82.2
75.7
150.3
153.55
261
25-Yr
55
95.5
45.3
112.2
28.5
181
16.5
6.9
65.1
181
55.4
188.2
187.5
80.5
42.1
21.5
7.5
115.2
22.9
22.9
7.8
182.9
186
9.2
128.9
19.1
165
28.1
17.2
183.7
34.4
104.8
262.7
61.9
46.3
320.8
73.7
21
390.6
340
353.3
364.1
35.8
18.6
58.8
40.1
96.2
18.6
239.2
127.9
161.4
46.7
11.2
243.2
42.4
235
27.5
242.7
61.9
126.3
126.3
104.3
152.4
153.55
376.8
50-Yr
70.8
124.7
60.3
146.9
38.2
232.6
20.6
8.7
80.9
232.6
59
188.4
187.5
98.7
54.2
29.9
10.5
149.6
30.7
30.7
9.2
183.8
186
13
171.6
29.2
222.3
37.9
22.7
247.7
44.1
132.8
349.6
77.9
58.7
425.7
99.6
29.5
518.1
450.5
467.3
481.8
45.8
23.7
76.6
51.3
127.2
26.2
315.7
169.6
206.6
59.2
13.7
320.3
51.4
308.5
36.4
317.6
74.4
167
167
150.2
154.0
153.55
485.6
100-Yr
92.5
165.1
81.4
195
51.8
304.1
26.2
11.3
102.5
304.1
64.9
188.5
187.5
120.4
70.8
41.9
14.9
192.8
41.6
41.6
10.8
185.1
186
18.5
229.3
44.6
295.5
51.9
30.4
333.3
57.3
170.9
471.6
99.7
75.7
573.1
136.2
41.7
697.6
607.2
626.8
646.4
59.5
30.6
101.3
66.7
170.3
37.4
423.7
227
268.3
76.4
17
429.2
63.4
412.1
48.7
423.1
91.1
223
223
210
154.8
153.55
664.3
Existing Conditions
Total Area
Watershed (acres)
A
27.0
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
BB
CC
DD
EE
Area
(sq. mi.)
Tc
Lag Time
(Min)
0.0423
6.6
0.24
72
15
27.7
0.0433
3.7
0.13
67
15
18.1
0.0284
1.8
0.10
66
15
6.8
0.0106
1.1
0.16
77
15
3.1
0.0049
1.1
0.35
74
15
30.9
0.0484
8.6
0.28
78
25
15
20.7
0.0324
6.3
0.30
72
15
17.0
0.0265
2.0
0.12
62
15
6.3
0.0098
0.6
0.09
61
15
14.6
0.0228
3.6
0.25
66
15
8.1
0.0127
0.4
0.05
60
15
28.1
0.0439
4.9
0.17
54
20
12
23.0
0.0359
9.0
0.39
64
25
15
23.0
0.0359
13.6
0.59
74
20
12
10.0
0.0156
2.2
0.22
68
15
16.3
0.0255
8.3
0.51
73
15
26.4
0.0412
15.7
0.59
76
15
17.6
0.0275
0.5
0.03
61
15
49.4
0.0772
2.9
0.06
65
15
16.4
0.0257
2.5
0.15
60
15
68.4
0.1069
14.5
0.21
67
25
15
19.0
0.0297
5.1
0.27
73
15
31.4
0.0490
14.8
0.47
70
15
17.0
0.0265
5.4
0.32
73
15
8.5
0.0133
1.4
0.16
74
15
23.2
0.0362
7.4
0.32
74
20
12
14.3
0.0223
7.8
0.54
84
15
19.8
0.0310
10.0
0.51
86
15
76.5
0.1195
19.1
0.25
73
15
4.4
0.0068
2.2
0.51
82
20
12
16.0
0.0250
1.0
0.06
68
15.00
Existing Conditions
Area A
Hydraulic Length
Slope
*Velocity
TcA1
Hydraulic Length
Slope
*Velocity
TcA2
Hydraulic Length
Slope
*Velocity
TcA3
Total TcA
Tc Used
Lag Time
840
0.027
2.7
5.2
450
0.044
3.7
2.0
780
0.013
2.0
6.5
13.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area B
Hydraulic Length
Slope
*Velocity
TcB1
Hydraulic Length
Slope
*Velocity
TcB2
Total TcB
Tc Used
Lag Time
840
0.040
3.5
4.0
390
0.026
2.8
2.3
6.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area D
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
660
0.091
5.3
2.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area E
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
510
0.078
4.8
1.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area H
Hydraulic Length
Slope
*Velocity
TcH1
Hydraulic Length
Slope
*Velocity
TcH2
Total TcH
Tc Used
Lag Time
360
0.028
2.9
2.1
420
0.024
2.7
2.6
4.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area J
Hydraulic Length
Slope
*Velocity
TcJ1
Hydraulic Length
Slope
*Velocity
TcJ2
Hydraulic Length
Slope
*Velocity
TcJ3
Hydraulic Length
Slope
*Velocity
TcJ4
Total TcJ
Tc Used
Lag Time
210
0.143
5.8
0.6
570
0.018
2.4
4.0
60
0.330
9.0
0.1
300
0.005
1.1
4.5
9.2
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area M
Hydraulic Length
Slope
*Velocity
TcM1
Tc Used
Lag Time
2250
0.009
1.7
22.1
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area P
Hydraulic Length
Slope
*Velocity
TcP1
Tc Used
Lag Time
1050
0.038
3.5
5.0
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area R
Hydraulic Length
Slope
*Velocity
TcR1
Hydraulic Length
Slope
*Velocity
TcR2
Total TcR
Tc Used
Lag Time
510
0.078
4.2
2.0
450
0.022
2.2
3.4
5.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area U
Hydraulic Length
Slope
*Velocity
TcU1
Hydraulic Length
Slope
*Velocity
TcU2
Total TcU
Tc Used
Lag Time
1500
0.007
1.5
16.7
1380
0.073
4.2
5.5
22.1
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area X
Hydraulic Length
Slope
*Velocity
TcX1
Tc Used
Lag Time
1740
0.014
2.1
13.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area C
Hydraulic Length
Slope
*Velocity
TcC1
Hydraulic Length
Slope
*Velocity
TcC2
Total TcC
Tc Used
Lag Time
300
0.033
3.1
1.6
810
0.031
2.6
5.2
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area F
Hydraulic Length
Slope
*Velocity
TcF1
Hydraulic Length
Slope
*Velocity
TcF2
Hydraulic Length
Slope
*Velocity
TcF3
Total TcF
Tc Used
Lag Time
510
0.078
4.6
1.8
2400
0.017
2.2
18.2
150
0.200
7.0
0.4
20.4
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area K
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
200
0.167
7.5
0.4
510
0.029
0.9
10.0
10.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area N
Hydraulic Length
Slope
*Velocity
TcN1
Hydraulic Length
Slope
*Velocity
TcN2
Total TcN
Tc Used
Lag Time
1380
0.015
2.1
11.0
1200
0.049
3.7
5.4
16.4
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Q
Hydraulic Length
Slope
*Velocity
TcQ1
Hydraulic Length
Slope
*Velocity
TcQ2
Total TcQ
Tc Used
Lag Time
1110
0.018
2.4
7.7
720
0.028
3.0
4.0
11.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area S
Hydraulic Length
Slope
*Velocity
TcS1
Hydraulic Length
Slope
*Velocity
TcS2
Hydraulic Length
Slope
*Velocity
TcS3
Total TcF
Tc Used
Lag Time
420
0.007
1.5
4.7
210
0.238
2.4
1.5
960
0.031
2.6
6.2
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area V
Hydraulic Length
Slope
*Velocity
TcV1
Hydraulic Length
Slope
*Velocity
TcV2
Total TcV
Tc Used
Lag Time
450
0.089
1.5
5.0
600
0.050
3.4
2.9
7.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area G
Hydraulic Length
Slope
*Velocity
TcG1
Hydraulic Length
Slope
*Velocity
TcG2
Total TcG
Tc Used
Lag Time
300
0.067
4.5
1.1
870
0.023
2.5
5.8
6.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area I
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
510
0.078
4.4
1.9
300
0.033
3.3
1.5
3.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area L
Hydraulic Length
Slope
*Velocity
TcL1
Hydraulic Length
Slope
*Velocity
TcL2
Hydraulic Length
Slope
*Velocity
TcL3
Hydraulic Length
Slope
*Velocity
TcL4
Total TcL
Tc Used
Lag Time
450
0.044
1.2
6.3
360
0.028
0.9
7.1
420
0.048
1.3
5.4
90
0.440
3.5
0.4
19.1
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area O
Hydraulic Length
Slope
*Velocity
TcO1
Hydraulic Length
Slope
*Velocity
TcO2
Total TcO
Tc Used
Lag Time
240
0.125
6.0
0.7
810
0.012
1.7
7.9
8.6
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area T
Hydraulic Length
Slope
*Velocity
TcT1
Tc Used
Lag Time
750
0.067
1.2
10.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area W
Hydraulic Length
Slope
*Velocity
TcW1
Hydraulic Length
Slope
*Velocity
TcW2
Total TcW
Tc Used
Lag Time
360
0.056
4.5
1.3
1110
0.049
3.4
5.4
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Y
Hydraulic Length
Slope
*Velocity
TcY1
Tc Used
Lag Time
150
0.133
1.6
1.6
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area Z
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area AA
Hydraulic Length
Slope
*Velocity
TcAA1
Tc Used
Lag Time
570
0.088
5.0
1.9
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area BB
Hydraulic Length
Slope
*Velocity
TcBB1
Hydraulic Length
Slope
*Velocity
TcBB2
Total TcBB
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area CC
Hydraulic Length
Slope
*Velocity
TcCC1
Hydraulic Length
Slope
*Velocity
TcCC2
Total TcCC
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area DD
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
630
0.032
3.1
3.4
1200
0.005
1.5
13.3
16.7
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area EE
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
240
0.250
2.5
1.6
960
0.010
1.5
10.7
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Existing Conditions
tA
Hydraulic Length
Slope
*Velocity
tA
tA
540
0.005
1.5
6.0
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
240
0.005
1.5
2.7
0.04
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
810
0.025
2.7
5.0
0.1
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD1
Hydraulic Length
Slope
*Velocity
tD2
Total tD
tD
300
0.025
2.7
1.9
280
0.005
1.2
3.9
5.7
0.10
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
450
0.011
1.6
4.7
0.08
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
900
0.067
4.5
3.3
0.06
ft
ft/ft
fps
min
hour
450
0.033
3.2
2.3
0.04
ft
ft/ft
fps
min
hour
tI
Hydraulic Length
Slope
*Velocity
tI1
Hydraulic Length
Slope
*Velocity
tI2
Total tD
tD
420
0.012
1.5
4.7
90
0.600
12.0
0.1
4.8
0.08
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tG
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tH
Hydraulic Length
Slope
*Velocity
tH
tH
tJ
Hydraulic Length
Slope
*Velocity
tJ
tJ
300
0.100
5.0
1.0
0.02
ft
ft/ft
fps
min
hour
tK
Hydraulic Length
Slope
*Velocity
tK
tK
1200
0.033
2.6
7.7
0.13
ft
ft/ft
fps
min
hour
tL
Hydraulic Length
Slope
*Velocity
tL
tL
360
0.028
2.5
2.4
0.04
ft
ft/ft
fps
min
hour
tM
Hydraulic Length
Slope
*Velocity
tM
tM
720
0.014
1.8
6.7
0.11
ft
ft/ft
fps
min
hour
tN
Hydraulic Length
Slope
*Velocity
tN
tN
900
0.011
1.6
9.4
0.16
ft
ft/ft
fps
min
hour
tO
Hydraulic Length
Slope
*Velocity
tO
tO
1500
0.007
1.2
20.8
0.35
ft
ft/ft
fps
min
hour
tO1
Hydraulic Length
Slope
*Velocity
tO1
tO1
150
0.005
1.1
2.3
0.04
ft
ft/ft
fps
min
hour
tP
Hydraulic Length
Slope
*Velocity
tP
tP
300
0.017
2.0
2.5
0.04
ft
ft/ft
fps
min
hour
tQ
Hydraulic Length
Slope
*Velocity
tQ
tQ
450
0.060
3.7
2.0
0.03
ft
ft/ft
fps
min
hour
tR
Hydraulic Length
Slope
*Velocity
tR
tR
1650
0.006
1.3
21.2
0.35
ft
ft/ft
fps
min
hour
tS
Hydraulic Length
Slope
*Velocity
tS
tS
900
0.011
2.2
6.8
0.11
ft
ft/ft
fps
min
hour
tT
Hydraulic Length
Slope
*Velocity
tT
tT
1200
0.005
1.1
18.2
0.30
ft
ft/ft
fps
min
hour
tZ
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
Location
Bridge Rd.
Strawberry Hill Rd.
Straw Avenue
Depot Avenue
Locust St.
North Main St.
Elm St.
Hospital Rd.
North Elm St.
48-inch Pipe
Washington St.
Federal St.
Milton St.
Elm St.
Drainage
Area (acres)
20.7
27.1
27.1
27.7
27.7
54.8
54.8
18.2
73.0
73.0
6.8
3.1
31.0
113.9
113.9
113.9
134.6
134.6
17.0
17.0
6.3
23.2
23.2
14.6
14.6
14.6
8.1
180.5
180.5
28.1
208.6
208.6
23.0
23.0
10.0
241.6
241.6
16.3
257.9
26.4
23.0
49.3
307.3
307.3
49.4
17.6
374.3
374.3
68.4
16.4
459.1
459.1
19.0
478.1
478.1
31.4
509.5
509.5
17.0
17.0
8.5
535.0
535.0
535.0
14.3
549.2
549.2
16.0
565.2
19.8
585.1
76.5
23.2
4.4
4.4
4.4
27.5
27.5
689.0
113.9
14.6
27.5
Tc
15
15
CN
73
73
15
68
15
66
15
15
25
77
75
79
15
67
15
62
15
67
15
60
20
54
25
66
15
68
15
80
15
20
76
78
15
15
65
61
25
15
68
60
15
73
15
70
15
73
15
74
15
84
15
68
15
87
15
20
20
74
74
84
2-Yr
14.4
18.8
17.8
12.2
12.0
29.5
28.1
7.1
33.9
32.6
6.2
2.3
27.0
62.1
30.9
30.2
33.6
32.7
7.4
7.1
1.5
8.6
8.2
6.3
3.5
3.5
1.5
39.1
38.7
1.5
39.7
39.7
7.7
7.2
4.7
47.5
47.4
17.6
55.6
22.5
20.5
42.5
86.2
84.6
17.5
3.7
101.4
96.0
27.7
3.0
120.0
101.4
13.2
104.5
104.6
17.5
109.1
108.8
11.8
12.0
6.3
113.2
79.6
78.8
18.9
82.0
79.3
7.6
80.8
30.1
84.6
57.0
16.1
5.3
34.8
30.7
33.7
33.2
128.7
62.1
30.9
187.1
187.5
6.3
3.5
181.0
186.0
33.7
33.2
148.4
153.55
10-Yr
30.1
39.4
36.2
29.9
30.2
66.1
61.7
18.0
76.7
72.9
11.8
4.8
49.0
128.4
52.1
52.0
65.9
64.1
17.9
17.6
4.8
22.4
20.8
15.4
6.2
6.2
5.4
89.8
88.3
9.4
95.6
94.9
19.8
18.3
11.2
117.3
116.5
31.8
129.4
43.9
38.2
80.0
186.3
182.1
46.1
12.6
224.4
213.2
66.1
10.9
271.6
230.8
27.6
237.1
236.1
39.2
245.6
245.4
24.7
24.6
13.0
253.2
167.3
165.9
32.0
170.9
162.9
17.9
165.8
48.7
171.6
116.5
32.6
8.9
88.0
81.4
87.3
78.9
270.2
128.4
52.1
188.1
187.5
15.4
6.2
182.0
186.0
87.3
78.9
150.5
153.55
25-Yr
43.8
57.1
52.2
46.6
46.6
98.7
91.6
28.5
115.3
109.7
16.5
6.9
67.1
185.6
55.8
55.7
82.4
79.3
27.9
27.3
8.0
35.2
32.7
24.0
8.0
8.0
9.2
125.3
122.8
19.1
138.4
138.9
30.9
28.6
17.2
176.8
176.9
43.5
198.6
61.9
52.8
111.4
279.2
272.7
73.7
21.0
337.6
321.1
100.5
18.6
410.0
349.2
40.1
357.9
357.7
58.8
371.0
369.4
35.8
35.4
18.6
381.6
250.5
247.6
42.4
254.4
241.4
27.5
245.5
63.3
253.1
167.5
46.7
11.8
134.1
123.9
132.0
107.8
387.1
185.6
55.8
188.2
187.5
24
8.0
183.0
186.0
132
107.8
152.7
153.55
50-Yr
56.0
73.1
66.9
62.0
61.5
128.4
119.3
38.2
150.4
143.4
20.6
8.7
83.0
237.7
59.3
59.3
101.6
96.7
37.1
36.2
11.1
47.0
43.9
31.9
9.4
9.4
13.0
159.5
155.2
29.2
181.2
180.9
41.1
38.2
22.7
234.3
231.4
53.6
262.8
77.9
65.6
139.8
367.8
356.3
99.6
29.5
444.2
421.4
131.9
26.2
539.3
458.1
51.3
469.7
470.1
76.6
486.7
485.9
45.8
45.0
23.7
500.9
328.1
324.0
51.4
332.5
314.5
36.4
319.9
75.8
329.1
213.1
59.2
14.3
176.4
162.6
173.2
156.5
506.5
237.7
59.3
188.4
187.5
31.9
9.4
184.0
186.0
173.2
156.5
154.1
153.55
100-Yr
72.7
95.0
87.0
83.3
82.2
169.3
157.6
51.8
198.9
190.0
26.2
11.3
104.8
309.7
65.6
65.6
122.5
116.2
50.0
48.6
15.5
63.6
59.4
43.0
10.9
10.9
18.5
200.3
195.3
44.6
233.4
234.7
55.4
51.8
30.4
306.3
305.1
67.3
346.2
99.7
83.0
178.4
487.3
470.6
136.2
41.7
590.5
558.1
175.6
37.4
718.0
610.4
66.7
626.3
624.5
101.3
645.7
646.7
59.5
58.2
30.6
665.6
436.0
431.1
63.4
441.5
416.9
48.7
423.8
92.4
434.8
275.3
76.4
17.6
233.9
215.9
229.3
216.6
683.3
309.7
65.6
188.6
187.5
43
10.9
185.2
186.0
229.3
216.6
154.9
153.55
Future Conditions
Total Area
Watershed (acres)
A
27.0
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
BB
CC
DD
EE
Area
(sq. mi.)
Tc
Lag Time
(Min)
0.0423
6.6
0.24
73
15
27.7
0.0433
3.7
0.13
68
15
18.1
0.0284
1.8
0.10
66
15
6.8
0.0106
1.1
0.16
77
15
3.1
0.0049
1.1
0.35
75
15
30.9
0.0484
8.6
0.28
79
25
15
20.7
0.0324
6.3
0.30
73
15
17.0
0.0265
2.0
0.12
67
15
6.3
0.0098
0.6
0.09
62
15
14.6
0.0228
3.6
0.25
67
15
8.1
0.0127
0.4
0.05
60
15
28.1
0.0439
4.9
0.17
54
20
12
23.0
0.0359
9.0
0.39
66
25
15
23.0
0.0359
13.6
0.59
78
20
12
10.0
0.0156
2.2
0.22
68
15
16.3
0.0255
8.3
0.51
80
15
26.4
0.0412
15.7
0.59
76
15
17.6
0.0275
0.5
0.03
61
15
49.4
0.0772
2.9
0.06
65
15
16.4
0.0257
2.5
0.15
60
15
68.4
0.1069
14.5
0.21
68
25
15
19.0
0.0297
5.1
0.27
73
15
31.4
0.0490
14.8
0.47
70
15
17.0
0.0265
5.4
0.32
73
15
8.5
0.0133
1.4
0.16
74
15
23.2
0.0362
7.4
0.32
74
20
12
14.3
0.0223
7.8
0.54
84
15
19.8
0.0310
10.0
0.51
87
15
76.5
0.1195
19.1
0.25
74
15
4.4
0.0068
2.2
0.51
84
20
12
16.0
0.0250
1.0
0.06
68
15.00
Future Conditions
Area A
Hydraulic Length
Slope
*Velocity
TcA1
Hydraulic Length
Slope
*Velocity
TcA2
Hydraulic Length
Slope
*Velocity
TcA3
Total TcA
Tc Used
Lag Time
840
0.027
2.7
5.2
450
0.044
3.7
2.0
780
0.013
2.0
6.5
13.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area B
Hydraulic Length
Slope
*Velocity
TcB1
Hydraulic Length
Slope
*Velocity
TcB2
Total TcB
Tc Used
Lag Time
840
0.040
3.5
4.0
390
0.026
2.8
2.3
6.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area D
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
660
0.091
5.3
2.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area E
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
510
0.078
4.8
1.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area H
Hydraulic Length
Slope
*Velocity
TcH1
Hydraulic Length
Slope
*Velocity
TcH2
Total TcH
Tc Used
Lag Time
360
0.028
2.9
2.1
420
0.024
2.7
2.6
4.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area J
Hydraulic Length
Slope
*Velocity
TcJ1
Hydraulic Length
Slope
*Velocity
TcJ2
Hydraulic Length
Slope
*Velocity
TcJ3
Hydraulic Length
Slope
*Velocity
TcJ4
Total TcJ
Tc Used
Lag Time
210
0.143
5.8
0.6
570
0.018
2.4
4.0
60
0.330
9.0
0.1
300
0.005
1.1
4.5
9.2
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area M
Hydraulic Length
Slope
*Velocity
TcM1
Tc Used
Lag Time
2250
0.009
1.7
22.1
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area P
Hydraulic Length
Slope
*Velocity
TcP1
Tc Used
Lag Time
1050
0.038
3.5
5.0
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area R
Hydraulic Length
Slope
*Velocity
TcR1
Hydraulic Length
Slope
*Velocity
TcR2
Total TcR
Tc Used
Lag Time
510
0.078
4.2
2.0
450
0.022
2.2
3.4
5.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area U
Hydraulic Length
Slope
*Velocity
TcU1
Hydraulic Length
Slope
*Velocity
TcU2
Total TcU
Tc Used
Lag Time
1500
0.007
1.5
16.7
1380
0.073
4.2
5.5
22.1
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area X
Hydraulic Length
Slope
*Velocity
TcX1
Tc Used
Lag Time
1740
0.014
2.1
13.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area C
Hydraulic Length
Slope
*Velocity
TcC1
Hydraulic Length
Slope
*Velocity
TcC2
Total TcC
Tc Used
Lag Time
300
0.033
3.1
1.6
810
0.031
2.6
5.2
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area F
Hydraulic Length
Slope
*Velocity
TcF1
Hydraulic Length
Slope
*Velocity
TcF2
Hydraulic Length
Slope
*Velocity
TcF3
Total TcF
Tc Used
Lag Time
510
0.078
4.6
1.8
2400
0.017
2.2
18.2
150
0.200
7.0
0.4
20.4
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area K
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
200
0.167
7.5
0.4
510
0.029
0.9
10.0
10.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area N
Hydraulic Length
Slope
*Velocity
TcN1
Hydraulic Length
Slope
*Velocity
TcN2
Total TcN
Tc Used
Lag Time
1380
0.015
2.1
11.0
1200
0.049
3.7
5.4
16.4
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Q
Hydraulic Length
Slope
*Velocity
TcQ1
Hydraulic Length
Slope
*Velocity
TcQ2
Total TcQ
Tc Used
Lag Time
1110
0.018
2.4
7.7
720
0.028
3.0
4.0
11.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area S
Hydraulic Length
Slope
*Velocity
TcS1
Hydraulic Length
Slope
*Velocity
TcS2
Hydraulic Length
Slope
*Velocity
TcS3
Total TcF
Tc Used
Lag Time
420
0.007
1.5
4.7
210
0.238
2.4
1.5
960
0.031
2.6
6.2
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area V
Hydraulic Length
Slope
*Velocity
TcV1
Hydraulic Length
Slope
*Velocity
TcV2
Total TcV
Tc Used
Lag Time
450
0.089
1.5
5.0
600
0.050
3.4
2.9
7.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area G
Hydraulic Length
Slope
*Velocity
TcG1
Hydraulic Length
Slope
*Velocity
TcG2
Total TcG
Tc Used
Lag Time
300
0.067
4.5
1.1
870
0.023
2.5
5.8
6.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area I
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
510
0.078
4.4
1.9
300
0.033
3.3
1.5
3.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area L
Hydraulic Length
Slope
*Velocity
TcL1
Hydraulic Length
Slope
*Velocity
TcL2
Hydraulic Length
Slope
*Velocity
TcL3
Hydraulic Length
Slope
*Velocity
TcL4
Total TcL
Tc Used
Lag Time
450
0.044
1.2
6.3
360
0.028
0.9
7.1
420
0.048
1.3
5.4
90
0.440
3.5
0.4
19.1
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area O
Hydraulic Length
Slope
*Velocity
TcO1
Hydraulic Length
Slope
*Velocity
TcO2
Total TcO
Tc Used
Lag Time
240
0.125
6.0
0.7
810
0.012
1.7
7.9
8.6
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area T
Hydraulic Length
Slope
*Velocity
TcT1
Tc Used
Lag Time
750
0.067
1.2
10.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area W
Hydraulic Length
Slope
*Velocity
TcW1
Hydraulic Length
Slope
*Velocity
TcW2
Total TcW
Tc Used
Lag Time
360
0.056
4.5
1.3
1110
0.049
3.4
5.4
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Y
Hydraulic Length
Slope
*Velocity
TcY1
Tc Used
Lag Time
150
0.133
1.6
1.6
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area Z
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area AA
Hydraulic Length
Slope
*Velocity
TcAA1
Tc Used
Lag Time
570
0.088
5.0
1.9
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area BB
Hydraulic Length
Slope
*Velocity
TcBB1
Hydraulic Length
Slope
*Velocity
TcBB2
Total TcBB
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area CC
Hydraulic Length
Slope
*Velocity
TcCC1
Hydraulic Length
Slope
*Velocity
TcCC2
Total TcCC
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area DD
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
630
0.032
3.1
3.4
1200
0.005
1.5
13.3
16.7
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area EE
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
240
0.250
2.5
1.6
960
0.010
1.5
10.7
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Future Conditions
tA
Hydraulic Length
Slope
*Velocity
tA
tA
540
0.005
1.5
6.0
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
240
0.005
1.5
2.7
0.04
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
810
0.025
2.7
5.0
0.1
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD1
Hydraulic Length
Slope
*Velocity
tD2
Total tD
tD
300
0.025
2.7
1.9
280
0.005
1.2
3.9
5.7
0.10
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
450
0.011
1.6
4.7
0.08
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
900
0.067
4.5
3.3
0.06
ft
ft/ft
fps
min
hour
450
0.033
3.2
2.3
0.04
ft
ft/ft
fps
min
hour
tI
Hydraulic Length
Slope
*Velocity
tI1
Hydraulic Length
Slope
*Velocity
tI2
Total tD
tD
420
0.012
1.5
4.7
90
0.600
12.0
0.1
4.8
0.08
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tG
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tH
Hydraulic Length
Slope
*Velocity
tH
tH
tJ
Hydraulic Length
Slope
*Velocity
tJ
tJ
300
0.100
5.0
1.0
0.02
ft
ft/ft
fps
min
hour
tK
Hydraulic Length
Slope
*Velocity
tK
tK
1200
0.033
2.6
7.7
0.13
ft
ft/ft
fps
min
hour
tL
Hydraulic Length
Slope
*Velocity
tL
tL
360
0.028
2.5
2.4
0.04
ft
ft/ft
fps
min
hour
tM
Hydraulic Length
Slope
*Velocity
tM
tM
720
0.014
1.8
6.7
0.11
ft
ft/ft
fps
min
hour
tN
Hydraulic Length
Slope
*Velocity
tN
tN
900
0.011
1.6
9.4
0.16
ft
ft/ft
fps
min
hour
tO
Hydraulic Length
Slope
*Velocity
tO
tO
1500
0.007
1.2
20.8
0.35
ft
ft/ft
fps
min
hour
tO1
Hydraulic Length
Slope
*Velocity
tO1
tO1
150
0.005
1.1
2.3
0.04
ft
ft/ft
fps
min
hour
tP
Hydraulic Length
Slope
*Velocity
tP
tP
300
0.017
2.0
2.5
0.04
ft
ft/ft
fps
min
hour
tQ
Hydraulic Length
Slope
*Velocity
tQ
tQ
450
0.060
3.7
2.0
0.03
ft
ft/ft
fps
min
hour
tR
Hydraulic Length
Slope
*Velocity
tR
tR
1650
0.006
1.3
21.2
0.35
ft
ft/ft
fps
min
hour
tS
Hydraulic Length
Slope
*Velocity
tS
tS
900
0.011
2.2
6.8
0.11
ft
ft/ft
fps
min
hour
tT
Hydraulic Length
Slope
*Velocity
tT
tT
1200
0.005
1.1
18.2
0.30
ft
ft/ft
fps
min
hour
tZ
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
Location
Bridge Rd.
Strawberry Hill Rd.
Straw Avenue
Depot Avenue
Locust St.
North Main St.
Elm St.
Hospital Rd.
North Elm St.
48-Inch Pipe
Washington St.
Federal St.
Milton St.
Elm St.
Drainage
Area (acres)
20.7
27.1
27.1
27.7
27.7
54.8
54.8
18.2
73.0
73.0
6.8
3.1
31.0
113.9
113.9
113.9
134.6
134.6
17.0
17.0
6.3
23.2
23.2
14.6
14.6
14.6
8.1
180.5
180.5
28.1
208.6
208.6
23.0
23.0
10.0
241.6
241.6
16.3
257.9
26.4
23.0
49.3
307.3
307.3
49.4
17.6
374.3
374.3
16.4
390.7
390.7
19.0
409.7
409.7
31.4
441.1
441.1
17.0
17.0
8.5
466.6
466.6
466.6
14.3
480.8
480.8
16.0
496.8
19.8
516.7
144.8
23.2
4.4
4.4
4.4
27.5
27.5
689.0
113.9
14.6
27.5
Tc(min)
15
15
CN
73
73
15
68
15
66
15
15
25
77
75
79
15
67
15
62
15
67
15
60
20
54
25
66
15
68
15
80
15
20
76
78
15
15
65
61
15
60
15
73
15
70
15
73
15
74
15
84
15
68
15
87
40
20
20
73
74
84
2-Yr
14.4
18.8
17.8
12.2
12.0
29.5
28.1
7.1
33.9
32.6
6.2
2.3
27.0
62.1
30.9
30.2
33.6
32.7
7.4
7.1
1.5
8.6
8.2
6.3
3.5
3.5
1.5
39.1
38.7
1.5
39.7
39.7
7.7
7.2
4.7
47.5
47.4
17.6
55.6
22.5
20.5
42.5
86.2
84.6
17.5
3.7
101.4
96.0
3.0
98.1
83.3
13.2
86.4
86.3
17.5
90.3
90.4
11.8
12.0
6.3
94.3
72.2
72.0
18.9
74.9
73.6
7.6
75.1
30.1
78.7
72.0
16.1
5.3
23.2
19.2
22.2
22.0
160.1
62.1
30.9
187.1
187.5
6.3
3.5
181.0
186.0
22.2
22.0
148.2
153.55
100-Yr
72.7
95.0
87.0
83.3
82.2
169.3
157.6
51.8
198.9
190.0
26.2
11.3
104.8
309.7
65.6
65.6
122.5
116.2
50.0
48.6
15.5
63.6
59.4
43.0
10.9
10.9
18.5
200.3
195.3
44.6
233.4
234.7
55.4
51.8
30.4
306.3
305.1
67.3
346.2
99.7
83.0
178.4
487.3
470.6
136.2
41.7
590.5
558.1
37.4
579.1
493.4
66.7
507.0
505.3
101.3
526.5
524.8
59.5
58.2
30.6
541.5
354.7
351.4
63.4
360.6
343.4
48.7
349.9
92.4
361.0
353.7
76.4
17.6
191.1
178.3
190.9
179.5
749.9
309.7
65.6
188.6
187.5
43.0
10.9
185.2
186.0
190.9
179.5
154.4
153.55
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
V
W
X
Y
Z
AA
BB
DD
EE
U+CC
Area
(sq. mi.)
Tc
Lag Time
(Min)
0.0423
6.6
0.24
73
15
27.7
0.0433
3.7
0.13
68
15
18.1
0.0284
1.8
0.10
66
15
6.8
0.0106
1.1
0.16
77
15
3.1
0.0049
1.1
0.35
75
15
30.9
0.0484
8.6
0.28
79
25
15
20.7
0.0324
6.3
0.30
73
15
17.0
0.0265
2.0
0.12
67
15
6.3
0.0098
0.6
0.09
62
15
14.6
0.0228
3.6
0.25
67
15
8.1
0.0127
0.4
0.05
60
15
28.1
0.0439
4.9
0.17
54
20
12
23.0
0.0359
9.0
0.39
66
25
15
23.0
0.0359
13.6
0.59
78
20
12
10.0
0.0156
2.2
0.22
68
15
16.3
0.0255
8.3
0.51
80
15
26.4
0.0412
15.7
0.59
76
15
17.6
0.0275
0.5
0.03
61
15
49.4
0.0772
2.9
0.06
65
15
16.4
0.0257
2.5
0.15
60
15
19.0
0.0297
5.1
0.27
73
15
31.4
0.0490
14.8
0.47
70
15
17.0
0.0265
5.4
0.32
73
15
8.5
0.0133
1.4
0.16
74
15
23.2
0.0362
7.4
0.32
74
20
12
14.3
0.0223
7.8
0.54
84
15
19.8
0.0310
10.0
0.51
87
15
4.4
0.0068
2.2
0.51
84
20
12
16.0
0.0250
1.0
0.06
68
15.00
144.8
0.2263
33.5
0.46
73
40.00
24
840
0.027
2.7
5.2
450
0.044
3.7
2.0
780
0.013
2.0
6.5
13.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area B
Hydraulic Length
Slope
*Velocity
TcB1
Hydraulic Length
Slope
*Velocity
TcB2
Total TcB
Tc Used
Lag Time
840
0.040
3.5
4.0
390
0.026
2.8
2.3
6.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area D
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
660
0.091
5.3
2.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area E
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
510
0.078
4.8
1.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area H
Hydraulic Length
Slope
*Velocity
TcH1
Hydraulic Length
Slope
*Velocity
TcH2
Total TcH
Tc Used
Lag Time
360
0.028
2.9
2.1
420
0.024
2.7
2.6
4.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area J
Hydraulic Length
Slope
*Velocity
TcJ1
Hydraulic Length
Slope
*Velocity
TcJ2
Hydraulic Length
Slope
*Velocity
TcJ3
Hydraulic Length
Slope
*Velocity
TcJ4
Total TcJ
Tc Used
Lag Time
210
0.143
5.8
0.6
570
0.018
2.4
4.0
60
0.330
9.0
0.1
300
0.005
1.1
4.5
9.2
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area M
Hydraulic Length
Slope
*Velocity
TcM1
Tc Used
Lag Time
2250
0.009
1.7
22.1
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area P
Hydraulic Length
Slope
*Velocity
TcP1
Tc Used
Lag Time
1050
0.038
3.5
5.0
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area R
Hydraulic Length
Slope
*Velocity
TcR1
Hydraulic Length
Slope
*Velocity
TcR2
Total TcR
Tc Used
Lag Time
510
0.078
4.2
2.0
450
0.022
2.2
3.4
5.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area U
Hydraulic Length
Slope
*Velocity
TcU1
Hydraulic Length
Slope
*Velocity
TcU2
Total TcU
Tc Used
Lag Time
1500
0.007
1.5
16.7
1380
0.073
4.2
5.5
22.1
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area X
Hydraulic Length
Slope
*Velocity
TcX1
Tc Used
Lag Time
1740
0.014
2.1
13.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area C
Hydraulic Length
Slope
*Velocity
TcC1
Hydraulic Length
Slope
*Velocity
TcC2
Total TcC
Tc Used
Lag Time
300
0.033
3.1
1.6
810
0.031
2.6
5.2
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area F
Hydraulic Length
Slope
*Velocity
TcF1
Hydraulic Length
Slope
*Velocity
TcF2
Hydraulic Length
Slope
*Velocity
TcF3
Total TcF
Tc Used
Lag Time
510
0.078
4.6
1.8
2400
0.017
2.2
18.2
150
0.200
7.0
0.4
20.4
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area K
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
200
0.167
7.5
0.4
510
0.029
0.9
10.0
10.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area N
Hydraulic Length
Slope
*Velocity
TcN1
Hydraulic Length
Slope
*Velocity
TcN2
Total TcN
Tc Used
Lag Time
1380
0.015
2.1
11.0
1200
0.049
3.7
5.4
16.4
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Q
Hydraulic Length
Slope
*Velocity
TcQ1
Hydraulic Length
Slope
*Velocity
TcQ2
Total TcQ
Tc Used
Lag Time
1110
0.018
2.4
7.7
720
0.028
3.0
4.0
11.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area S
Hydraulic Length
Slope
*Velocity
TcS1
Hydraulic Length
Slope
*Velocity
TcS2
Hydraulic Length
Slope
*Velocity
TcS3
Total TcF
Tc Used
Lag Time
420
0.007
1.5
4.7
210
0.238
2.4
1.5
960
0.031
2.6
6.2
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area V
Hydraulic Length
Slope
*Velocity
TcV1
Hydraulic Length
Slope
*Velocity
TcV2
Total TcV
Tc Used
Lag Time
450
0.089
1.5
5.0
600
0.050
3.4
2.9
7.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area G
Hydraulic Length
Slope
*Velocity
TcG1
Hydraulic Length
Slope
*Velocity
TcG2
Total TcG
Tc Used
Lag Time
300
0.067
4.5
1.1
870
0.023
2.5
5.8
6.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area I
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
510
0.078
4.4
1.9
300
0.033
3.3
1.5
3.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area L
Hydraulic Length
Slope
*Velocity
TcL1
Hydraulic Length
Slope
*Velocity
TcL2
Hydraulic Length
Slope
*Velocity
TcL3
Hydraulic Length
Slope
*Velocity
TcL4
Total TcL
Tc Used
Lag Time
450
0.044
1.2
6.3
360
0.028
0.9
7.1
420
0.048
1.3
5.4
90
0.440
3.5
0.4
19.1
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area O
Hydraulic Length
Slope
*Velocity
TcO1
Hydraulic Length
Slope
*Velocity
TcO2
Total TcO
Tc Used
Lag Time
240
0.125
6.0
0.7
810
0.012
1.7
7.9
8.6
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area T
Hydraulic Length
Slope
*Velocity
TcT1
Tc Used
Lag Time
750
0.067
1.2
10.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area W
Hydraulic Length
Slope
*Velocity
TcW1
Hydraulic Length
Slope
*Velocity
TcW2
Total TcW
Tc Used
Lag Time
360
0.056
4.5
1.3
1110
0.049
3.4
5.4
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Y
Hydraulic Length
Slope
*Velocity
TcY1
Tc Used
Lag Time
150
0.133
1.6
1.6
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area Z
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area AA
Hydraulic Length
Slope
*Velocity
TcAA1
Tc Used
Lag Time
570
0.088
5.0
1.9
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area BB
Hydraulic Length
Slope
*Velocity
TcBB1
Hydraulic Length
Slope
*Velocity
TcBB2
Total TcBB
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area CC
Hydraulic Length
Slope
*Velocity
TcCC1
Hydraulic Length
Slope
*Velocity
TcCC2
Total TcCC
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area DD
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
630
0.032
3.1
3.4
1200
0.005
1.5
13.3
16.7
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area EE
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
240
0.250
2.5
1.6
960
0.010
1.5
10.7
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area U+CC
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
6000
0.020
2.5
40.0
40.0
0.40
ft
ft/ft
fps
min
min
hr
540
0.005
1.5
6.0
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
240
0.005
1.5
2.7
0.04
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
810
0.025
2.7
5.0
0.1
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD1
Hydraulic Length
Slope
*Velocity
tD2
Total tD
tD
300
0.025
2.7
1.9
280
0.005
1.2
3.9
5.7
0.10
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
450
0.011
1.6
4.7
0.08
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
900
0.067
4.5
3.3
0.06
ft
ft/ft
fps
min
hour
450
0.033
3.2
2.3
0.04
ft
ft/ft
fps
min
hour
tI
Hydraulic Length
Slope
*Velocity
tI1
Hydraulic Length
Slope
*Velocity
tI2
Total tD
tD
420
0.012
1.5
4.7
90
0.600
12.0
0.1
4.8
0.08
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tG
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tH
Hydraulic Length
Slope
*Velocity
tH
tH
tJ
Hydraulic Length
Slope
*Velocity
tJ
tJ
300
0.100
5.0
1.0
0.02
ft
ft/ft
fps
min
hour
tK
Hydraulic Length
Slope
*Velocity
tK
tK
1200
0.033
2.6
7.7
0.13
ft
ft/ft
fps
min
hour
tL
Hydraulic Length
Slope
*Velocity
tL
tL
360
0.028
2.5
2.4
0.04
ft
ft/ft
fps
min
hour
tM
Hydraulic Length
Slope
*Velocity
tM
tM
720
0.014
1.8
6.7
0.11
ft
ft/ft
fps
min
hour
tN
Hydraulic Length
Slope
*Velocity
tN
tN
900
0.011
1.6
9.4
0.16
ft
ft/ft
fps
min
hour
tO
Hydraulic Length
Slope
*Velocity
tO
tO
1500
0.007
1.2
20.8
0.35
ft
ft/ft
fps
min
hour
tO1
Hydraulic Length
Slope
*Velocity
tO1
tO1
150
0.005
1.1
2.3
0.04
ft
ft/ft
fps
min
hour
tP
Hydraulic Length
Slope
*Velocity
tP
tP
300
0.017
2.0
2.5
0.04
ft
ft/ft
fps
min
hour
tQ
Hydraulic Length
Slope
*Velocity
tQ
tQ
450
0.060
3.7
2.0
0.03
ft
ft/ft
fps
min
hour
tR
Hydraulic Length
Slope
*Velocity
tR
tR
1650
0.006
1.3
21.2
0.35
ft
ft/ft
fps
min
hour
tS
Hydraulic Length
Slope
*Velocity
tS
tS
900
0.011
2.2
6.8
0.11
ft
ft/ft
fps
min
hour
tT
Hydraulic Length
Slope
*Velocity
tT
tT
1200
0.005
1.1
18.2
0.30
ft
ft/ft
fps
min
hour
tZ
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
Location
Bridge Rd.
Strawberry Hill Rd.
Straw Avenue
Depot Avenue
Locust St.
North Main St.
Elm St.
Hospital Rd.
North Elm St.
48-inch Pipe
Washington St.
Federal St.
Milton St.
Elm St.
Drainage
Area (acres)
20.7
27.1
27.1
27.7
27.7
54.8
54.8
18.2
73.0
73.0
6.8
3.1
31.0
113.9
113.9
113.9
134.6
134.6
17.0
17.0
6.3
23.2
23.2
14.6
14.6
14.6
8.1
180.5
180.5
28.1
208.6
208.6
23.0
23.0
10.0
241.6
241.6
16.3
257.9
26.4
23.0
49.3
307.3
307.3
49.4
17.6
374.3
374.3
68.4
16.4
459.1
459.1
19.0
478.1
478.1
31.4
509.5
509.5
17.0
17.0
8.5
535.0
535.0
535.0
14.3
549.2
549.2
16.0
565.2
19.8
585.1
76.5
23.2
4.4
4.4
4.4
27.5
27.5
689.1
113.9
14.6
27.5
478.1
Tc
15
15
CN
73
73
15
68
15
66
15
15
25
77
75
79
15
67
15
62
15
67
15
60
20
54
25
66
15
68
15
80
15
20
76
78
15
15
65
61
25
15
68
60
15
73
15
70
15
73
15
74
15
84
15
68
15
87
15
20
20
74
74
84
2-Yr
14.4
18.8
17.8
12.2
12.0
29.5
28.1
7.1
33.9
32.6
6.2
2.3
27.0
62.1
30.9
30.2
33.6
32.7
7.4
7.1
1.5
8.6
8.2
6.3
3.5
3.5
1.5
39.1
38.7
1.5
39.7
39.7
7.7
7.2
4.7
47.5
47.4
17.6
55.6
22.5
20.5
42.5
86.2
84.6
17.5
3.7
101.4
96.0
27.7
3.0
120.0
101.4
13.2
12.4
12.4
17.5
17.9
17.9
11.8
12.0
6.3
36.1
36.1
32.9
18.9
47.8
38.4
7.6
42.5
30.1
58.8
57.0
16.1
5.3
5.3
3.9
18.7
17.3
118.7
62.1
30.9
187.1
187.5
6.3
3.5
181.0
186.0
18.7
17.3
148.1
153.55
104.5
12.4
173.7
176.0
10-Yr
30.1
39.4
36.2
29.9
30.2
66.1
61.7
18.0
76.7
72.9
11.8
4.8
49.0
128.4
52.1
52.0
65.9
64.1
17.9
17.6
4.8
22.4
20.8
15.4
6.2
6.2
5.4
89.8
88.3
9.4
95.6
94.9
19.8
18.3
11.2
117.3
116.5
31.8
129.4
43.9
38.2
80.0
186.3
182.1
46.1
12.6
224.4
213.2
66.1
10.9
271.6
230.8
27.6
24.6
24.6
39.2
40.3
40.6
24.7
24.6
13.0
77.6
68.6
65.4
32.0
90.2
74.7
17.9
83.9
48.7
110.1
116.5
32.6
8.9
17.9
9.8
39.4
36.6
249.4
128.4
52.1
188.1
187.5
15.4
6.2
182.0
186.0
39.4
36.6
148.5
153.55
237.1
24.6
174.4
176.0
25-Yr
43.8
57.1
52.2
46.6
46.6
98.7
91.6
28.5
115.3
109.7
16.5
6.9
67.1
185.6
55.8
55.7
82.4
79.3
27.9
27.3
8.0
35.2
32.7
24.0
8.0
8.0
9.2
125.3
122.8
19.1
138.4
138.9
30.9
28.6
17.2
176.8
176.9
43.5
198.6
61.9
52.8
111.4
279.2
272.7
73.7
21.0
337.6
321.1
100.5
18.6
410.0
349.2
40.1
35.0
35.0
58.8
61.1
61.0
35.8
35.4
18.6
114.0
80.2
76.3
42.4
111.3
92.1
27.5
106.8
63.3
147.8
167.5
46.7
11.8
45.7
28.2
66.2
59.2
350.9
185.6
55.8
188.2
187.5
24.0
8.0
183.0
186.0
66.2
59.2
149.4
153.55
357.9
35.0
175
176.0
50-Yr
56.0
73.1
66.9
62.0
61.5
128.4
119.3
38.2
150.4
143.4
20.6
8.7
83.0
237.7
59.3
59.3
101.6
96.7
37.1
36.2
11.1
47.0
43.9
31.9
9.4
9.4
13.0
159.5
155.2
29.2
181.2
180.9
41.1
38.2
22.7
234.3
231.4
53.6
262.8
77.9
65.6
139.8
367.8
356.3
99.6
29.5
444.2
421.4
131.9
26.2
539.3
458.1
51.3
46.0
46.0
76.6
80.4
79.8
45.8
45.0
23.7
147.2
99.5
94.0
51.4
135.7
112.1
36.4
131.7
75.8
182.4
213.1
59.2
14.3
61.9
41.6
88.1
73.0
439
237.7
59.3
188.4
187.5
31.9
9.4
184.0
186.0
88.1
73
150.1
153.55
469.7
46
175.6
176.0
100-Yr
72.7
95.0
87.0
83.3
82.2
169.3
157.6
51.8
198.9
190.0
26.2
11.3
104.8
309.7
65.6
65.6
122.5
116.2
50.0
48.6
15.5
63.6
59.4
43.0
10.9
10.9
18.5
200.3
195.3
44.6
233.4
234.7
55.4
51.8
30.4
306.3
305.1
67.3
346.2
99.7
83.0
178.4
487.3
470.6
136.2
41.7
590.5
558.1
175.6
37.4
718.0
610.4
66.7
71.3
71.3
101.3
107.3
106.2
59.5
58.2
30.6
193.0
128.6
120.8
63.4
171.6
141.7
48.7
167.3
92.4
229.2
275.3
76.4
17.6
82.0
56.7
117.0
84.7
557.1
309.7
65.6
188.6
187.5
43.0
10.9
185.2
186.0
117
84.7
150.9
153.55
626.3
71.3
176.3
176.0
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
BB
CC
DD
EE
Area
(sq. mi.)
Tc
Lag Time
(Min)
0.0423
6.6
0.24
73
15
27.7
0.0433
3.7
0.13
68
15
18.1
0.0284
1.8
0.10
66
15
6.8
0.0106
1.1
0.16
77
15
3.1
0.0049
1.1
0.35
75
15
30.9
0.0484
8.6
0.28
79
25
15
20.7
0.0324
6.3
0.30
73
15
17.0
0.0265
2.0
0.12
67
15
6.3
0.0098
0.6
0.09
62
15
14.6
0.0228
3.6
0.25
67
15
8.1
0.0127
0.4
0.05
60
15
28.1
0.0439
4.9
0.17
54
20
12
23.0
0.0359
9.0
0.39
66
25
15
23.0
0.0359
13.6
0.59
78
20
12
10.0
0.0156
2.2
0.22
68
15
16.3
0.0255
8.3
0.51
80
15
26.4
0.0412
15.7
0.59
76
15
17.6
0.0275
0.5
0.03
61
15
49.4
0.0772
2.9
0.06
65
15
16.4
0.0257
2.5
0.15
60
15
68.4
0.1069
14.5
0.21
68
25
15
19.0
0.0297
5.1
0.27
73
15
31.4
0.0490
14.8
0.47
70
15
17.0
0.0265
5.4
0.32
73
15
8.5
0.0133
1.4
0.16
74
15
23.2
0.0362
7.4
0.32
74
20
12
14.3
0.0223
7.8
0.54
84
15
19.8
0.0310
10.0
0.51
87
15
76.5
0.1195
19.1
0.25
74
15
4.4
0.0068
2.2
0.51
84
20
12
16.0
0.0250
1.0
0.06
68
15.00
840
0.027
2.7
5.2
450
0.044
3.7
2.0
780
0.013
2.0
6.5
13.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area B
Hydraulic Length
Slope
*Velocity
TcB1
Hydraulic Length
Slope
*Velocity
TcB2
Total TcB
Tc Used
Lag Time
840
0.040
3.5
4.0
390
0.026
2.8
2.3
6.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area D
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
660
0.091
5.3
2.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area E
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
510
0.078
4.8
1.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area H
Hydraulic Length
Slope
*Velocity
TcH1
Hydraulic Length
Slope
*Velocity
TcH2
Total TcH
Tc Used
Lag Time
360
0.028
2.9
2.1
420
0.024
2.7
2.6
4.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area J
Hydraulic Length
Slope
*Velocity
TcJ1
Hydraulic Length
Slope
*Velocity
TcJ2
Hydraulic Length
Slope
*Velocity
TcJ3
Hydraulic Length
Slope
*Velocity
TcJ4
Total TcJ
Tc Used
Lag Time
210
0.143
5.8
0.6
570
0.018
2.4
4.0
60
0.330
9.0
0.1
300
0.005
1.1
4.5
9.2
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area M
Hydraulic Length
Slope
*Velocity
TcM1
Tc Used
Lag Time
2250
0.009
1.7
22.1
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area P
Hydraulic Length
Slope
*Velocity
TcP1
Tc Used
Lag Time
1050
0.038
3.5
5.0
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area R
Hydraulic Length
Slope
*Velocity
TcR1
Hydraulic Length
Slope
*Velocity
TcR2
Total TcR
Tc Used
Lag Time
510
0.078
4.2
2.0
450
0.022
2.2
3.4
5.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area U
Hydraulic Length
Slope
*Velocity
TcU1
Hydraulic Length
Slope
*Velocity
TcU2
Total TcU
Tc Used
Lag Time
1500
0.007
1.5
16.7
1380
0.073
4.2
5.5
22.1
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area X
Hydraulic Length
Slope
*Velocity
TcX1
Tc Used
Lag Time
1740
0.014
2.1
13.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area C
Hydraulic Length
Slope
*Velocity
TcC1
Hydraulic Length
Slope
*Velocity
TcC2
Total TcC
Tc Used
Lag Time
300
0.033
3.1
1.6
810
0.031
2.6
5.2
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area F
Hydraulic Length
Slope
*Velocity
TcF1
Hydraulic Length
Slope
*Velocity
TcF2
Hydraulic Length
Slope
*Velocity
TcF3
Total TcF
Tc Used
Lag Time
510
0.078
4.6
1.8
2400
0.017
2.2
18.2
150
0.200
7.0
0.4
20.4
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area K
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
200
0.167
7.5
0.4
510
0.029
0.9
10.0
10.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area N
Hydraulic Length
Slope
*Velocity
TcN1
Hydraulic Length
Slope
*Velocity
TcN2
Total TcN
Tc Used
Lag Time
1380
0.015
2.1
11.0
1200
0.049
3.7
5.4
16.4
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Q
Hydraulic Length
Slope
*Velocity
TcQ1
Hydraulic Length
Slope
*Velocity
TcQ2
Total TcQ
Tc Used
Lag Time
1110
0.018
2.4
7.7
720
0.028
3.0
4.0
11.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area S
Hydraulic Length
Slope
*Velocity
TcS1
Hydraulic Length
Slope
*Velocity
TcS2
Hydraulic Length
Slope
*Velocity
TcS3
Total TcF
Tc Used
Lag Time
420
0.007
1.5
4.7
210
0.238
2.4
1.5
960
0.031
2.6
6.2
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area V
Hydraulic Length
Slope
*Velocity
TcV1
Hydraulic Length
Slope
*Velocity
TcV2
Total TcV
Tc Used
Lag Time
450
0.089
1.5
5.0
600
0.050
3.4
2.9
7.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area G
Hydraulic Length
Slope
*Velocity
TcG1
Hydraulic Length
Slope
*Velocity
TcG2
Total TcG
Tc Used
Lag Time
300
0.067
4.5
1.1
870
0.023
2.5
5.8
6.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area I
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
510
0.078
4.4
1.9
300
0.033
3.3
1.5
3.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area L
Hydraulic Length
Slope
*Velocity
TcL1
Hydraulic Length
Slope
*Velocity
TcL2
Hydraulic Length
Slope
*Velocity
TcL3
Hydraulic Length
Slope
*Velocity
TcL4
Total TcL
Tc Used
Lag Time
450
0.044
1.2
6.3
360
0.028
0.9
7.1
420
0.048
1.3
5.4
90
0.440
3.5
0.4
19.1
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area O
Hydraulic Length
Slope
*Velocity
TcO1
Hydraulic Length
Slope
*Velocity
TcO2
Total TcO
Tc Used
Lag Time
240
0.125
6.0
0.7
810
0.012
1.7
7.9
8.6
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area T
Hydraulic Length
Slope
*Velocity
TcT1
Tc Used
Lag Time
750
0.067
1.2
10.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area W
Hydraulic Length
Slope
*Velocity
TcW1
Hydraulic Length
Slope
*Velocity
TcW2
Total TcW
Tc Used
Lag Time
360
0.056
4.5
1.3
1110
0.049
3.4
5.4
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Y
Hydraulic Length
Slope
*Velocity
TcY1
Tc Used
Lag Time
150
0.133
1.6
1.6
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area Z
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
1500
0.007
1.5
16.7
20.0
0.20
ft
ft/ft
fps
min
min
hr
Area AA
Hydraulic Length
Slope
*Velocity
TcAA1
Tc Used
Lag Time
570
0.088
5.0
1.9
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area BB
Hydraulic Length
Slope
*Velocity
TcBB1
Hydraulic Length
Slope
*Velocity
TcBB2
Total TcBB
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area CC
Hydraulic Length
Slope
*Velocity
TcCC1
Hydraulic Length
Slope
*Velocity
TcCC2
Total TcCC
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area DD
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
630
0.032
3.1
3.4
1200
0.005
1.5
13.3
16.7
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area EE
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
240
0.250
2.5
1.6
960
0.010
1.5
10.7
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
540
0.005
1.5
6.0
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
240
0.005
1.5
2.7
0.04
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
810
0.025
2.7
5.0
0.1
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD1
Hydraulic Length
Slope
*Velocity
tD2
Total tD
tD
300
0.025
2.7
1.9
280
0.005
1.2
3.9
5.7
0.10
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
450
0.011
1.6
4.7
0.08
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
900
0.067
4.5
3.3
0.06
ft
ft/ft
fps
min
hour
450
0.033
3.2
2.3
0.04
ft
ft/ft
fps
min
hour
tI
Hydraulic Length
Slope
*Velocity
tI1
Hydraulic Length
Slope
*Velocity
tI2
Total tD
tD
420
0.012
1.5
4.7
90
0.600
12.0
0.1
4.8
0.08
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tG
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tH
Hydraulic Length
Slope
*Velocity
tH
tH
tJ
Hydraulic Length
Slope
*Velocity
tJ
tJ
300
0.100
5.0
1.0
0.02
ft
ft/ft
fps
min
hour
tK
Hydraulic Length
Slope
*Velocity
tK
tK
1200
0.033
2.6
7.7
0.13
ft
ft/ft
fps
min
hour
tL
Hydraulic Length
Slope
*Velocity
tL
tL
360
0.028
2.5
2.4
0.04
ft
ft/ft
fps
min
hour
tM
Hydraulic Length
Slope
*Velocity
tM
tM
720
0.014
1.8
6.7
0.11
ft
ft/ft
fps
min
hour
tN
Hydraulic Length
Slope
*Velocity
tN
tN
900
0.011
1.6
9.4
0.16
ft
ft/ft
fps
min
hour
tO
Hydraulic Length
Slope
*Velocity
tO
tO
1500
0.007
1.2
20.8
0.35
ft
ft/ft
fps
min
hour
tO1
Hydraulic Length
Slope
*Velocity
tO1
tO1
150
0.005
1.1
2.3
0.04
ft
ft/ft
fps
min
hour
tP
Hydraulic Length
Slope
*Velocity
tP
tP
300
0.017
2.0
2.5
0.04
ft
ft/ft
fps
min
hour
tQ
Hydraulic Length
Slope
*Velocity
tQ
tQ
450
0.060
3.7
2.0
0.03
ft
ft/ft
fps
min
hour
tR
Hydraulic Length
Slope
*Velocity
tR
tR
1650
0.006
1.3
21.2
0.35
ft
ft/ft
fps
min
hour
tS
Hydraulic Length
Slope
*Velocity
tS
tS
900
0.011
2.2
6.8
0.11
ft
ft/ft
fps
min
hour
tT
Hydraulic Length
Slope
*Velocity
tT
tT
1200
0.005
1.1
18.2
0.30
ft
ft/ft
fps
min
hour
tZ
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
Drainage Area
Location
(acres)
20.7
Bridge Rd.
27.1
27.1
Strawberry Hill Rd.
27.7
27.7
54.8
54.8
18.2
73.0
73.0
6.8
3.1
Straw Avenue
31.0
113.9
113.9
113.9
134.6
134.6
17.0
17.0
6.3
23.2
23.2
14.6
14.6
14.6
8.1
180.5
180.5
28.1
208.6
208.6
Depot Avenue
23.0
23.0
10.0
241.6
241.6
16.3
257.9
Locust St.
26.4
North Main St.
23.0
49.3
307.3
307.3
South Main St.
49.4
17.6
374.3
374.3
South Main St.
68.4
16.4
459.1
459.1
Elm St.
19.0
478.1
478.1
Hospital Rd.
31.4
509.5
509.5
North Elm St.
17.0
17.0
8.5
535.0
535.0
535.0
48-inch Pipe
14.3
549.2
549.2
16.0
565.2
Washington St.
19.8
585.1
Federal St.
67.7
Federal St.
16.5
8.8
93.0
Milton St.
13.3
Elm St.
4.4
4.4
4.4
17.7
17.7
695.7
Tc
15
15
CN
73
73
15
68
15
66
15
15
25
77
75
79
15
67
15
62
15
67
15
60
20
54
25
66
15
68
15
80
15
20
76
78
15
15
65
61
25
15
68
60
15
73
15
70
15
73
15
74
15
84
15
68
15
87
15
15
15
74
73
74
20
20
73
84
2-Yr
14.4
18.8
17.8
12.2
12.0
29.5
28.1
7.1
33.9
32.6
6.2
2.3
27.0
62.1
30.9
30.2
33.6
32.7
7.4
7.1
1.5
8.6
8.2
6.3
3.5
3.5
1.5
39.1
38.7
1.5
39.7
39.7
7.7
7.2
4.7
47.5
47.4
17.6
55.6
22.5
20.5
42.5
86.2
84.6
17.5
3.7
101.4
96.0
27.7
3.0
120.0
101.4
13.2
104.5
104.6
17.5
109.1
108.8
11.8
12.0
6.3
113.2
79.6
78.8
18.9
82.0
79.3
7.6
80.8
30.1
84.6
50.4
11.4
6.5
68.4
8.6
5.3
34.8
30.7
32.4
31.8
131.4
10-Yr
30.1
39.4
36.2
29.9
30.2
66.1
61.7
18.0
76.7
72.9
11.8
4.8
49.0
128.4
52.1
52.0
65.9
64.1
17.9
17.6
4.8
22.4
20.8
15.4
6.2
6.2
5.4
89.8
88.3
9.4
95.6
94.9
19.8
18.3
11.2
117.3
116.5
31.8
129.4
43.9
38.2
80.0
186.3
182.1
46.1
12.6
224.4
213.2
66.1
10.9
271.6
230.8
27.6
237.1
236.1
39.2
245.6
245.4
24.7
24.6
13.0
253.2
167.3
165.9
32.0
170.9
162.9
17.9
165.8
48.7
171.6
103.1
24.0
13.4
140.5
17.9
8.9
88.0
81.4
84.7
76.9
278.1
25-Yr
43.8
57.1
52.2
46.6
46.6
98.7
91.6
28.5
115.3
109.7
16.5
6.9
67.1
185.6
55.8
55.7
82.4
79.3
27.9
27.3
8.0
35.2
32.7
24.0
8.0
8.0
9.2
125.3
122.8
19.1
138.4
138.9
30.9
28.6
17.2
176.8
176.9
43.5
198.6
61.9
52.8
111.4
279.2
272.7
73.7
21.0
337.6
321.1
100.5
18.6
410.0
349.2
40.1
357.9
357.7
58.8
371.0
369.4
35.8
35.4
18.6
381.6
250.5
247.6
42.4
254.4
241.4
27.5
245.5
63.3
253.1
148.3
34.9
19.2
202.3
25.9
11.8
134.1
123.9
128.4
104.1
406.7
50-Yr
56.0
73.1
66.9
62.0
61.5
128.4
119.3
38.2
150.4
143.4
20.6
8.7
83.0
237.7
59.3
59.3
101.6
96.7
37.1
36.2
11.1
47.0
43.9
31.9
9.4
9.4
13.0
159.5
155.2
29.2
181.2
180.9
41.1
38.2
22.7
234.3
231.4
53.6
262.8
77.9
65.6
139.8
367.8
356.3
99.6
29.5
444.2
421.4
131.9
26.2
539.3
458.1
51.3
469.7
470.1
76.6
486.7
485.9
45.8
45.0
23.7
500.9
328.1
324.0
51.4
332.5
314.5
36.4
319.9
75.8
329.1
188.6
44.6
24.4
257.7
33.0
14.3
176.4
162.6
168.5
148.3
517.6
100-Yr
72.7
95.0
87.0
83.3
82.2
169.3
157.6
51.8
198.9
190.0
26.2
11.3
104.8
309.7
65.6
65.6
122.5
116.2
50.0
48.6
15.5
63.6
59.4
43.0
10.9
10.9
18.5
200.3
195.3
44.6
233.4
234.7
55.4
51.8
30.4
306.3
305.1
67.3
346.2
99.7
83.0
178.4
487.3
470.6
136.2
41.7
590.5
558.1
175.6
37.4
718.0
610.4
66.7
626.3
624.5
101.3
645.7
646.7
59.5
58.2
30.6
665.6
436.0
431.1
63.4
441.5
416.9
48.7
423.8
92.4
434.8
243.7
57.9
31.6
333.2
42.8
17.6
233.9
215.9
223.5
207.3
677.3
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z1
Z2
Z3
AA
BB
CC1
DD
EE
Area
(sq. mi.)
Tc
Lag Time
(Min)
0.0423
6.6
0.24
73
15
27.7
0.0433
3.7
0.13
68
15
18.1
0.0284
1.8
0.10
66
15
6.8
0.0106
1.1
0.16
77
15
3.1
0.0049
1.1
0.35
75
15
30.9
0.0484
8.6
0.28
79
25
15
20.7
0.0324
6.3
0.30
73
15
17.0
0.0265
2.0
0.12
67
15
6.3
0.0098
0.6
0.09
62
15
14.6
0.0228
3.6
0.25
67
15
8.1
0.0127
0.4
0.05
60
15
28.1
0.0439
4.9
0.17
54
20
12
23.0
0.0359
9.0
0.39
66
25
15
23.0
0.0359
13.6
0.59
78
20
12
10.0
0.0156
2.2
0.22
68
15
16.3
0.0255
8.3
0.51
80
15
26.4
0.0412
15.7
0.59
76
15
17.6
0.0275
0.5
0.03
61
15
49.4
0.0772
2.9
0.06
65
15
16.4
0.0257
2.5
0.15
60
15
68.4
0.1069
14.5
0.21
68
25
15
19.0
0.0297
5.1
0.27
73
15
31.4
0.0490
14.8
0.47
70
15
17.0
0.0265
5.4
0.32
73
15
8.5
0.0133
1.4
0.16
74
15
16.5
0.0258
5.2
0.32
73
15
13.3
0.0208
4.0
0.32
73
20
12
8.8
0.0137
1.6
0.32
74
15
14.3
0.0223
7.8
0.54
84
15
19.8
0.0310
10.0
0.51
87
15
67.7
0.1058
19.1
0.25
74
15
4.4
0.0068
2.2
0.51
84
20
12
16.0
0.0250
1.0
0.06
68
15.00
840
0.027
2.7
5.2
450
0.044
3.7
2.0
780
0.013
2.0
6.5
13.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area B
Hydraulic Length
Slope
*Velocity
TcB1
Hydraulic Length
Slope
*Velocity
TcB2
Total TcB
Tc Used
Lag Time
840
0.040
3.5
4.0
390
0.026
2.8
2.3
6.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area D
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
660
0.091
5.3
2.1
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area E
Hydraulic Length
Slope
*Velocity
TcD1
Tc Used
Lag Time
510
0.078
4.8
1.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area H
Hydraulic Length
Slope
*Velocity
TcH1
Hydraulic Length
Slope
*Velocity
TcH2
Total TcH
Tc Used
Lag Time
360
0.028
2.9
2.1
420
0.024
2.7
2.6
4.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area J
Hydraulic Length
Slope
*Velocity
TcJ1
Hydraulic Length
Slope
*Velocity
TcJ2
Hydraulic Length
Slope
*Velocity
TcJ3
Hydraulic Length
Slope
*Velocity
TcJ4
Total TcJ
Tc Used
Lag Time
210
0.143
5.8
0.6
570
0.018
2.4
4.0
60
0.330
9.0
0.1
300
0.005
1.1
4.5
9.2
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area M
Hydraulic Length
Slope
*Velocity
TcM1
Tc Used
Lag Time
2250
0.009
1.7
22.1
25.0
0.25
ft
ft/ft
fps
min
min
hr
Area P
Hydraulic Length
Slope
*Velocity
TcP1
Tc Used
Lag Time
1050
0.038
3.5
5.0
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area R
Hydraulic Length
Slope
*Velocity
TcR1
Hydraulic Length
Slope
*Velocity
TcR2
Total TcR
Tc Used
Lag Time
510
0.078
4.2
2.0
450
0.022
2.2
3.4
5.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area U
Hydraulic Length
Slope
*Velocity
TcU1
Hydraulic Length
Slope
*Velocity
TcU2
Total TcU
Tc Used
Lag Time
1500
0.007
1.5
16.7
1380
0.073
4.2
5.5
22.1
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area X
Hydraulic Length
Slope
*Velocity
TcX1
Tc Used
Lag Time
1740
0.014
2.1
13.8
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area CC1
Hydraulic Length
Slope
*Velocity
TcCC1
Hydraulic Length
Slope
*Velocity
TcCC2
Total TcCC
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Z1
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
1050
0.005
1.2
14.6
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area Z3
Hydraulic Length
Slope
*Velocity
870 ft
0.005 ft/ft
1.2 fps
Area G
Hydraulic Length
Slope
*Velocity
TcG1
Hydraulic Length
Slope
*Velocity
TcG2
Total TcG
Tc Used
Lag Time
300
0.067
4.5
1.1
870
0.023
2.5
5.8
6.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area I
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
510
0.078
4.4
1.9
300
0.033
3.3
1.5
3.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area L
Hydraulic Length
Slope
*Velocity
TcL1
Hydraulic Length
Slope
*Velocity
TcL2
Hydraulic Length
Slope
*Velocity
TcL3
Hydraulic Length
Slope
*Velocity
TcL4
Total TcL
Tc Used
Lag Time
450
0.044
1.2
6.3
360
0.028
0.9
7.1
420
0.048
1.3
5.4
90
0.440
3.5
0.4
19.1
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area O
Hydraulic Length
Slope
*Velocity
TcO1
Hydraulic Length
Slope
*Velocity
TcO2
Total TcO
Tc Used
Lag Time
240
0.125
6.0
0.7
810
0.012
1.7
7.9
8.6
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area T
Hydraulic Length
Slope
*Velocity
TcT1
Tc Used
Lag Time
750
0.067
1.2
10.4
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area W
Hydraulic Length
Slope
*Velocity
TcW1
Hydraulic Length
Slope
*Velocity
TcW2
Total TcW
Tc Used
Lag Time
360
0.056
4.5
1.3
1110
0.049
3.4
5.4
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Y
Hydraulic Length
Slope
*Velocity
TcY1
Tc Used
Lag Time
150
0.133
1.6
1.6
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area BB
Hydraulic Length
Slope
*Velocity
TcBB1
Hydraulic Length
Slope
*Velocity
TcBB2
Total TcBB
Tc Used
Lag Time
900
0.005
1.3
11.5
750
0.067
4.5
2.8
14.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area EE
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
240
0.250
2.5
1.6
960
0.010
1.5
10.7
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area C
Hydraulic Length
Slope
*Velocity
TcC1
Hydraulic Length
Slope
*Velocity
TcC2
Total TcC
Tc Used
Lag Time
300
0.033
3.1
1.6
810
0.031
2.6
5.2
6.8
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area F
Hydraulic Length
Slope
*Velocity
TcF1
Hydraulic Length
Slope
*Velocity
TcF2
Hydraulic Length
Slope
*Velocity
TcF3
Total TcF
Tc Used
Lag Time
510
0.078
4.6
1.8
2400
0.017
2.2
18.2
150
0.200
7.0
0.4
20.4
25.0
0.25
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area K
Hydraulic Length
Slope
*Velocity
TcI1
Hydraulic Length
Slope
*Velocity
TcI2
Total TcI
Tc Used
Lag Time
200
0.167
7.5
0.4
510
0.029
0.9
10.0
10.4
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area N
Hydraulic Length
Slope
*Velocity
TcN1
Hydraulic Length
Slope
*Velocity
TcN2
Total TcN
Tc Used
Lag Time
1380
0.015
2.1
11.0
1200
0.049
3.7
5.4
16.4
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Q
Hydraulic Length
Slope
*Velocity
TcQ1
Hydraulic Length
Slope
*Velocity
TcQ2
Total TcQ
Tc Used
Lag Time
1110
0.018
2.4
7.7
720
0.028
3.0
4.0
11.7
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area S
Hydraulic Length
Slope
*Velocity
TcS1
Hydraulic Length
Slope
*Velocity
TcS2
Hydraulic Length
Slope
*Velocity
TcS3
Total TcF
Tc Used
Lag Time
420
0.007
1.5
4.7
210
0.238
2.4
1.5
960
0.031
2.6
6.2
12.3
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area V
Hydraulic Length
Slope
*Velocity
TcV1
Hydraulic Length
Slope
*Velocity
TcV2
Total TcV
Tc Used
Lag Time
450
0.089
1.5
5.0
600
0.050
3.4
2.9
7.9
15.0
0.15
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area AA
Hydraulic Length
Slope
*Velocity
TcAA1
Tc Used
Lag Time
570
0.088
5.0
1.9
15.0
0.15
ft
ft/ft
fps
min
min
hr
Area DD
Hydraulic Length
Slope
*Velocity
TcDD1
Hydraulic Length
Slope
*Velocity
TcDD2
Total TcDD
Tc Used
Lag Time
630
0.032
3.1
3.4
1200
0.005
1.5
13.3
16.7
20.0
0.20
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
min
hr
Area Z2
Hydraulic Length
Slope
*Velocity
TcZ1
Tc Used
Lag Time
1440
0.007
1.4
17.1
20.0
0.20
ft
ft/ft
fps
min
min
hr
540
0.005
1.5
6.0
0.10
ft
ft/ft
fps
min
hour
tB
Hydraulic Length
Slope
*Velocity
tB
tB
240
0.005
1.5
2.7
0.04
ft
ft/ft
fps
min
hour
tC
Hydraulic Length
Slope
*Velocity
tC
tC
810
0.025
2.7
5.0
0.1
ft
ft/ft
fps
min
hour
tD
Hydraulic Length
Slope
*Velocity
tD1
Hydraulic Length
Slope
*Velocity
tD2
Total tD
tD
300
0.025
2.7
1.9
280
0.005
1.2
3.9
5.7
0.10
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tE
Hydraulic Length
Slope
*Velocity
tE
tE
450
0.011
1.6
4.7
0.08
ft
ft/ft
fps
min
hour
tF
Hydraulic Length
Slope
*Velocity
tF
tF
900
0.067
4.5
3.3
0.06
ft
ft/ft
fps
min
hour
450
0.033
3.2
2.3
0.04
ft
ft/ft
fps
min
hour
tI
Hydraulic Length
Slope
*Velocity
tI1
Hydraulic Length
Slope
*Velocity
tI2
Total tD
tD
420
0.012
1.5
4.7
90
0.600
12.0
0.1
4.8
0.08
ft
ft/ft
fps
min
ft
ft/ft
fps
min
min
hour
tG
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
tH
Hydraulic Length
Slope
*Velocity
tH
tH
tJ
Hydraulic Length
Slope
*Velocity
tJ
tJ
300
0.100
5.0
1.0
0.02
ft
ft/ft
fps
min
hour
tK
Hydraulic Length
Slope
*Velocity
tK
tK
1200
0.033
2.6
7.7
0.13
ft
ft/ft
fps
min
hour
tL
Hydraulic Length
Slope
*Velocity
tL
tL
360
0.028
2.5
2.4
0.04
ft
ft/ft
fps
min
hour
tM
Hydraulic Length
Slope
*Velocity
tM
tM
720
0.014
1.8
6.7
0.11
ft
ft/ft
fps
min
hour
tN
Hydraulic Length
Slope
*Velocity
tN
tN
900
0.011
1.6
9.4
0.16
ft
ft/ft
fps
min
hour
tO
Hydraulic Length
Slope
*Velocity
tO
tO
1500
0.007
1.2
20.8
0.35
ft
ft/ft
fps
min
hour
tO1
Hydraulic Length
Slope
*Velocity
tO1
tO1
150
0.005
1.1
2.3
0.04
ft
ft/ft
fps
min
hour
tP
Hydraulic Length
Slope
*Velocity
tP
tP
300
0.017
2.0
2.5
0.04
ft
ft/ft
fps
min
hour
tQ
Hydraulic Length
Slope
*Velocity
tQ
tQ
450
0.060
3.7
2.0
0.03
ft
ft/ft
fps
min
hour
tR
Hydraulic Length
Slope
*Velocity
tR
tR
1650
0.006
1.3
21.2
0.35
ft
ft/ft
fps
min
hour
tS
Hydraulic Length
Slope
*Velocity
tS
tS
900
0.011
2.2
6.8
0.11
ft
ft/ft
fps
min
hour
tT
Hydraulic Length
Slope
*Velocity
tT
tT
1200
0.005
1.1
18.2
0.30
ft
ft/ft
fps
min
hour
tZ
Hydraulic Length
Slope
*Velocity
tG
tG
480
0.005
1.3
6.2
0.10
ft
ft/ft
fps
min
hour
Hydrologic Element
KS-E
KS-F
J-1
KS-G
King 36"
J-2
King 48"
KS-I
J-3
Div. at North St
King 48"/54"
KS-J
KS-K
KS-L
KS-M
J-8
Trumbull 24"
J-7
King 54"
KS-Q
J-9
King 54"/66"
KS-R
J-10
Div. at Main St
King 60"/66"
KS-T
J-12
King Street Old Mill River
KS-U
Old Mill River
KS-A
Brook Rail Trail
KS-B
J-4
Brook Woodmont Rd
KS-D
KS-C
J-5
Market 48"
KS-H
J-6
Market 44"/48"
KS-O
KS-P
KS-N
Market 18"/21"
J-11
Market 72"
KS-S
J-13
Market 82"
KS-W
KS-V
J-14
Market 60"
KS-X
J-15
Market Street Old Mill River
Location
Drainage Area
(mi2)
(ac)
0.0302
19.3
0.0278
17.8
0.0580
37.1
0.0394
25.2
0.0580
37.1
0.0973
62.3
0.0973
62.3
0.0249
16.0
0.1223
78.3
0.1223
78.3
0.1223
78.3
0.0258
16.5
0.0324
20.7
0.0425
27.2
0.0070
4.5
0.0820
52.4
52.4
0.0820
0.2300
147.2
0.2300
147.2
0.0386
24.7
0.2686
171.9
0.2686
171.9
0.0230
14.7
0.2916
186.6
0.2916
186.6
0.2916
186.6
0.0164
10.5
0.3079
197.1
0.3079
197.1
0.0119
7.6
0.0119
7.6
0.0707
45.2
0.0707
45.2
18.7
0.0293
0.0999
63.9
0.0999
63.9
0.0233
14.9
0.0145
9.3
0.1377
88.1
0.1377
88.1
0.0097
6.2
0.1474
94.4
0.1474
94.4
0.0480
30.7
0.0065
4.2
0.0357
22.8
0.0357
22.8
0.2376
152.1
0.2376
152.1
0.0370
23.7
0.2746
175.8
0.2746
175.8
0.0151
9.7
0.0049
3.1
0.2947
188.6
0.2947
188.6
0.0058
3.7
0.3004
192.3
0.3004
192.3
Tc
19
15
CN
95
83
15
87
15
92
15
15
15
15
89
88
85
84
15
94
15
96
15
97
15
95
34
78
27
75
31
15
92
83
15
89
19
20
26
89
90
82
16
89
15
15
90
96
15
85
2-year
10-year
25-year
100-year
(cfs)
46.8
31.8
78.3
52.5
73.3
100.4
98.9
38.8
114.3
114.3
112.8
36.7
44.6
52.7
8.4
105.7
103.8
184.0
183.2
63.1
229.7
225.1
39.1
243.0
232.8
218.0
28.4
221.9
221.9
19.9
19.9
47.1
45.4
18.7
53.3
52.9
27.8
16.6
66.5
66.0
13.8
68.9
68.0
63.5
8.7
32.1
29.7
137.1
120.5
51.7
133.3
128.6
22.2
8.4
133.6
130.5
7.1
131.5
131.5
(cfs)
56.7
41.6
97.8
66.6
91.6
125.6
123.9
47.8
142.9
142.9
141.2
46.0
56.3
67.9
10.9
135.0
132.6
234.0
232.8
76.9
289.7
283.8
47.2
305.4
235.4
229.4
34.1
234.9
234.9
24.1
24.1
64.1
61.8
26.2
72.5
72.1
34.3
21.7
89.0
88.3
17.3
90.8
89.9
79.6
10.9
42.3
39.2
193.5
189.3
64.8
199.2
198.0
27.7
10.1
202.7
202.2
9.2
203.3
203.3
(cfs)
70.4
55.4
125.2
86.5
117.2
161.1
158.8
60.2
182.9
182.9
181.0
59.0
72.6
89.2
14.4
176.2
173.0
304.1
302.4
95.9
373.8
366.1
58.4
392.8
285.2
282.5
42.0
289.1
289.1
30.0
30.0
88.8
85.5
37.2
100.6
99.9
43.3
29.0
121.5
120.7
22.2
123.6
122.5
102.1
13.9
56.8
52.6
263.0
260.9
83.2
272.2
271.2
35.3
12.5
276.6
275.7
12.1
277.0
277.0
(cfs)
97.7
83.4
180.0
126.2
168.4
232.0
228.8
84.9
263.0
183.1
183.1
84.9
105.2
132.2
21.5
258.9
253.8
443.9
441.4
133.7
541.7
529.8
80.6
567.1
285.2
285.2
57.8
296.8
296.8
41.6
41.6
139.9
134.7
60.4
158.7
157.7
61.0
43.6
188.8
187.4
31.9
264.6
255.6
146.7
19.8
86.4
80.0
543.3
534.9
119.5
558.2
553.7
50.4
17.2
563.1
558.5
17.9
560.6
560.6
Hydrologic Element
KS-E
KS-F
J-1
KS-G
King 36"
J-2
King 48"
KS-I
J-3
Div. at North St
King 48"/54"
KS-J
KS-K
KS-L
KS-M
J-8
Trumbull 24"
J-7
King 54"
KS-Q
J-9
King 54"/66"
KS-R
J-10
Div. at Main St
King 60"/66"
KS-T
J-12
King Street Old Mill River
KS-U
Old Mill River
KS-A
Brook Rail Trail
KS-B
J-4
Brook Woodmont Rd
KS-D
KS-C
J-5
Market 48"
KS-H
J-6
Market 44"/48"
KS-O
KS-P
KS-N
Market 18"/21"
J-11
Market 72"
KS-S
J-13
Market 82"
KS-W
KS-V
J-14
Market 60"
KS-X
J-15
Market Street Old Mill River
Location
Drainage Area
(mi2)
(ac)
0.0302
19.3
0.0278
17.8
0.0580
37.1
0.0394
25.2
0.0580
37.1
0.0973
62.3
0.0973
62.3
0.0249
16.0
0.1223
78.3
0.1223
78.3
0.1223
78.3
0.0258
16.5
0.0324
20.7
0.0425
27.2
0.0070
4.5
0.0820
52.4
52.4
0.0820
0.2300
147.2
0.2300
147.2
0.0386
24.7
0.2686
171.9
0.2686
171.9
0.0230
14.7
0.2916
186.6
0.2916
186.6
0.2916
186.6
0.0164
10.5
0.3079
197.1
0.3079
197.1
0.0119
7.6
0.0119
7.6
0.0707
45.2
0.0707
45.2
18.7
0.0293
0.0999
63.9
0.0999
63.9
0.0233
14.9
0.0145
9.3
0.1377
88.1
0.1377
88.1
0.0097
6.2
0.1474
94.4
0.1474
94.4
0.0480
30.7
0.0065
4.2
0.0357
22.8
0.0357
22.8
0.2376
152.1
0.2376
152.1
0.0370
23.7
0.2746
175.8
0.2746
175.8
0.0151
9.7
0.0049
3.1
0.2947
188.6
0.2947
188.6
0.0058
3.7
0.3004
192.3
0.3004
192.3
Tc
19
15
CN
95
83
15
87
15
92
15
15
15
15
89
88
85
84
15
94
15
96
15
97
15
95
34
78
27
75
31
15
92
83
15
89
19
20
26
89
90
82
16
89
15
15
90
96
15
85
2-year
10-year
25-year
100-year
(cfs)
46.8
34.4
80.8
52.5
75.7
102.8
101.2
38.8
116.7
116.7
115.0
36.7
44.6
56.6
9.1
110.3
108.3
188.9
188.0
63.1
234.7
229.9
39.1
247.8
234.2
217.5
28.4
221.2
221.2
19.9
19.9
51.7
49.8
19.7
58.0
57.7
27.8
18.0
71.4
70.9
15.1
72.8
72.2
69.4
8.7
32.1
29.7
144.3
135.5
56.5
149.1
144.2
24.8
8.4
149.4
145.9
8.2
147.0
147.0
(cfs)
56.7
44.3
100.5
66.6
94.0
128.2
126.4
47.8
145.4
145.4
143.5
46.0
56.3
71.9
11.6
139.8
137.3
239.2
237.8
76.9
295.0
288.9
47.2
310.5
239.0
232.7
34.1
238.2
238.2
24.1
24.1
69.1
66.6
27.3
77.8
77.3
34.3
23.2
94.4
93.7
18.6
96.1
95.3
85.4
10.9
42.3
39.2
199.2
195.8
69.6
206.1
205.0
30.2
10.1
210.3
209.7
10.3
211.0
211.0
(cfs)
70.4
58.2
127.9
86.5
119.7
163.7
161.4
60.2
185.5
183.1
182.5
59.0
72.6
93.4
15.1
181.2
177.8
309.4
307.7
95.9
379.3
371.4
58.4
398.1
285.2
283.2
42.0
289.8
289.8
30.0
30.0
94.3
90.8
38.5
106.4
105.7
43.3
30.4
127.5
126.6
23.4
129.6
128.4
107.7
13.9
56.8
52.6
269.9
267.6
87.7
281.4
279.6
37.6
12.5
287.4
286.1
13.2
287.8
287.8
(cfs)
97.7
86.3
182.8
126.2
171.0
234.7
231.4
84.9
265.6
183.1
183.1
84.9
105.2
136.3
22.2
263.7
258.5
449.1
446.6
133.7
547.1
535.0
80.6
572.3
285.2
285.2
57.8
297.0
297.0
41.6
41.6
146.0
140.5
61.9
165.0
164.0
61.0
45.1
195.3
193.8
33.0
272.0
262.8
151.8
19.8
86.4
80.0
554.9
546.3
123.6
570.1
565.5
52.5
17.2
575.3
570.4
19.0
572.6
572.6
Length
(ft)
400.0
300.0
300.0
390.0
Slope
(ft/ft)
0.025
0.003
0.007
0.018
Land Use
short grass
heavy wooded
grassed waterway
grassed waterway
V
(fps)
1.2
0.23
1.3
2
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
141
138
127.95
2063
34
34
Length
(ft)
100.0
200.0
950.0
Slope
(ft/ft)
0.030
0.055
0.002
Land Use
heavy wooded
grassed waterway
grassed waterway
V
(fps)
0.725
3.5
0.675
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
141
137
124
Elevation 1
(ft)
147
T
(s)
137.9
57.1
1407.4
1602
27
27
Length
(ft)
750.0
250.0
200.0
Slope
(ft/ft)
0.005
0.052
0.010
Land Use
V
(fps)
residential
grassed waterway
pavement
1.3
3.4
2
Total (s)
Total (min)
Use Tc = (min)
Location:
T
(s)
333.3
1304.3
230.8
195.0
T
(s)
576.9
73.5
100.0
750
13
15
Length
(ft)
1650.0
Slope
(ft/ft)
0.002
Land Use
pavement
Total (s)
Total (min)
Use Tc = (min)
V
(fps)
0.9
T
(s)
1833.3
1833
31
31
Length
(ft)
1600.0
Slope
(ft/ft)
0.005
Land Use
V
(fps)
pavement
1.4
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
176
145
1143
19
19
Length
(ft)
770.0
680.0
Slope
(ft/ft)
0.040
0.009
Land Use
V
(fps)
residential
pavement
3.5
1.9
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
167
149
Elevation 1
(ft)
140
T
(s)
220.0
357.9
578
10
15
Length
(ft)
600.0
620.0
Slope
(ft/ft)
0.030
0.017
Land Use
V
(fps)
residential
pavement
3
2.6
Total (s)
Total (min)
Use Tc = (min)
Location:
T
(s)
1142.9
T
(s)
200.0
238.5
438
7
15
Length
(ft)
1000.0
Slope
(ft/ft)
0.011
Land Use
pavement
Total (s)
Total (min)
Use Tc = (min)
V
(fps)
2.1
T
(s)
476.2
476
8
15
Length
(ft)
480.0
500.0
Slope
(ft/ft)
0.025
0.007
Land Use
residential
pavement
V
(fps)
2.75
1.7
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
150
138.21
469
8
15
Length
(ft)
600.0
500.0
Slope
(ft/ft)
0.020
0.007
Land Use
V
(fps)
residential
pavement
2.5
1.7
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
196
187
149.34
Elevation 1
(ft)
205
196
190
187
T
(s)
240.0
294.1
534
9
15
Length
(ft)
410.0
360.0
370.0
Slope
(ft/ft)
0.022
0.111
0.002
Land Use
V
(fps)
residential
residential
pavement
2.6
5
0.9
Total (s)
Total (min)
Use Tc = (min)
Location:
T
(s)
174.5
294.1
T
(s)
157.7
72.0
411.1
641
11
15
Length
(ft)
460.0
100.0
330.0
400.0
Slope
(ft/ft)
0.020
0.060
0.009
0.096
Land Use
short grass
short grass
pavement
pavement
Total (s)
Total (min)
Use Tc = (min)
V
(fps)
1
1.7
1.9
6.25
T
(s)
460.0
58.8
173.7
64.0
757
13
15
Length
(ft)
300.0
700.0
Slope
(ft/ft)
0.107
0.002
Land Use
V
(fps)
residential
pavement
T
(s)
6
0.9
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
138
135.46
128.81
828
14
15
Length
(ft)
530.0
800.0
100.0
Slope
(ft/ft)
0.005
0.008
0.003
Land Use
short grass
pavement
pavement
V
(fps)
0.5
1.9
1.25
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
137.7
130.08
Elevation 1
(ft)
137.6
135
T
(s)
1060.0
421.1
80.0
1561
26
26
Length
(ft)
1000.0
700.0
Slope
(ft/ft)
0.008
0.005
Land Use
V
(fps)
residential
pavement
1.6
1.4
Total (s)
Total (min)
Use Tc = (min)
Location:
50.0
777.8
T
(s)
625.0
500.0
1125
19
19
Length
(ft)
950.0
600.0
Slope
(ft/ft)
0.003
0.018
Land Use
residential
residential
Total (s)
Total (min)
Use Tc = (min)
V
(fps)
1
2.4
T
(s)
950.0
250.0
1200
20
20
Length
(ft)
650.0
350.0
Slope
(ft/ft)
0.015
0.015
Land Use
V
(fps)
pavement
pavement
2.5
2.5
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
137
127
125.82
T
(s)
260.0
140.0
400
7
15
Length
(ft)
650.0
150.0
750.0
Slope
(ft/ft)
0.015
0.008
0.004
Land Use
residential
pavement
pavement
Total (s)
Total (min)
Use Tc = (min)
V
(fps)
2.2
1.8
1.3
T
(s)
295.5
83.3
576.9
956
16
16
Elevation 2
(ft)
138.62
Length
(ft)
640.0
Slope
(ft/ft)
0.001
Land Use
pavement
V
(fps)
0.675
Total (s)
Total (min)
Total (hr)
T
(s)
948.1
948
16
0.263
Elevation 2
(ft)
134.82
Length
(ft)
620.0
Slope
(ft/ft)
0.006
Land Use
pavement
V
(fps)
1.6
Total (s)
Total (min)
Total (hr)
T
(s)
387.5
388
6
0.108
Elevation 2
(ft)
125.65
Length
(ft)
950.0
Slope
(ft/ft)
0.002
Land Use
grassed waterway
V
(fps)
0.675
Total (s)
Total (min)
Total (hr)
T
(s)
1407.4
1407
23
0.391
Elevation 2
(ft)
124
122
Length
(ft)
350.0
200.0
Slope
(ft/ft)
0.008
0.010
Land Use
grassed waterway
pavement
Total (s)
Total (min)
Total (hr)
10
V
(fps)
1.35
2
T
(s)
259.3
100.0
359
6
0.100
Elevation 2
(ft)
121.15
Length
(ft)
650.0
Slope
(ft/ft)
0.002
Land Use
V
(fps)
pavement
0.9
Total (s)
Total (min)
Total (hr)
T
(s)
722.2
722
12
0.201
Elevation 2
(ft)
134.7
Length
(ft)
700.0
Slope
(ft/ft)
0.000
Land Use
V
(fps)
pavement
0.7
Total (s)
Total (min)
Total (hr)
T
(s)
1000.0
1000
17
0.278
Trumbull Road
Elevation 1
(ft)
148.6
Elevation 2
(ft)
134.7
Length
(ft)
700.0
Slope
(ft/ft)
0.020
Land Use
V
(fps)
pavement
2.8
Total (s)
Total (min)
Total (hr)
T
(s)
250.0
250
4
0.069
Market 44"/48"
Elevation 1
(ft)
137.6
135
Elevation 2
(ft)
135
124
Length
(ft)
950.0
600.0
Slope
(ft/ft)
0.003
0.018
Land Use
residential
residential
V
(fps)
1
2.4
Total (s)
Total (min)
Total (hr)
T
(s)
950.0
250.0
1200
20
0.333
Market 18"/21"
Elevation 1
(ft)
128.81
Elevation 2
(ft)
126.9
Length
(ft)
1300.0
Slope
(ft/ft)
0.001
Land Use
pavement
Total (s)
Total (min)
Total (hr)
11
V
(fps)
0.675
T
(s)
1925.9
1926
32
0.535
Elevation 2
(ft)
134
Length
(ft)
250.0
Slope
(ft/ft)
0.003
Land Use
V
(fps)
pavement
1.3
Total (s)
Total (min)
Total (hr)
T
(s)
192.3
192
3
0.053
King 54"/66"
Elevation 1
(ft)
134
129.8
Elevation 2
(ft)
129.8
125
Length
(ft)
600.0
550.0
Slope
(ft/ft)
0.007
0.009
Land Use
V
(fps)
pavement
pavement
1.7
1.9
Total (s)
Total (min)
Total (hr)
T
(s)
352.9
289.5
642
11
0.178
King 60"/66"
Elevation 1
(ft)
126.6
126.2
Elevation 2
(ft)
126.2
123
Length
(ft)
600.0
550.0
Slope
(ft/ft)
0.001
0.006
0.049962825
Land Use
V
(fps)
pavement
pavement
0.7
1.6
Total (s)
Total (min)
Total (hr)
T
(s)
857.1
343.8
1201
20
0.334
Market 72"
Elevation 1
(ft)
115.72
Elevation 2
(ft)
112
Length
(ft)
1050.0
Slope
(ft/ft)
0.004
0.074285714
Land Use
pavement
Total (s)
Total (min)
Total (hr)
12
V
(fps)
1.3
T
(s)
807.7
808
13
0.224
Elevation 2
(ft)
108.05
Length
(ft)
800.0
Slope
(ft/ft)
0.005
0.105
Land Use
V
(fps)
pavement
1.4
Total (s)
Total (min)
Total (hr)
T
(s)
571.4
571
10
0.159
Market 60"
Elevation 1
(ft)
108.05
Elevation 2
(ft)
101.5
Length
(ft)
850.0
Slope
(ft/ft)
0.008
0.098823529
Land Use
pavement
Total (s)
Total (min)
Total (hr)
13
V
(fps)
1.4
T
(s)
607.1
607
10
0.169
(in)
(ft)
Area (ft2)
Manning's n
Bottom of Pipe
Top of Pipe
Slope
Qfull (cfs)
Centerline El.
Rim Elevation
Cd (for orifices)
Weir Length (ft)
60
5
19.63
0.013
113.40
118.40
0.006
202.28
115.90
125.00
0.6
55
36
3
7.07
0.013
116.37
119.37
0.005
47.29
117.87
125.00
0.6
50
Elevation
(ft)
113.4
113.6
113.8
114.0
114.2
114.4
114.6
114.8
115.0
115.2
115.4
115.6
115.8
116.0
116.2
116.4
116.6
116.8
117.0
117.2
117.4
117.6
117.8
118.0
118.2
118.4
118.6
118.8
119.0
119.2
119.4
119.6
119.8
120.0
120.2
120.4
120.6
120.8
Manning's Flow
d/D
Q/Qfull
Q
(cfs)
0.00
0.00
0.00
0.04
0.01
2.02
0.08
0.02
4.05
0.12
0.03
6.07
0.16
0.04
8.09
0.20
0.06
12.14
0.24
0.1
20.23
0.28
0.13
26.30
0.32
0.16
32.36
0.36
0.21
42.48
0.40
0.26
52.59
0.44
0.33
66.75
0.48
0.375
75.85
0.52
0.43
86.98
0.56
0.485
98.10
0.60
0.55
111.25
0.64
0.6
121.37
0.68
0.67
135.52
0.72
0.74
149.68
0.76
0.82
165.87
0.80
0.87
175.98
0.84
0.92
186.09
0.88
0.975
197.22
0.92
1
202.28
0.96
1.03
208.34
1.00
1
202.28
2.70
2.90
3.10
3.30
3.50
3.70
3.90
4.10
4.30
4.50
4.70
4.90
155.35
161.00
166.46
171.74
176.87
181.85
186.71
191.43
196.05
200.55
204.96
209.28
Weir Flow
h
Q
(ft)
(cfs)
Total
Q
(cfs)
0.00
2.02
4.05
6.07
8.09
12.14
20.23
26.30
32.36
42.48
52.59
66.75
75.85
86.98
98.10
111.25
121.37
135.52
149.68
165.87
175.98
186.09
197.22
202.28
208.34
202.28
155.35
161.00
166.46
171.74
176.87
181.85
186.71
191.43
196.05
200.55
204.96
209.28
14
Manning's Flow
d/D
Q/Qfull
0.07
0.13
0.20
0.27
0.33
0.40
0.47
0.53
0.60
0.67
0.73
0.80
0.87
0.93
1.00
0.02
0.03
0.06
0.125
0.17
0.26
0.36
0.45
0.55
0.66
0.745
0.87
0.95
1.02
1
Q
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.95
1.42
2.84
5.91
8.04
12.30
17.02
21.28
26.01
31.21
35.23
41.14
44.92
48.23
47.29
36 in Pipe - Diversion
Orifice Flow
h
Q
(ft)
(cfs)
1.73
1.93
2.13
2.33
2.53
2.73
2.93
44.77
47.28
49.67
51.95
54.14
56.24
58.26
Weir Flow
h
Q
(ft)
(cfs)
Total
Q
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.95
1.42
2.84
5.91
8.04
12.30
17.02
21.28
26.01
31.21
35.23
41.14
44.92
48.23
47.29
44.77
47.28
49.67
51.95
54.14
56.24
58.26
Grand
Total
Q
(cfs)
0.00
2.02
4.05
6.07
8.09
12.14
20.23
26.30
32.36
42.48
52.59
66.75
75.85
86.98
98.10
111.25
122.31
136.94
152.52
171.78
184.02
198.39
214.24
223.56
234.35
233.49
190.58
202.14
211.38
219.98
224.16
226.62
233.99
241.11
248.00
254.69
261.20
267.54
(in)
(ft)
Area (ft2)
Manning's n
Bottom of Pipe
Top of Pipe
Slope
Qfull (cfs)
Centerline El.
Rim Elevation
Cd (for orifices)
Weir Length (ft)
60
5
19.63
0.013
113.40
118.40
0.006
202.28
115.90
125.00
0.6
55
36
3
7.07
0.013
116.37
119.37
0.005
47.29
117.87
125.00
0.6
50
Elevation
(ft)
121.0
121.2
121.4
121.6
121.8
122.0
122.2
122.4
122.6
122.8
123.0
123.2
123.4
123.6
123.8
124.0
124.2
124.4
124.6
124.8
125.0
125.2
125.4
125.6
125.8
126.0
126.2
126.4
126.6
126.8
127.0
127.2
127.4
127.6
127.8
128.0
Manning's Flow
d/D
Q/Qfull
Q
(cfs)
Weir Flow
h
Q
(ft)
(cfs)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
12.99
36.73
67.48
103.90
145.20
190.87
240.52
Total
Q
(cfs)
213.51
217.65
221.72
225.72
229.64
233.50
237.30
241.04
244.72
248.34
251.91
255.44
258.91
262.34
265.73
269.07
272.37
275.63
278.86
282.05
285.20
285.20
285.20
285.20
285.20
285.20
285.20
285.20
285.20
298.18
321.93
352.68
389.09
430.40
476.07
525.72
15
Manning's Flow
d/D
Q/Qfull
Q
(cfs)
36 in Pipe - Diversion
Orifice Flow
h
Q
(ft)
(cfs)
3.13
60.21
3.33
62.11
3.53
63.95
3.73
65.73
3.93
67.47
4.13
69.17
4.33
70.82
4.53
72.44
4.73
74.02
4.93
75.57
5.13
77.09
5.33
78.58
5.53
80.04
5.73
81.47
5.93
82.88
6.13
84.27
6.33
85.63
6.53
86.97
6.73
88.29
6.93
89.60
7.13
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
90.88
Weir Flow
h
Q
(ft)
(cfs)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
11.81
33.39
61.35
94.45
132.00
173.52
218.66
267.15
318.77
373.35
430.73
490.78
553.39
618.46
685.89
Total
Q
(cfs)
60.21
62.11
63.95
65.73
67.47
69.17
70.82
72.44
74.02
75.57
77.09
78.58
80.04
81.47
82.88
84.27
85.63
86.97
88.29
89.60
90.88
102.69
124.27
152.23
185.33
222.88
264.40
309.54
358.03
409.65
464.23
521.61
581.67
644.27
709.34
776.77
Grand
Total
Q
(cfs)
273.72
279.76
285.67
291.45
297.11
302.67
308.12
313.47
318.74
323.91
329.00
334.01
338.95
343.81
348.61
353.34
358.00
362.61
367.15
371.64
376.08
387.88
409.47
437.43
470.53
508.08
549.60
594.74
643.23
707.84
786.16
874.29
970.76
1074.67
1185.41
1302.49
Area (ft2)
Manning's n
Bottom of Pipe
Top of Pipe
Slope
Qfull (cfs)
Centerline El.
Rim Elevation
Cd (for orifices)
Weir Length (ft)
48
4
12.57
0.013
123.66
127.66
0.0049
100.82
125.66
134.82
0.6
45
24
2
3.14
0.013
126.6
128.60
0.0099
22.57
127.60
134.82
0.6
30
Elevation
Manning's Flow
d/D
Q/Qfull
(ft)
123.7
123.9
124.1
124.3
124.5
124.7
124.9
125.1
125.3
125.5
125.7
125.9
126.1
126.3
126.5
126.7
126.9
127.1
127.3
127.5
127.7
127.9
128.1
128.3
128.5
128.7
128.9
129.1
129.3
129.5
129.7
129.9
130.1
130.3
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
0.00
0.01
0.02
0.04
0.06
0.1
0.145
0.2
0.265
0.33
0.4
0.47
0.55
0.64
0.7
0.79
0.87
0.94
0.99
1.03
1
Q
(cfs)
0.00
1.01
2.02
4.03
6.05
10.08
14.62
20.16
26.72
33.27
40.33
47.38
55.45
64.52
70.57
79.65
87.71
94.77
99.81
103.84
100.82
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
89.75
93.74
97.56
101.25
104.80
108.24
111.57
114.80
117.95
121.01
124.00
126.92
129.77
Weir Flow
h
Q
(ft)
(cfs)
Total
Q
(cfs)
0.00
1.01
2.02
4.03
6.05
10.08
14.62
20.16
26.72
33.27
40.33
47.38
55.45
64.52
70.57
79.65
87.71
94.77
99.81
103.84
100.82
89.75
93.74
97.56
101.25
104.80
108.24
111.57
114.80
117.95
121.01
124.00
126.92
129.77
16
Manning's Flow
d/D
Q/Qfull
Q
(cfs)
24 in Pipe - Diversion
Orifice Flow
h
Q
(ft)
(cfs)
Weir Flow
h
Q
(ft)
(cfs)
Total
Q
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Grand
Total
Q
(cfs)
0.00
1.01
2.02
4.03
6.05
10.08
14.62
20.16
26.72
33.27
40.33
47.38
55.45
64.52
70.57
79.65
87.71
94.77
99.81
103.84
100.82
89.75
93.74
97.56
101.25
104.80
108.24
111.57
114.80
117.95
121.01
124.00
126.92
129.77
Area (ft2)
Manning's n
Bottom of Pipe
Top of Pipe
Slope
Qfull (cfs)
Centerline El.
Rim Elevation
Cd (for orifices)
Weir Length (ft)
48
4
12.57
0.013
123.66
127.66
0.0049
100.82
125.66
134.82
0.6
45
24
2
3.14
0.013
126.6
128.60
0.0099
22.57
127.60
134.82
0.6
30
Elevation
Manning's Flow
d/D
Q/Qfull
(ft)
130.5
130.7
130.9
131.1
131.3
131.5
131.7
131.9
132.1
132.3
132.5
132.7
132.9
133.1
133.3
133.5
133.7
133.9
134.1
134.3
134.5
134.7
134.8
135.0
135.2
135.4
135.6
135.8
136.0
136.2
136.4
136.6
136.8
137.0
Q
(cfs)
Weir Flow
h
Q
(ft)
(cfs)
0.2
0.4
0.6
0.8
10.63
30.05
55.21
85.01
Total
Q
(cfs)
132.56
135.30
137.98
140.61
143.19
145.72
148.21
150.66
153.07
155.44
157.78
160.09
162.36
164.60
166.81
168.99
171.14
173.27
175.37
177.44
179.49
181.52
183.13
183.13
183.13
183.13
183.13
183.13
183.13
183.13
193.75
213.18
238.34
268.13
17
Manning's Flow
d/D
Q/Qfull
Q
(cfs)
24 in Pipe - Diversion
Orifice Flow
h
Q
(ft)
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Weir Flow
h
Q
(ft)
(cfs)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.20
7.08
20.04
36.81
56.67
79.20
104.11
131.19
160.29
191.26
224.01
258.44
Total
Q
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.08
20.04
36.81
56.67
79.20
104.11
131.19
160.29
191.26
224.01
258.44
Grand
Total
Q
(cfs)
132.56
135.30
137.98
140.61
143.19
145.72
148.21
150.66
153.07
155.44
157.78
160.09
162.36
164.60
166.81
168.99
171.14
173.27
175.37
177.44
179.49
181.52
183.13
190.21
203.16
219.94
239.80
262.33
287.24
314.32
354.04
404.45
462.35
526.57
Hydrologic Element
RR-A1
Gregory Ln DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
RR-A2
Matthew Dr DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Matthew Drive Route
RR-A3-1
RR Elem School
RR-B
J-1
Ryan Road Channel 1
RR-D
J-4
Ryan Road Channel 2
RR-G
J-5
Acrebrook Drive
Location
Gregory Lane
Matthew Lane
Drainage Area
(mi2)
(ac)
0.0455
29.1
0.0455
29.1
0.0248
0.0703
15.9
45.0
0.0703
0.0377
0.0377
0.0100
0.1179
0.1179
0.0378
0.1557
0.1557
0.0332
0.1888
0.1888
45.0
24.1
24.1
6.4
75.4
75.4
24.2
99.6
99.6
21.2
120.9
120.9
Tc
34
CN
56
16
50
45
59
15
63
19
60
15
71
2-year
10-year
25-year
100-year
(cfs)
5.3
2.1
5.3
2.1
282.7
0.3
288.0
1.2
2.3
2.6
2.3
280.2
0.2
284.0
2.3
5.6
5.6
3.5
7.0
7.0
8.9
11.6
11.5
21.0
25.1
25.1
(cfs)
10.6
2.9
10.6
2.9
283.6
0.5
288.0
3.3
3.3
5.0
3.3
280.9
0.3
284.0
3.3
10.2
10.2
5.8
13.5
13.4
16.1
20.2
20.1
30.6
40.3
40.3
(cfs)
20.2
3.2
20.2
3.2
285.1
1.3
288.0
8.4
4.1
9.9
4.1
281.7
0.6
284.0
4.1
18.0
18.0
9.5
24.5
24.1
27.9
34.9
34.8
45.1
64.9
64.9
(cfs)
44.1
3.8
44.1
3.8
288.0
3.2
288.0
23.1
5.6
24.6
5.6
283.7
1.3
284.0
10.8
36.6
36.5
17.8
48.1
47.4
55.8
70.5
70.3
76.4
121.5
121.5
Hydrologic Element
RR-A1
Gregory Ln DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
RR-A2
Matthew Dr DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Matthew Drive Route
RR-A3-1
RR Elem School
RR-B
J-1
Ryan Road Channel 1
RR-D
J-4
Ryan Road Channel 2
RR-G
J-5
Acrebrook Drive
Location
Gregory Lane
Matthew Lane
Drainage Area
(mi2)
(ac)
0.0455
29.1
0.0455
29.1
0.0248
0.0703
15.9
45.0
0.0703
0.0377
0.0377
0.0100
0.1179
0.1179
0.0378
0.1557
0.1557
0.0332
0.1888
0.1888
45.0
24.1
24.1
6.4
75.4
75.4
24.2
99.6
99.6
21.2
120.9
120.9
Tc
34
CN
56
16
54
45
60
15
63
19
60
15
71
2-year
10-year
25-year
100-year
(cfs)
5.3
2.1
5.3
2.1
282.7
0.3
288.0
2.6
2.6
3.1
2.6
280.2
0.2
284.0
2.6
6.3
6.3
3.5
8.3
8.2
8.9
11.9
11.8
21.0
25.1
25.1
(cfs)
10.6
2.8
10.6
2.8
283.6
0.6
288.0
6.0
3.5
6.6
3.5
281.1
0.4
284.0
3.5
11.1
11.1
5.8
15.5
15.3
16.1
20.7
20.6
30.6
40.4
40.4
(cfs)
20.2
3.1
20.2
3.1
285.1
1.3
288.0
12.6
4.4
13.6
4.4
282.1
0.7
284.0
4.4
19.2
19.1
9.5
26.2
25.9
27.9
35.8
35.7
45.1
65.1
65.1
(cfs)
44.1
3.8
44.1
3.8
288.0
3.2
288.0
29.2
6.0
30.8
6.0
284.3
1.5
284.0
11.3
38.1
38.1
17.8
50.2
49.5
55.8
72.4
72.2
76.4
122.1
122.1
Hydrologic Element
RR-A1
Gregory Ln DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
RR-A2
Matthew Dr DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Matthew Drive Route
RR-A3-1
RR Elem School
15" Pipe Outlet
RR-D
RR-B
J-1
Brierwood DB
Detention Basin (Inflow)
Detention Basin (Ouflow)
Maximum Stage (ft)
Peak Storage (acre-ft)
Top of Basin (ft)
Ryan Road Channel 2
RR-G
J-5
Acrebrook Drive
Location
Gregory Lane
Matthew Lane
At Elementary School
Brierwood Drive/Austin Circle Area
Penscal Drive Area
Detention Basin at Brierwood Drive
Drainage Area
(mi2)
(ac)
0.0455
29.1
0.0455
29.1
0.0248
0.0703
15.9
45.0
0.0703
0.0377
0.0377
0.1079
0.0378
0.0100
0.1557
0.1557
45.0
24.1
24.1
69.1
24.2
6.4
99.6
99.6
0.1557
0.0332
0.1888
0.1888
99.6
21.2
120.9
120.9
Tc
34
CN
56
16
54
45
60
19
15
60
63
15
71
2-year
10-year
25-year
50-year
(cfs)
5.3
2.1
5.3
2.1
282.7
0.3
288.0
2.6
2.6
3.1
2.6
280.2
0.2
284.0
2.6
6.3
6.3
7.2
8.9
3.5
14.9
6.4
14.9
6.4
272.8
1.4
175.0
6.4
21.0
21.1
21.1
(cfs)
10.6
2.8
10.6
2.8
283.6
0.6
288.0
6.0
3.5
6.6
3.5
281.1
0.4
284.0
3.5
11.1
11.1
13.5
16.1
5.8
26.6
11.7
26.6
11.7
272.3
1.9
175.0
11.7
30.6
30.8
30.8
(cfs)
20.2
3.1
20.2
3.1
285.1
1.3
288.0
12.6
4.4
13.6
4.4
282.1
0.7
284.0
4.4
19.2
19.1
22.4
27.9
9.5
46.7
22.4
46.7
22.4
274.0
2.6
175.0
22.3
45.1
46.0
46.0
(cfs)
29.9
3.5
29.9
3.5
286.9
2.4
288.0
19.3
5.2
20.9
5.2
283.0
1.0
284.0
5.2
26.9
26.9
31.0
39.3
12.9
67.0
32.9
67.0
32.9
274.8
3.3
175.0
32.8
58.3
60.7
60.7
Length
(ft)
430.0
370.0
350.0
210.0
370.0
Slope
(ft/ft)
0.170
0.078
0.029
0.114
0.100
Land Use
forest
forest
forest
forest
residential
V
(fps)
1.1
0.7
0.425
0.85
5.5
T
(s)
390.9
528.6
823.5
247.1
67.3
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
398
305
2057
34
34
Length
(ft)
440.0
350.0
Slope
(ft/ft)
0.211
0.057
Land Use
forest
forest
V
(fps)
1.25
0.6
T
(s)
352.0
583.3
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
398
305
295
290
284.33
279.33
278.33
(Note: Taken from drawings for Sawmill Hills and RR Elementary School.
Elevations were in NGVD and converted to NAVD88)
(Note: Taken from drawings for Sawmill Hills and RR Elementary School.
Elevations were in NGVD and converted to NAVD88)
935
16
16
Length
(ft)
500.0
400.0
200.0
250.0
33.0
360.0
215.0
Slope
(ft/ft)
0.186
0.025
0.025
0.023
0.152
0.003
0.005
Land Use
forest
forest
forest
pavement
short grassed
grassed waterway
pavement
V
(fps)
1.1
0.4
0.4
1.7
2.7
0.8
1.45
T
(s)
454.5
1000.0
500.0
147.1
12.2
450.0
148.3
Total (s)
Total (min)
Use Tc = (min)
(Note: Taken from drawings for Ryan Road and RR Elementary School.
Elevations were in NGVD and converted to NAVD88)
2712
45
45
5/26/2011
Location:
Elevation 1
(ft)
290
275
Length
(ft)
700.0
292.0
Slope
(ft/ft)
0.021
0.004
Land Use
residential
grassed waterway
V
(fps)
2.6
0.95
T
(s)
269.2
307.4
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
295
285
272.34
577
10
15
Length
(ft)
233.0
583.0
412.0
Slope
(ft/ft)
0.043
0.022
0.004
Land Use
short grassed
short grassed
grassed waterway
V
(fps)
1.4
1.1
0.95
T
(s)
166.4
530.0
433.7
Total (s)
Total (min)
Use Tc = (min)
Location:
Elevation 1
(ft)
316
305
299.02
(Note: Taken from drawings for Brierwood Drive and RR Elementary School.
Elevations were in NGVD and converted to NAVD88)
1130
19
19
Length
(ft)
292.0
210.0
675.0
Slope
(ft/ft)
0.038
0.028
0.034
Land Use
residential
pavement
pavement
V
(fps)
3.45
3.4
3.7
T
(s)
84.6
61.8
182.4
Total (s)
Total (min)
Use Tc = (min)
329
5
15
5/26/2011
Length
(ft)
990.0
Slope
(ft/ft)
0.022
Land Use
residential
V
(fps)
2.5
T
(s)
396.0
Total (s)
Total (min)
Use Tc = (min)
396
7
15
5/26/2011
Elevation 2
(ft)
270.94
Length
(ft)
875.0
Slope
(ft/ft)
0.0035
Land Use
V
(fps)
grassed waterway
0.9
Total (s)
Total (min)
Total (hr)
T
(s)
972.2
972
16
0.270
Channel 2
Elevation 1
(ft)
270.94
Elevation 2
(ft)
269.34
Length
(ft)
420.0
Slope
(ft/ft)
0.004
Land Use
grassed waterway
V
(fps)
0.95
Total (s)
Total (min)
Total (hr)
T
(s)
442.1
442
7
0.123
RR Elem School
Elevation 1
(ft)
277.33
Elevation 2
(ft)
273.9
Length
(ft)
230.0
Slope
(ft/ft)
0.015
Land Use
V
(fps)
grassed waterway
1.9
Total (s)
Total (min)
Total (hr)
T
(s)
121.1
121
2
0.034
Elevation 2
(ft)
284.33
279.33
278.33
277.33
273.9
Length
(ft)
35.0
33.0
360.0
215.0
230.0
Slope
(ft/ft)
0.029
0.152
0.003
0.005
0.015
Land Use
pavement
short grassed
grassed waterway
pavement
grassed waterway
Total (s)
Total (min)
Total (hr)
V
(fps)
3.4
2.7
0.8
1.45
1.9
T
(s)
10.3
12.2
450.0
148.3
121.1
742
12
0.206
5/26/2011
Appendix C
Pipe Capacity Analysis
Table
Bridge Street/Meadows Area
Pipe Capacity Analysis
12
12
12
12
12
12
12
12
12
12
12
12
12
12
13
13
13
13
13
13
12+13
12+13
12+13
12+13
12+13
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
20
21
22
23
24
Upstream (US)
ID
MH-1341
MH-1340
MH-327
MH-1342
MH-328
MH-1343
MH-329
MH-1344
MH-326
MH-325
MH-318
MH-317
MH-1942
MH-1954
MH-1831
MH-975
MH-1828
MH-1827
MH-1826
MH-1954
MH-1954
MH-1679
MH-1678
MH-1677
MH-1676
Downstream
(DS) ID
MH-327
MH-327
MH-1342
MH-1343
MH-1343
MH-329
MH-1344
MH-326
MH-325
MH-318
MH-317
MH-1942
MH-1954
-MH-975
MH-1828
MH-1827
MH-1826
MH-1954
--
MH-1679
MH-1678
MH-1677
MH-1676
Open Water
Location
Lincoln Ave
Day Ave
Day Ave
Day Ave
Day Ave
Sherman Ave
Sherman Ave
Sherman Ave
Coolidge Ave
Marshall Street
Marshall Street
Marshall Street
Marshall Street
Marshall Street
Industrial Drive
Industrial Drive
Industrial Drive
Industrial Drive
Industrial Drive
Industrial Drive
Marshall Street
Marshall Street
Water Street
Water Street
Water Street
Drain Line
Main
Day Ave
Main
Main
Day Ave
Sherman Ave
Sherman Ave
Sherman Ave
Coolidge Ave
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Invert Elev.
Pipe Length
Drainage
Area
(acres)
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
137.00
137.00
137.00
137.00
137.00
137.00
139.63
143.13
139.68
135.00
135.20
136.90
135.00
134.40
137.89
142.70
145.10
145.30
145.50
134.40
134.40
137.41
137.00
134.89
127.00
---------123.60
121.19
120.75
120.19
--127.51
125.25
122.74
121.90
119.70
119.70
118.06
116.85
112.62
--
383.00
183.00
279.00
196.00
167.00
125.00
183.00
125.00
221.00
106.00
96.00
128.00
67.00
-533.00
525.00
292.00
332.00
385.00
-296.00
220.83
71.00
37.50
--
-------------34.8
-----82.9
----117.7
-------------32.9
-----92.6
----125.5
-------------57.5
-----155.3
----212.8
-------------77.3
-----206.4
----283.7
-------------117.7
-----309.5
----427.2
Existing Pipes
Pipe Size
Manning
Pipe Mat'l
(in)
"n" value
12
10
12
12
8
15
15
15
15
18
24
24
24
24
36
48
48
48
48
48
48
48
42
42
42
AK/FH
AK/FH
AK/FH
AK/FH
AK/FH
VC
VC
VC
VC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
0.015
0.014
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Pipes Needed
Comments
Slope (ft/ft)
Existing** Peak
Rate of Runoff
(cfs)
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
0.01000
0.01000
0.01000
0.01000
0.01000
-0.02053
-0.01913
0.01746
0.01213
0.02274
0.00458
0.00438
0.00400
0.00400
0.00500
0.00430
0.00860
0.00253
0.00571
0.00571
0.00554
0.00548
0.05958
0.04320
0.04320
-------------57.5
-----155.3
----212.8
3.1
2.04
3.1
3.1
1.05
8.0
7.8
7.4
6.2
12.2
13.3
13.0
12.5
12.5
41.1
82.3
89.1
63.1
94.8
94.8
93.3
92.8
67.9
67.9
67.9
3.9
3.74
3.9
3.9
3.00
6.6
6.3
6.0
5.0
6.9
4.2
4.1
4.0
4.0
5.8
6.5
7.1
5.0
7.5
7.5
7.4
7.4
7.1
7.1
7.1
-------------59.5
-----160.4
----219.6
-------------63.6
-----176.9
----221.5
-12
18
24
12
24
30
30
36
36
42
42
42
42
-----60
66
66
66
66
66
-------------6.6
-----8.2
----9.2
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
11/18/2011
Table
Bridge Street/Meadows Area
Pipe Capacity Analysis
2
2
2
2
2
Fair
Fair
Fair
Fair
Fair
Fair
Fair
5
5
5
5
5
5
5
5
5
5
5
7
7
7
8
8
8
8
8
8
8
8
8
11
11
1
2
3
5
6
7
8
9
9
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
35
36
37
MH-308
MH-309
MH-1729
Junct. A
MH-1647
IN-3330
IN-3332
IN-3333
Junct. B
IN-3334
MH-1649
Junct. C
MH-1650
MH-1651
IN-3347
IN-3346
IN-3353
MH-1658
IN-3352
MH-1619
MH-1621
MH-1814
Wetland
MH-1622
MH-994
Junct. E
MH-995
MH-1669
MH-1668
MH-1667
MH-1666
MH-1660
MH-1665
Sub-Basin 8
Junct. F
MH-957
OUT-57
Downstream
(DS) ID
MH-309
MH-1729
MH-1647
-IN-3330
IN-3332
IN-3333
IN-3334
-MH-1649
MH-1650
-MH-1651
IN-3347
IN-3346
IN-3353
MH-1658
IN-3352
MH-1619
MH-1621
MH-1814
MH-1622
-MH-994
MH-995
-MH-1669
MH-1668
MH-1667
MH-1666
MH-1660
MH-1665
MH-957
--OUT-57
--
Location
Lincoln Ave
Lincoln Ave
Bridge Street
MH-1647
Old Ferry Road
Fairgrounds
Fairgrounds
Fairgrounds
IN-3332
Fairgrounds
Fairgrounds
MH-1650
Bridge Street Parallel
Pomeroy Terrace Parallel
Pomeroy Terrace Parallel
Bridge Street Parallel
Pomeroy Terrace Parallel
Pomeroy Terrace Parallel
Pomeroy Terrace Parallel
Pomeroy Terrace Parallel
Pomeroy Terrace Parallel
Pomeroy Terrace Parallel
MH-1622
Williams Street Parallel
Williams Street Parallel
MH-995
Williams Street Parallel
Williams Street Parallel
Williams Street Parallel
Williams Street Parallel
Williams Street Parallel
Williams Street Parallel
Williams Street Parallel
MH-957
MH-957
Williams Street Parallel
Junct. G
Drain Line
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Invert Elev.
Pipe Length
147.00
137.00
137.00
122.22
122.22
119.12
118.24
118.00
118.24
117.92
119.90
119.90
121.72
118.53
116.38
116.78
116.57
117.44
115.01
114.47
114.87
112.50
112.50
111.84
115.05
115.05
114.24
112.69
111.97
110.85
112.63
114.73
114.32
112.18
112.18
112.18
108.00
---116.42
116.42
115.52
114.84
114.85
114.84
114.92
114.70
114.70
113.82
113.23
113.78
112.68
111.42
110.84
109.71
109.37
108.67
109.30
109.30
108.14
107.10
107.10
106.24
106.12
106.12
105.45
105.63
-104.52
101.78
101.78
101.78
101.64
320.00
629.17
401.50
--
425.41
91.47
115.15
119.85
-37.06
373.67
--
217.83
239.77
86.68
210.21
132.46
378.96
364.49
278.30
197.11
279.22
--
249.39
30.16
--
350.79
242.44
230.14
247.72
221.91
279.17
144.98
--173.43
--
Drainage
Area
(acres)
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
---44.6
----49.8
--60.1
---
---41.9
----50.9
--54.8
---
---75.7
----96.0
--102.2
---
---103.6
----132.9
--141.3
---
---161.3
----209.1
--221.6
---
-------180.6
--190.6
-------210.0
230.8
-233.1
-------9.6
--12.8
-------19.3
38.2
-39.1
-------32.1
--32.8
-------40.8
72.0
-73.6
-------107.7
--105.5
-------98.7
104.4
-104.6
-------277.5
--273.2
-------232.3
243.1
-243.7
Existing Pipes
Pipe
Size (in)
Pipe
Mat'l
12
15
18
18
18
18
18
18
18
18
18
18
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
Tile
AK/FH
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
RC
VC
VC
VC
VC
VC
VC
VC
VC
RC
RC
RC
RC
RC
Manning
Slope (ft/ft)
"n" value
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.03125
0.03403
0.03681
0.03681
0.00212
0.00634
-0.00009
-0.00058
-0.00058
0.00594
0.00236
0.00236
0.00271
-0.00229
0.01154
0.00599
0.00438
0.00298
0.00093
0.00252
-0.00320
0.00398
0.00398
0.00397
0.02851
0.02851
0.00034
-0.09335
0.00291
-0.00113
0.00410
0.00294
0.01062
0.00294
0.01062
0.00081
0.00081
Existing**
Peak Rate of
Runoff (cfs)
---75.7
----96.0
--102.2
---------32.1
--32.8
-------40.8
72.0
-73.6
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
5.5
10.4
12.2
12.2
4.2
7.3
0.9
2.2
2.2
7.0
4.4
4.4
10.3
9.4
21.2
15.3
13.0
10.8
6.0
9.9
11.1
12.4
12.4
12.4
21.8
21.8
3.6
21.8
10.6
6.6
12.6
10.7
20.3
10.7
20.3
5.6
5.6
7.0
8.4
6.9
6.9
2.4
4.1
0.5
1.3
1.3
4.0
2.5
2.5
3.3
3.0
6.7
4.9
4.2
3.4
1.9
3.1
3.5
4.0
4.0
4.0
6.9
6.9
1.2
6.9
3.4
2.1
4.0
3.4
6.5
3.4
6.5
1.8
1.8
---80.2
----80.3
--87.7
----------41.3
--41.7
-------36.7
68.6
-70.4
---104.8
----81.2
--95.4
----------42.1
--53.8
-------53.8
76.8
-76.8
--48
48
----66
--54
----------36
--36
----30
30
30
36
42
42
42
---6.4
----3.4
--6.0
----------5.9
--5.9
-------5.2
7.1
-7.3
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
11/18/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
6
7
8
8
9
10
11
12
13
14
15
21
22
25
26
MH-401
MH-403
MH-404
MH-405
MH-406
MH-1555
MH-412
MH-414
MH-415
MH-423
MH-422
MH-421
MH-2234
MH-1477
OUT-150
Downstream
(DS) (ID)
MH-403
MH-404
MH-405
MH-406
MH-1555
MH-423
MH-414
MH-415
MH-1555
MH-422
MH-421
MH-2234
MH-1477
OUT-150
--
Location
Drain Line
S Main Street
S Main Street
S Main Street
S Main Street
S Main Street
S Main Street
Beacon Street
Beacon Street
Beacon Street
S Main Street
S Main Street
S Main Street
S Main Street
S Main Street
S Main Street
Main
Main
Main
Main
Main
Main
Beacon Street
Beacon Street
Beacon Street
Main
Main
Main
Main
Main
Main
Existing Pipes
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
269.25
268.64
267.73
266.53
263.55
255.98
275.00
275.00
266.50
256.09
238.01
217.02
200.38
193.60
169.13
----------------
210.49
255.00
265.00
161.00
337.00
35.00
535.00
270.00
278.00
514.00
480.00
405.00
110.46
233.78
--
--------------68.4
--------------25.1
--------------62.5
--------------96.2
--------------170.3
10
10
10
10
10
15
10
10
10
10
15
15
15
18
24
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
VC
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing** Peak
Slope (ft/ft) Rate of Runoff
(cfs)
0.0012
0.0058
0.0058
0.0185
0.0225
0.0390
0.0100
0.0144
0.0379
0.0352
0.0509
0.0362
0.0578
0.1052
0.1052
--------------62.5
Pipes Needed
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
0.7
1.4
1.4
2.6
2.9
11.1
1.90
2.28
3.70
3.6
8.5
10.7
8.5
12.2
21.8
1.2
2.6
2.6
4.7
5.2
9.0
3.49
4.18
6.79
6.5
6.9
8.7
6.9
6.9
6.9
Future** Peak
Pipe Capacity Pipe Size
Rate of Runoff
(cfs)
(in)
(cfs)
--------------66.10
--------------76.8
12
12
12
12
12
-12
12
12
12
----42
Comments
Pipe
Velocity
(ft/s)
--------------6.9
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
Sub_
Basin
X
X
X
X
X
X
X
X
X
Y
Y
Y
Y
Y
Y+X
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
MH-1589
MH-1590
MH-1586
MH-1587
MH-1585
MH-1584
MH-1583
MH-1362
MH-1361
MH-1361
MH-1360
MH-1380
MH-1812
MH-992
OUT-149
Downstream
(DS) ID
MH-1590
MH-1586
MH-1587
MH-1585
MH-1584
MH-1583
MH-1362
MH-1361
-MH-1360
MH-1380
MH-1812
MH-992
OUT-149
--
Location
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
North Elm
Drain Line
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Existing Pipes
Pipes Needed
Comments
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
Slope (ft/ft)
Existing** Peak
Rate of Runoff
(cfs)
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
231.50
229.23
226.00
226.00
217.91
216.81
217.72
200.61
199.60
199.60
196.00
196.00
173.46
167.00
167.00
----------------
75.00
235.00
54.00
278.00
70.00
32.00
1209.00
38.88
155.83
155.83
59.77
289.00
118.00
43.00
--
--------17.0
-----25.5
--------11.8
-----18.3
--------24.7
-----37.0
--------35.8
-----53.0
--------59.5
-----87.2
12
12
12
12
12
12
10
15
15
15
15
15
15
15
18
RCP
RCP
RCP
RCP
RCP
RCP
Conc
VC
VC
VC
VC
VC
VC
VC
Cast Iron
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.0182
0.0137
0.0197
0.0291
0.0157
-0.0284
0.0142
0.0158
0.0231
0.0231
0.0010
0.0780
0.0362
0.0010
0.0100
--------24.7
-----13.0
4.2
3.6
4.3
5.3
3.9
5.2
2.3
7.1
8.5
8.5
1.8
8.5
10.7
1.8
9.1
5.3
4.6
5.5
6.7
4.9
6.6
4.2
5.7
7.0
7.0
1.4
6.9
8.7
1.4
5.2
--------24.7
-----37.0
--------21.4
-----22.6
------12
24
24
24
24
24
24
24
24
--------7.9
-----7.2
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
Sub_
Basin
Z
Z
Z
Z
1
2
3
4
MH-468
MH-456
MH-458
MH-986
Downstream
(DS) ID
MH-456
MH-986
MH-456
--
Location
Milton Street
Milton Street
Riverside Drive
Riverside Drive
Drain Line
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
167.00
167.00
167.00
167.00
-----
268.28
80.00
171.00
--
---5.8
Main
Main
Side Street
Main
Existing Pipes
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
---4.0
---8.2
---11.7
---19.1
12
12
12
12
Conc
Conc
Conc
Conc
0.015
0.015
0.015
0.015
Pipes Needed
Existing**
Slope (ft/ft) Peak Rate of
Runoff (cfs)
0.0100
0.0100
0.0100
0.0100
---8.2
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future**
Peak Rate
of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
3.1
3.1
3.1
3.1
3.9
3.9
3.9
3.9
---8.2
---10.5
48
48
18
18
---5.9
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Upstream (US) ID
Downstream
(ID)
MH-172
MH-410
MH-2411
MH-1510
MH-1568
MH-1569
MH-1556
MH-408
MH-1570
MH-1571
MH-1574
MH-1397
MH-1398
OUT-127
OUT-128
MH-1581
MH-1582
MH-1580
MH-1579
MH-1578
MH-1577
MH-1575
MH-1319
MH-1474
MH-1320
MH-1398
MH-876
MH-1318
MH-2186
MH-1475
IN-3045
MH-2411
MH-2411
MH-1510
MH-1568
MH-1569
MH-1556
MH-408
MH-1570
MH-1571
MH-1574
MH-1397
MH-1398
OUT-128
--MH-1582
MH-1580
MH-1579
MH-1578
MH-1577
MH-1575
MH-1319
MH-1474
MH-1320
MH-1398
-MH-1318
MH-2186
MH-1475
IN-3045
--
Location
Main Street
Main Street
Chestnut Street
Main Street
Main Street
Main Street
Main Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street
Locust Street Parallell - II
Locust Street Parallell - II
Locust Street Parallell - II
Locust Street
Drain Line
Side Street
Side Street
Side Street
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Locust Street
Locust Street
Locust Street
Locust Street
Main
Invert Elev.
Pipe Length
Drainage
Area
(acres)
275.00
275.00
275.00
271.28
271.53
261.44
291.27
254.63
249.71
240.73
224.68
211.16
206.71
196.89
196.99
236.00
236.00
236.00
236.00
236.00
236.00
235.13
229.18
220.11
211.57
206.00
230.42
227.00
225.10
221.00
206.00
----263.72
255.13
-249.36
241.04
235.03
218.63
205.31
195.71
188.31
188.41
-------223.31
214.06
205.60
-225.69
221.81
220.15
216.17
--
268.25
20.00
329.95
299.66
582.00
166.00
21.46
124.00
180.00
315.00
320.00
330.00
38.00
--141.61
105.00
91.21
209.24
118.03
195.00
198.51
249.00
290.00
323.00
-154.00
63.00
98.00
600.00
--
--------------23.0
----------26.4
----8.8
Existing Pipes
2-YR Storm
10-YR
25-YR
100-YR
Pipe Size
(cfs)
Storm (cfs) Storm (cfs) Storm (cfs)
(in)
--------------16.0
----------22.5
----7.5
--------------32.3
----------43.9
----14.6
--------------46.3
----------61.9
----20.6
--------------75.7
----------99.7
----33.2
8
8
8
10
18
18
12
12
12
15
15
18
42
8
36
12
10
10
10
10
15
15
18
18
24
24
8
8
8
8
24
Pipes Needed
Comments
Pipe Mat'l
Manning
"n" value
Slope (ft/ft)
Existing**
Peak Rate of
Runoff (cfs)
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of Runoff
(cfs)
Pipe Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
VC
VC
VC
RC
RCP
RC
RC
RCP
RCP
RCP
RCP
RCP
RCP
CI
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
VC
VC
VC
VC
RCP
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.0121
0.0121
0.0121
0.0068
0.0148
0.0308
0.0308
0.0671
0.0455
0.0521
0.0416
0.0291
0.1921
-0.1921
0.0812
0.0812
0.0812
0.0812
0.0812
0.0182
0.0300
0.0371
0.0292
0.0306
0.0306
0.0252
0.0263
0.0406
0.1843
0.0306
--------------32.3
----------43.9
----14.6
1.2
1.2
1.2
1.6
11.1
12.2
5.4
5.4
5.4
8.5
8.5
12.2
67.9
-49.6
5.4
3.7
3.7
3.7
3.7
7.6
9.7
12.2
12.2
21.8
21.8
1.7
1.7
2.1
2.4
21.8
3.3
3.3
3.3
2.9
6.3
6.9
6.9
6.9
6.9
6.9
6.9
6.9
7.1
-7.0
6.9
6.9
6.9
6.9
6.9
6.2
7.9
6.9
6.9
6.9
6.9
4.8
4.9
6.1
6.9
6.9
--------------38.2
----------43.9
----14.6
--------------53.8
----------53.8
----21.4
12
12
12
12
----------36
-12
12
12
12
-----36
12
12
12
12
24
--------------5.4
----------6.2
----4.7
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
Sub_B
asin
M
M
M
M
M
M
M
O
O
O
O
1
2
4
5
6
7
9
11
12
13
14
MH-652
MH-653
MH-2037
MH-2036
MH-925
MH-2038
MH-2040
MH-2040
MH-2039
MH-924
OUT-124
Downstream
(DS) ID
MH-653
MH-2036
MH-925
MH-2037
MH-2038
MH-2040
-MH-2039
MH-924
OUT-124
--
Location
Bikeway
Bikeway
Bikeway
Bikeway
Bikeway
Bikeway
Branch #2/ North
Branch #1/ East
Branch #1/ East
Branch #1/ East
Branch #1/ East
Drain Line
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
275.00
275.00
275.00
275.00
265.60
265.00
251.41
251.41
250.39
234.39
223.52
------------
128.76
42.92
226.75
213.16
684.78
761.83
-42.92
276.92
21.46
--
------23.0
---26.0
Existing Pipes
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
------6.2
---7.8
------17.5
---21.2
------28.1
---33.8
------51.9
---62.0
10
10
18
15
18
24
24
30
30
30
30
Conc
Conc
Conc
Conc
RCP
Conc
Conc
Conc
Conc
Conc
Conc
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing**
Slope (ft/ft) Peak Rate of
Runoff (cfs)
0.0414
0.0414
0.0414
0.0140
0.0140
0.0178
0.0178
0.0238
0.0953
0.5066
0.5066
------17.5
---53.7
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future**
Peak Rate
of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
3.9
3.9
12.2
6.7
10.8
26.3
26.3
34.3
34.3
34.3
34.3
7.1
7.1
6.9
5.4
6.1
8.4
8.4
7.0
7.0
7.0
7.0
------19.8
---23.5
------21.4
---35.5
------24
---30
------6.3
---4.8
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
Sub_
Basin
F
F
F
F
F
F
F
15
16
18
19
20
21
22
MH-719
MH-713
MH-715
MH-716
MH-1426
MH-1333
OUT-183
Downstream
(DS) ID
MH-713
MH-715
MH-716
MH-1426
MH-1333
OUT-183
--
Location
Drain Line
Side Street
Main
Main
Main
Main
Main
Main
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
254.94
250.46
248.38
245.40
243.64
223.23
216.00
--------
219.97
397.01
241.43
255.00
150.22
32.19
--
------31.0
Existing Pipes
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
------25.5
------47.2
------65.1
------102.5
12
12
12
12
12
12
12
Conc
Conc
Conc
Conc
Conc
Conc
Conc
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing**
Slope (ft/ft) Peak Rate of
Runoff (cfs)
0.0204
0.0052
0.0123
0.0051
0.1359
0.2246
0.2246
------47.2
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future**
Peak Rate
of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
4.4
2.2
3.4
2.2
5.4
5.4
5.4
5.6
2.8
4.4
2.8
6.9
6.9
6.9
------49.0
------53.8
18
24
24
36
36
36
36
------6.9
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
Sub_Bas
Order
in
B
B
B
B
B
B
B
B
B
1
2
3
4
5
6
7
8
9
Upstream (US) ID
MH-680
MH-691
MH-690
MH-689
MH-710
MH-711
MH-2251
MH-1424
OUT-195
Downstream
(DS) ID
MH-691
MH-690
MH-689
MH-710
MH-2251
MH-2251
MH-1424
OUT-195
--
Location
Drain Line
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
Main
Main
Main
Main
Main
Side Street
Main
Main
Main
319.83
310.50
300.88
278.88
274.00
275.00
278.63
273.21
265.45
310.40
303.10
293.10
267.33
266.23
-----
186.00
112.00
236.50
80.00
15.00
214.00
123.00
407.00
--
--------27.7
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
Existing Pipes
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
--------11.8
--------29.0
--------45.3
--------81.4
12
12
12
12
12
12
12
12
15
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
RCP
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing**
Slope (ft/ft) Peak Rate of
Runoff (cfs)
0.0387
0.0884
0.1085
0.0125
0.0153
-0.0169
0.1072
0.0191
0.0191
--------29.0
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future**
Peak Rate
of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
6.1
5.4
5.4
3.5
3.8
4.0
5.4
4.3
7.8
7.8
6.9
6.9
4.4
4.9
5.1
6.9
5.4
6.3
--------29.9
--------31.2
18
18
18
18
18
24
24
24
24
--------9.9
Table
Elm Street Brook Area
Pipe Capacity Analysis
A
A
A
A
A
A
A
1
2
3
4
5
6
7
MH-684
MH-685
MH-686
MH-687
MH-1369
MH-688
MH-1559
MH-685
MH-686
MH-687
MH-688
MH-688
MH-1559
--
Location
Drain Line
Side Street
Side Street
Main
Main
Side Street
Main
Main
Existing Pipes
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
Pipe Size
(in)
Pipe Mat'l
Manning
"n" value
292.27
279.41
274.84
265.00
270.27
262.69
261.51
279.60
266.70
------
322.00
68.00
447.11
191.00
396.00
304.20
--
------27.1
------17.5
------37.5
------55.0
------92.5
12
12
12
12
12
12
15
RCP
RCP
Concrete
Concrete
Concrete
Concrete
Concrete
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing**
Slope (ft/ft) Peak Rate of
Runoff (cfs)
0.0401
0.0672
0.0220
0.0121
0.0191
0.0039
0.0039
------37.5
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future**
Peak Rate of
Runoff (cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
6.2
5.4
4.6
3.4
4.3
1.9
3.5
7.9
6.9
5.8
4.3
5.5
2.5
2.9
------39.4
------35.5
18
18
18
18
18
30
30
------8.0
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
Elm Street Brook Area
Pipe Capacity Analysis
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
BB
BB
BB
BB
BB
1
2
7
9
12
13
14
15
16
17
18
19
20
21
22
23
27
28
29
30
31
Upstream (US) ID
MH-2233
MH-342
MH-341
MH-435
MH-436
MH-461
MH-1351
MH-2078
MH-467
MH-466
MH-465
MH-464
MH-2079
MH-803
MH-1352
OUT-146
MH-385
MH-386
MH-387
MH-381
OUT-81
Downstream
(DS) ID
MH-342
MH-341
MH-435
MH-436
MH-461
MH-1351
MH-2078
MH-2079
MH-466
MH-465
MH-464
MH-2079
MH-803
MH-1352
OUT-146
-MH-386
MH-387
MH-381
OUT-81
--
Location
Drain Line
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Milton Street
Milton Street
Milton Street
Milton Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Federal Street
Main
Main
Main
Main
Main
Main
Main
Main
Milton Street
Milton Street
Milton Street
Milton Street
Main
Main
Main
Main
Main
Main
Main
Main
Main
Invert Elev.
Pipe Length
Drainage
Area
(acres)
2-YR
Storm
(cfs)
10-YR
Storm
(cfs)
25-YR
Storm
(cfs)
100-YR
Storm
(cfs)
187.00
174.71
169.31
170.60
173.76
-166.29
165.34
160.94
159.25
159.28
158.96
160.61
150.50
152.58
151.78
202.52
199.26
175.50
155.13
152.74
175.72
173.96
169.18
162.12
156.55
155.37
157.60
151.80
---152.11
150.85
151.50
144.43
142.70
------
240.00
55.00
270.00
80.00
252.00
307.00
240.00
270.00
390.00
52.03
379.85
48.15
105.00
420.00
180.00
-48.00
294.00
330.00
75.00
--
---------------76.5
----19.8
---------------53.0
----28.8
---------------111.2
----47.3
---------------206.6
----61.9
---------------268.3
----91.1
Existing Pipes
Manning
Pipe Size
Pipe Mat'l
"n" value
(in)
15
15
15
20
18
18
18
18
8
12
12
12
18
18
18
18
10
10
10
10
10
RC
RC
RC
VC
VC
VC
VC
VC
Conc
PCCP
PCCP
PCCP
VC
VC
VC
PCCP
Conc
Conc
Conc
Conc
Conc
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing** Peak
Slope (ft/ft) Rate of Runoff
(cfs)
0.0321
0.0321
0.0221
0.0696
0.0047
0.0101
0.0125
0.0170
0.0325
0.0044
0.0008
-0.0343
0.0030
0.0065
0.0047
0.0047
0.9873
0.1582
0.0617
0.0118
0.0118
---------------111.20
----47.30
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
10.06
10.06
8.35
15.11
6.25
9.19
10.22
11.92
1.89
2.05
0.90
5.73
5.01
7.37
6.27
6.27
3.75
3.75
4.73
2.06
2.06
8.20
8.20
6.81
6.93
3.54
5.20
5.78
6.74
5.41
2.60
1.14
7.30
2.83
4.17
3.55
3.54
6.87
6.87
8.67
3.79
3.79
---------------116.50
----48.70
---------------7.2
----53.8
--24
24
36
48
48
48
48
48
48
48
---18
36
36
36
36
36
---------------4.1
----6.9
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
7/21/2011
Table
King Street/Market Street Area
Pipe Capacity Analysis
M
M
M
M
K
K
K
K
K
K
K
K
K
K
K
K
K
J
J
J
J
J
J
J
1
2
3
4
1
2
3
4
5
7
8
9
11
12
14
15
16
20
21
22
23
24
25
26
Upstream (US)
ID
MH-2029
MH-1293
MH-1292
MH-1291
MH-1041
MH-1040
MH-1039
MH-1038
MH-1037
MH-1035
MH-1034
MH-1033
MH-1030
MH-1029
MH-1028
MH-1026
MH-1291
MH-1291
MH-1742
MH-1741
MH-1739
MH-1744
MH-1160
MH-1159
Downstream
(DS) ID
MH-1293
MH-1292
MH-1291
-MH-1040
MH-1039
MH-1038
MH-1037
MH-1035
MH-1034
MH-1033
MH-1030
MH-1029
MH-1028
MH-1026
MH-1291
-MH-1742
MH-1741
MH-1739
MH-1744
MH-1160
MH-1159
--
Location
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
State Street
Trumbull Road
Trumbull Road
Trumbull Road
Trumbull Road
Trumbull Road
Trumbull Road
Trumbull Road
Drain Line
Invert Elev.
Pipe Length
Drainage
Area
(acres)
147.10
153.64
147.08
148.37
155.98
149.16
148.06
147.14
147.46
147.46
147.33
147.12
146.77
146.49
146.45
145.93
148.60
148.60
137.88
138.09
135.27
131.76
134.39
134.79
141.50
140.69
139.88
140.09
149.64
143.84
142.46
141.67
141.04
141.01
140.98
140.80
140.66
140.69
140.79
140.53
140.09
140.09
132.88
132.29
130.86
126.62
122.30
120.35
166.59
316.70
275.00
-252.00
106.00
138.21
173.00
40.00
23.00
125.00
50.00
67.00
50.00
183.33
230.00
-251.00
4.00
122.00
196.00
124.00
19.00
--
---4.5
------------20.7
------52.5
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Existing Pipes
Manning
2-YR Storm
10-YR
25-YR
100-YR
Pipe Size
Pipe Mat'l
"n" value
(cfs)
Storm (cfs) Storm (cfs) Storm (cfs)
(in)
---8.4
------------44.6
------105.7
---10.4
------------56.3
------135.0
---14.4
------------72.6
------176.2
---21.5
------------105.2
------258.9
8
8
8
8
12
12
16
18
18
18
18
18
21
21
24
24
24
24
24
24
24
36
36
36
DI
DI
DI
DI
Clay
RC
AC
AC
AC
AC
AC
AC
AC
AC
RC
RC
RC
AC
AC
AC
AC
AC
RC
AC
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Pipes Needed
Comments
Slope (ft/ft)
Existing**
Peak Rate of
Runoff (cfs)
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future**
Peak Rate of
Runoff (cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
0.0049
0.0026
-0.0037
-0.0037
0.0230
0.0097
0.0057
0.0037
0.0012
0.0018
0.0014
0.0034
-0.0007
-0.0033
0.0014
-0.0013
-0.0013
0.0287
0.1475
0.0117
0.0216
0.0348
0.1026
0.1026
---10.4
------------56.3
------135.0
0.7
0.5
0.6
0.6
4.7
3.0
5.0
5.6
3.2
3.9
3.5
5.3
3.6
8.0
7.4
7.1
7.1
21.8
21.8
21.3
29.0
49.6
49.6
49.6
2.1
1.5
1.8
1.8
6.0
3.9
3.6
3.2
1.8
2.2
2.0
3.0
1.5
3.3
2.4
2.2
2.2
6.9
6.9
6.8
9.2
7.0
7.0
7.0
---11.6
------------56.3
------139.8
---21.4
------------53.8
------138.1
12
18
18
24
----------36
36
36
48
48
54
54
54
54
54
---3.7
------------8.0
------8.8
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
11/18/2011
Table
King Street/Market Street Area
Pipe Capacity Analysis
E
E
E
E
E
E
E
E
E
F
F
F
F
F
E-F
G
G
G
G
G
I
I
I
I
J
J
J
J
J
Q
Q
R
R
R
R
R
R
R
R
R
R
R
T
T
T
T
T
T
T
T
T
T
T
Order
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
44
45
46
47
48
GAGENJL
Upstream (US) ID
Downstream (DS)
ID
MH-1488
MH-1275
MH-1274
MH-1273
MH-1270
MH-1269
MH-1268
MH-1267
Junction E
MH-1298
MH-595
MH-596
MH-596a
Church Street
Junction E-F
MH-1261
MH-1263
MH-1262
MH-1260
Junction G
MH-1259
MH-1256
MH-1255
Junction I
MH-1252
MH-1251
MH-1248
MH-1247
Junction J
MH-1158
MH-1162
MH-1162
MH-1163
MH-1165
MH-1154
MH-2492
MH-2491
MH-2486
MH-2488
MH-2490
MH-2490
MH-1412
MH-2490
MH-1411
MH-1415
MH-1418
MH-1419
MH-1420
MH-1423
MH-1422
MH-1421
MH-973
OUT-62
MH-1275
MH-1274
MH-1273
MH-1270
MH-1269
MH-1268
MH-1267
MH-1261
-MH-595
MH-596
MH-596a
MH-1261
--MH-1263
MH-1262
MH-1260
MH-1259
-MH-1256
MH-1255
MH-1252
-MH-1251
MH-1248
MH-1247
MH-1158
-MH-1162
-MH-1163
MH-1165
MH-1154
MH-2492
MH-2491
MH-2486
MH-2488
MH-2490
-MH-1412
-MH-1411
MH-1415
MH-1418
MH-1419
MH-1420
MH-1423
MH-1422
MH-1421
MH-973
OUT-62
--
Location
King Street
King Street
King Street
King Street
King Street
King Street
King Street
King Street
King Street
Church Street
Church Street
Church Street
Church Street
Church Street
Church Street
King Street
King Street
King Street
King Street
King @ Finn Street
King Street
King Street
King Street
King @ North Street
King Street
King Street
King Street
King Street
King @ Trumbull Road
King Street
Allen Place
King Street
King Street
King Street
King Street
King Street
King Street
Off King Street
Off King Street
King Street
Bridge Street Diversion
Bridge Street Diversion
Main Street/Rte 9
Strong Street
Strong Street
Strong Street
Pearl Street
Pleasant Street/Rte 5
Pleasant Street/Rte 5
Off Pleasant Street
Off Pleasant Street
Off Pleasant Street
Off Pleasant Street
Drain Line
Main
Main
Main
Main
Main
Main
Main
Main
Main
Church Street
Church Street
Church Street
Church Street
Church Street
Church Street
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Invert Elev.
Pipe Length
Drainage
Area
(acres)
146.61
146.05
147.00
145.11
145.47
144.62
143.24
141.31
147.00
142.60
140.70
142.01
140.00
147.00
147.00
139.04
138.43
139.16
139.15
138.62
138.62
137.80
136.58
134.82
134.82
134.69
135.78
136.15
134.70
134.70
-134.77
133.98
132.68
130.36
129.83
127.20
126.80
127.50
125.20
125.20
125.20
125.20
126.60
127.80
126.50
126.00
127.00
123.00
125.80
126.00
120.80
116.59
142.15
140.54
139.98
139.34
138.68
137.69
133.89
132.20
129.80
136.20
135.31
132.80
132.17
129.80
129.80
129.60
128.56
127.93
127.08
126.20
126.20
125.17
124.63
123.66
123.66
123.08
122.27
121.73
120.35
120.35
119.34
119.34
118.57
118.07
117.02
116.36
115.47
114.50
113.92
116.37
116.37
113.40
113.40
113.05
111.53
109.59
109.01
107.60
106.86
106.64
106.31
105.92
105.71
192.00
187.00
79.00
135.00
224.00
176.00
162.90
233.60
-262.00
191.00
42.60
43.50
--135.90
108.30
296.30
103.70
-226.40
148.00
232.00
-91.70
224.20
88.50
312.40
-247.30
-132.30
94.80
232.70
146.00
160.00
150.00
122.00
124.00
-120.00
-73.70
73.70
259.50
116.20
297.00
235.30
102.00
170.00
212.00
117.60
--
--------19.30
----17.80
37.10
----62.30
---78.30
----147.20
-171.9
--------186.60
-186.60
----------197.10
Existing Pipes
2-YR Storm
10-YR
25-YR
100-YR
Pipe Size
(cfs)
Storm (cfs) Storm (cfs) Storm (cfs)
(in)
--------46.80
----31.80
78.30
----100.40
---114.30
----184.00
-229.70
--------243.00
-10.20
----------221.90
--------56.70
----41.60
97.80
----125.60
---142.90
----234.00
-289.70
--------305.40
-70.00
----------234.90
--------70.40
----55.40
125.20
----161.10
---182.90
----304.10
-373.80
--------392.80
-107.20
----------289.10
--------97.70
----83.40
180.00
----232.00
---183.10
----443.90
-541.70
--------567.10
-281.90
----------296.80
Page 1
15
18
21
21
21
21
30
30
30
18
20
21
21
21
30
30
30
36
36
48
48
48
48
48
48
48
54
54
54
54
54
54
54
54
66
66
66
66
66
66
36
36
60
60
60
60
60
66
66
66
66
66
66
Pipe
Mat'l
Manning
"n" value
AC
AC
AC
AC
AC
AC
RC
RC
RC
AC
AC
AC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Conc
Conc
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
Existing** Peak
Slope (ft/ft) Rate of Runoff
(cfs)
0.0080
0.0030
0.0108
0.0108
0.0044
0.0118
0.0098
0.0101
0.0101
0.0030
0.0100
0.0167
0.0042
0.0042
0.0101
0.0071
0.0054
0.0522
0.0071
0.0071
0.0042
0.0036
0.0037
0.0037
0.0049
0.0032
0.0047
0.0041
0.0041
0.0040
0.0040
0.0040
0.0040
0.0040
0.0045
0.0060
0.0060
0.0050
0.0050
0.0050
0.0055
0.0055
0.00600
0.00600
0.00600
0.00600
0.00540
0.00200
0.00200
0.00200
0.00200
0.00200
0.00200
--------56.70
----41.60
97.80
----125.60
---142.90
----234.00
-289.70
--------305.40
-70.00
----------234.90
Pipes Needed
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of Runoff
(cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
5.0
5.0
14.3
14.3
9.2
15.0
35.3
36.0
35.9
5.0
12.1
17.8
8.9
8.9
35.9
30.0
26.4
49.6
49.1
89.1
80.8
75.7
76.8
89.1
87.8
71.1
118.3
109.9
113.3
108.6
108.6
108.6
108.6
108.6
170.8
170.8
170.8
170.8
170.8
170.8
49.6
49.6
140.5
140.5
140.5
140.5
140.5
131.2
131.2
131.2
131.2
131.2
131.2
4.1
2.8
6.0
6.0
3.8
6.2
7.2
7.3
7.3
2.8
5.6
7.4
3.7
3.7
7.3
6.1
5.4
7.0
7.0
7.1
6.4
6.0
6.1
7.1
7.0
5.7
7.4
6.9
7.1
6.8
6.8
6.8
6.8
6.8
7.2
7.2
7.2
7.2
7.2
7.2
7.0
7.0
7.2
7.2
7.2
7.2
7.2
5.5
5.5
5.5
5.5
5.5
5.5
--------56.7
----44.3
100.5
----128.2
---145.4
----239.2
-295.0
--------310.5
-71.5
----------238.2
--------67.0
----43.2
104.8
----138.1
---176.9
----272.3
-331.6
--------329.4
-76.8
----------272.3
--------36
36
36
36
36
36
48
48
48
48
54
54
54
54
60
60
66
66
66
72
72
78
78
78
78
78
78
78
78
78
78
78
-42
----------72
--------9.5
----6.1
8.0
----8.1
---7.4
----8.5
-10.0
--------9.4
-7.4
----------8.4
11/18/2011
Table
King Street/Market Street Area
Pipe Capacity Analysis
U
U
U
U
U
U
U
U
2
3
4
5
6
7
8
9
MH-1146
MH-930
MH-928
MH-929
MH-931
MH-932
MH-963
OUT-61
MH-929
MH-928
MH-929
MH-932
MH-932
MH-963
OUT-61
--
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
Hampton Ave
127.00
127.00
127.00
127.00
127.00
127.00
118.93
118.93
---------
291.67
50.00
15.00
158.33
42.00
71.00
170.00
--
-------7.60
-------19.90
-------24.10
-------30.00
-------41.60
48
48
48
48
48
48
48
48
Conc
Conc
Conc
Conc
Conc
Conc
Conc
Conc
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.01000
0.01000
0.01000
0.01000
0.01000
0.11366
0.01000
0.01000
-------24.10
89.1
89.1
89.1
89.1
89.1
89.1
89.1
89.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
-------24.1
-------104.8
-------48
-------1.9
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 2
11/18/2011
Table
King Street/Market Street Area
Pipe Capacity Analysis
D
D
D
D
H
H
H
H
P
P
P
P
P
P
N
N
O
O
O
O
O
O
O
O
O
O
S
S
S
S
W
W
W
W
W
X
X
X
X
X
1
2
3
4
5
6
8
7
9
10
11
12
12a
13
0
2
1
2
3
3
4
5
6
7
8
8
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Upstream (US)
ID
MH-1481
MH-1482
MH-1813
MH-1984
MH-1984
MH-1982
MH-1980
MH-1980
MH-1983
MH-1985
MH-1986
MH-1987
MH-1987a
MH-1410
MH-1979
MH-282
MH-1003
MH-291a
MH-291a
MH-291
MH-2229
MH-1988
MH-2230
MH-1989
MH-1409
MH-1409
MH-1410
IN-3567
MH-1822
MH-1825a
MH-1825a
MH-1823
MH-2467
MH-2441
MH-553
MH-553
MH-553A
MH-1662
MH-1661
OUT-77
Downstream
(DS) ID
MH-1482
MH-1984
MH-1984
-MH-1982
MH-1980
-MH-1983
MH-1985
MH-1986
MH-1987
MH-1987a
MH-1410
-MH-1003
MH-1003
MH-291a
-MH-291
MH-2229
MH-1988
MH-2230
MH-1989
MH-1409
-MH-1410
IN-3567
MH-1822
MH-1825a
-MH-1823
MH-2467
MH-2441a
MH-553
-MH-553A
MH-1662
MH-1661
OUT-77
--
Location
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Market Street
Walnut Ave
Market Street
Market Street
Market Street
Market Street
Market Street
Market Street
Market Street
Market Street
Main Street
Main Street
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Railroad
Drain Line
Rim Elevation
Invert Elev.
Pipe Length
Drainage
Area
(acres)
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Walnut Ave
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
Main
141.71
141.39
137.15
138.60
139.20
139.20
130.00
130.00
137.60
137.60
136.00
135.00
129.60
129.60
128.43
137.00
128.80
128.80
129.14
130.13
128.82
128.87
128.50
127.63
127.63
131.79
123.00
125.00
122.40
123.20
123.20
124.40
124.00
126.00
120.40
120.40
120.40
121.00
124.00
116.07
--123.10
122.45
122.45
122.00
122.00
121.96
121.89
120.45
119.31
118.18
116.44
116.44
124.14
-120.65
120.65
120.33
120.03
119.27
119.04
118.80
118.56
118.22
118.22
115.72
114.93
114.37
113.85
112.91
111.47
110.75
109.36
108.05
108.05
107.81
106.00
104.18
101.50
312.50
145.83
50.00
-60.00
50.00
-20.00
380.00
300.00
300.00
460.00
190.00
-94.00
33.00
169.00
-151.00
394.00
118.00
124.00
125.00
174.00
51.00
51.00
320.00
230.00
258.00
-200.00
100.00
140.00
380.00
-30.00
230.00
230.00
340.00
--
---14.9
--88.2
------94.4
---22.8
------53.5
----175.8
----188.6
----192.3
Existing Pipes
Box
2-YR Storm
10-YR
25-YR
100-YR
Pipe Size Culvert
(cfs)
Storm (cfs) Storm (cfs) Storm (cfs)
(in)
Area (sq.
in)
---27.8
--66.5
------68.9
---32.1
------95.6
----133.3
----133.6
----131.5
---34.3
--89.0
------90.8
---42.3
------121.9
----199.2
----202.7
----203.3
---43.3
--121.5
------123.6
---56.8
------158.9
----272.2
----276.6
----277.0
---61.0
--188.8
------264.6
---86.4
------233.1
----558.2
----563.1
----560.6
30
36
47
36
48
48
44
44
44
44
44
44
40
40
12
12
18
18
18
18
18
18
21
21
24
24
66
66
72
72
72
72
72
82
82
61
60
60
60
60
------------36x36
36x36
------------54x60
54x60
54x72
54x72
54x72
54x72
54x72
60x72
60x72
48x60
-----
Pipe Mat'l
Manning
"n" value
Slope (ft/ft)
RC
RC
Stone
RC
Stone
Brick
Brick
Brick
Brick
Brick
Brick
Brick
Stone
Stone
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Br. Arch
Stone
Stone
RC
RC
RC
RC
0.015
0.015
0.015
0.015
0.015
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.015
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.015
0.015
0.015
0.015
0.00102
0.02907
0.0010
0.02907
0.00200
0.00378
0.00378
0.00378
0.00378
0.00378
0.00378
0.00378
0.00378
0.00378
0.00430
-0.1330
0.00194
0.00194
0.00193
0.00193
0.00195
0.00194
0.00192
0.00195
0.00195
0.03400
0.03400
0.03400
0.00200
0.00200
0.00721
0.00721
0.00721
0.00345
0.00345
0.00789
0.00789
0.00789
0.00789
0.00789
Pipes Needed
Existing**
Peak Rate of
Runoff (cfs)
---34.3
--89.0
------90.8
---42.3
------121.9
---199.2
----202.7
----203.3
Comments
Pipe Capacity
(cfs)
Pipe
Velocity
(ft/s)
Future** Peak
Rate of
Runoff (cfs)
Pipe
Capacity
(cfs)
Pipe Size
(in)
Pipe
Velocity
(ft/s)
11.4
49.6
37.5
99.2
56.1
68.0
53.9
53.9
53.9
53.9
53.9
53.9
47.4
47.4
2.0
5.40
4.0
4.0
4.0
4.0
4.0
4.0
6.0
6.1
8.7
21.8
170.8
170.8
146.1
146.1
204.2
204.2
204.2
266.9
266.9
145.3
140.5
140.5
140.5
140.5
2.3
7.0
3.1
14.0
4.5
5.4
5.1
5.1
5.1
5.1
5.1
5.1
5.4
5.4
2.6
6.88
2.3
2.3
2.3
2.3
2.3
2.3
2.5
2.5
2.8
6.9
7.2
7.2
5.2
5.2
7.2
7.2
7.2
7.3
7.3
7.2
7.2
7.2
7.2
7.2
---34.3
--94.4
------96.1
---42.3
------127.7
----206.1
----210.3
----211.0
---35.5
--88.3
------88.3
---29.4
------63.5
----189.4
----248.8
----176.9
---30
-48
48
48
48
48
48
48
48
48
24
24
36
36
36
36
48
48
48
48
48
----72
----72
----60
---7.0
--7.0
------7.0
---4.2
------5.1
----6.7
----8.8
----10.7
Notes:
(PCCP) Prestressed Concrete Cylinder Pipe
(VC/CC) Vitrified Clay Pipe
(RCP) Reinforced Concrete Pipe
italicized slopes are estimated based on ground surface elevation
Bold Pipe Capacity values are calculated using the Orifice Equation
Bold Pipe Velocity values are calculated using future peak rate of runoff
Pipe Capacity values not bolded are calculated using Manning's Formula
Red Pipe Size indicates pipe upgrade needed
*Orifice Equation Pipe Capacity is calculated assuming head can rise 1 ft above crown
**Existing and Future Peak Rates of Runoff are based on 10-year storm events
GAGENJL
Page 1
11/18/2011
Appendix D
Detailed Debt Service Schedule
2012
$0
$4,305
$1,213
$0
$0
$0
$7,638
$7,777
$0
$0
$0
$0
$0
$0
$6,944
$13,888
$7,166
$48,931
2013
$12,249
$56,687
$18,554
$0
$0
$0
$36,611
$37,138
$0
$0
$0
$0
$0
$0
$33,283
$66,565
$34,542
$295,629
2014
$187,337
$168,981
$57,403
$0
$0
$0
$57,182
$59,250
$0
$0
$0
$0
$0
$0
$58,927
$117,854
$61,967
$768,901
2015
$579,601
$164,515
$55,886
$0
$0
$0
$55,654
$80,023
$38,635
$1,278
$0
$0
$0
$0
$83,877
$167,755
$89,499
$1,316,723
2016
$564,288
$160,049
$54,370
$0
$14,332
$0
$54,127
$128,521
$590,894
$19,650
$0
$0
$0
$0
$108,133
$216,266
$117,143
$2,027,773
2017
$548,976
$155,583
$52,853
$3,333
$219,319
$25,303
$52,599
$125,027
$1,828,165
$60,873
$0
$0
$0
$0
$124,751
$263,389
$144,954
$3,605,126
2018
$533,664
$151,116
$51,337
$50,972
$678,637
$239,298
$51,071
$121,533
$1,779,868
$59,265
$0
$0
$0
$0
$121,279
$309,123
$172,881
$4,320,044
2019
$518,351
$146,650
$49,820
$157,700
$660,709
$784,708
$49,544
$118,039
$1,731,570
$57,657
$0
$0
$0
$0
$117,807
$353,468
$200,876
$4,946,898
2020
$503,039
$142,184
$48,304
$153,534
$642,780
$1,180,187
$48,016
$114,545
$1,683,272
$56,049
$9,082
$0
$0
$0
$114,335
$396,425
$229,043
$5,320,794
2021
$487,727
$137,718
$46,787
$149,368
$624,851
$1,148,562
$46,488
$111,051
$1,634,974
$54,440
$138,802
$0
$0
$0
$110,863
$437,993
$257,307
$5,386,930
2022
$472,414
$133,252
$45,271
$145,201
$606,922
$1,116,937
$44,961
$107,557
$1,586,676
$52,832
$429,364
$12,443
$0
$0
$107,391
$478,172
$285,718
$5,625,111
2023
$457,102
$128,785
$43,754
$141,035
$588,994
$1,085,313
$43,433
$104,062
$1,538,378
$51,224
$418,021
$190,407
$28,692
$0
$103,920
$516,962
$314,250
$5,754,331
2024
$441,789
$124,319
$42,238
$136,869
$571,065
$1,053,688
$41,906
$100,568
$1,490,080
$49,616
$406,678
$589,169
$271,316
$0
$100,448
$554,364
$342,901
$6,317,013
2025
$426,477
$119,853
$40,721
$132,703
$553,136
$1,022,064
$40,378
$97,074
$1,441,782
$48,008
$395,334
$573,603
$889,638
$17,859
$96,976
$590,377
$371,723
$6,857,706
2026
$411,165
$115,387
$39,205
$128,536
$535,207
$990,439
$38,850
$93,580
$1,393,484
$46,400
$383,991
$558,038
$1,337,944
$168,928
$93,504
$625,001
$400,685
$7,360,343
2027
$395,852
$110,920
$37,688
$124,370
$517,279
$958,814
$37,323
$90,086
$1,345,186
$44,791
$372,648
$542,473
$1,302,092
$553,980
$90,032
$658,236
$429,784
$7,611,554
2028
$380,540
$106,454
$36,172
$120,204
$499,350
$927,190
$35,795
$86,592
$1,296,888
$43,183
$361,304
$526,908
$1,266,240
$833,158
$86,560
$690,083
$459,066
$7,755,686
2029
$365,228
$101,988
$34,655
$116,038
$481,421
$895,565
$34,267
$83,098
$1,248,590
$41,575
$349,961
$511,343
$1,230,388
$810,833
$83,088
$720,540
$488,526
$7,597,104
2030
$349,915
$97,522
$33,139
$111,871
$463,492
$863,940
$32,740
$79,604
$1,200,292
$39,967
$338,618
$495,778
$1,194,536
$788,507
$79,616
$749,609
$518,182
$7,437,328
2031
$334,603
$93,056
$31,622
$107,705
$445,563
$832,316
$31,212
$76,110
$1,151,994
$38,359
$327,274
$480,213
$1,158,684
$766,182
$76,145
$777,290
$547,973
$7,276,300
Note:
The City currently has $250,000 in authorized borrowing not yet spent for general stormwater-related projects in FY 2012, not included as part of this Appendix. The annual debt service on that amount is estimated to be
$20,920 through FY 2021. As a result, the totals in this table will not exactly match the anticipated debt service line in Section 5.3.3 of the report.
1 of 2
2032
$319,291
$88,589
$30,106
$103,539
$427,635
$800,691
$29,685
$72,616
$1,103,696
$36,751
$315,931
$464,648
$1,122,832
$743,856
$72,673
$789,694
$565,080
$7,087,311
2033
$303,978
$76,403
$26,414
$99,373
$409,706
$769,067
$14,460
$55,176
$1,055,398
$35,142
$304,588
$449,083
$1,086,980
$721,530
$56,749
$737,016
$533,016
$6,734,079
2034
$266,702
$0
$0
$95,206
$391,777
$737,442
$0
$38,763
$1,007,100
$33,534
$293,244
$433,518
$1,051,128
$699,205
$41,520
$685,727
$501,319
$6,276,186
2035
$0
$0
$0
$91,040
$373,848
$705,817
$0
$34,021
$958,802
$31,926
$281,901
$417,952
$1,015,276
$676,879
$26,986
$635,827
$469,960
$5,720,237
2036
$0
$0
$0
$86,874
$355,920
$674,193
$0
$0
$841,225
$28,027
$270,558
$402,387
$979,424
$654,554
$13,146
$587,315
$438,961
$5,332,583
2037
$0
$0
$0
$82,708
$312,291
$642,568
$0
$0
$0
$0
$259,214
$386,822
$943,572
$632,228
$0
$540,192
$408,294
$4,207,890
2038
$0
$0
$0
$72,565
$0
$565,571
$0
$0
$0
$0
$247,871
$371,257
$907,720
$609,903
$0
$494,458
$377,984
$3,647,329
2039
$0
$0
$0
$0
$0
$279,479
$0
$0
$0
$0
$236,528
$355,692
$871,868
$587,577
$0
$450,113
$348,106
$3,129,364
2040
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$225,185
$340,127
$836,016
$565,252
$0
$407,156
$318,583
$2,692,319
2041
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$197,555
$324,562
$800,164
$542,926
$0
$365,588
$289,492
$2,520,288
2042
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$308,997
$764,312
$520,601
$0
$325,409
$260,809
$2,180,128
2043
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$271,119
$728,460
$498,275
$0
$286,619
$232,561
$2,017,034
2044
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$641,159
$475,949
$0
$249,218
$204,775
$1,571,101
2045
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$316,813
$453,624
$0
$213,205
$177,431
$1,161,073
2046
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$399,273
$0
$178,581
$150,558
$728,412
2047
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$197,292
$0
$145,345
$124,187
$466,824
2048
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$113,499
$98,299
$211,798
2049
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$83,041
$72,927
$155,968
2050
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$53,972
$48,054
$102,026
2051
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$26,292
$23,768
$50,059
Note:
The City currently has $250,000 in authorized borrowing not yet spent for general stormwater-related projects in FY 2012, not included as part of this Appendix. The annual debt service on that amount is estimated to be
$20,920 through FY 2021. As a result, the totals in this table will not exactly match the anticipated debt service line in Section 5.3.3 of the report.
2 of 2