Structures Design
Structures Design
JimSchneiderman,P.E.
PCLCivilConstructors,Inc.
R.CraigFinley,Jr.,P.E.
FinleyEngineeringGroup,Inc. y g g p,
Structures Design
Roosevelt Bridge
FromtheFloridaDepartmentof TransportationsPerspective
Skyway Bridge
HistoryofSegmentalBridgesin Florida
February 23, 2010 FDOT/FTBA Construction Conference
Brian Blanchard P.E. Chief Engineer Florida Department of p Transportation
1981
Span-by-span Balanced Cantilever
1982
1983
hannel Niles Ch
1984
Ram I mp Over I-75
Seven Mile
1985
1986
I-75/SR 826 8 ( (5 Bridg ges) I-595/I-75 (5 ( Bridg ges)
1987
Ft. Lauderda ale Airpo ort (4 Bridge 4 es)
1988
I-5 595/US 441 4 ( (2 Bridg ges) I-595/I-75 (6 ( Bridg ges)
1981
Seven-Mile Bridge
First Application of an Overhead Gantry in Florida y
1982
Ramp I Bridge
First application of Precast Balanced Cantilever Construction in Florida
1984
- Other Firsts
First Demolition of Existing Segmental Bridge in the North America. Fort Lauderdale-Hollywood International Airport expansion required the removal of three precast q p segmental concrete bridges. How did we demolish segmental concrete bridges built by the balancedcantilever method? By reversing the way the segments were i h installed. ll d
2002
- Other Firsts
I-75/ SR 826 Ramp A -First Segmental Bridge p g g Widening in U.S. Mainland
2004
10
0 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Acosta Bridge
Segmental Bridge Construction g g Plans Review Group p FDOT Policies In Response to PT Corrosion Issues
FDOTBridgesw/Grout Problems
Niles Channel Bridge
1999Inspection
Skyway Bridge
FDOTBridgesw/Grout Problems(cont.)
Midbay(Spans28and57 ( 2 FailedTendons)
2000Inspection
Seabreeze Bridge
Pre-approved P.T. Systems Qualified Grouting Personnel/ Inspectors Specify Low-Point-Up Grouting Specify Non-bleed QPL Bagged Grouts Specify Inspection Access Points
Hathaway Bridge
Roosevelt Bridge
Future Trends Greater Use of Combined Steel and Concrete to Reduce Weight?
Core Segment
Future Trends National Post-Tensioning Specification p PTI is currently developing a nationwide p y p g posttensioning specification based largely on FDOT specifications, research and past experiences.
Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference
P Precasting S ti Segments t
Superstructures&Substructures
ErectingPrecastSegments
Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference
Superstructures&Substructures
CastinPlacewithFormTravelers
Structures Design
Structures Design
ErnestF.LyonsBridge Stuart,FL
(PhotocourtesyofPCLCivilConstructors,Inc.)
Structures Design
JohnRinglingCauseway S J h Ri li C Sarasota,FL t FL
(PhotocourtesyofPCLCivilConstructors,Inc.)
Structures Design
Temp.Support
LinnCoveViaduct BlueRidgeParkway,NC
(PhotocourtesyofFigg EngineeringGroup)
Structures Design
Temp.Support
Structures Design
FormTraveler
FoothillsParkwayBridges SmokeyMountains,Tennessee
(PhotoCourtesyofPCLCivilConstructors,Inc.)
Structures Design
Structures Design
LaunchingNose
Structures Design
SunshineSkywayBridge Tampa,FL
(PhotocourtesyofFigg EngineeringGroup)
Structures Design
Structures Design
Structures Design
SpanbySpanErectionMethods
TopDownerectionusingunderslungtrussandsegmentlifter
SegmentLifter
Underslung Truss
TrussSupports
ErnestF.LyonsBridge Stuart,FL
(PhotoCourtesyofPCLCivilConstructors,Inc.)
Structures Design
SpanbySpanErectionMethods
Overhead Erection Truss OverheadErectionTruss
SeattleSoundTransitLightRailProject Seattle,WA
(PhotocourtesyofPCLCivilConstructors,Inc.)
Structures Design
Structures Design
SpanbySpanErectionMethods p y p
ErectedonFalsework usingconventionalcranes
Falsework
(PhotocourtesyofFlatironConstructors,Inc.)
Structures Design
SpanbySpanErectionMethods
Lifti LiftingofEntireSpanatonce f E ti S t
Structures Design
TypicalBalancedCantileverErectionMethods yp
Structures Design
BalancedCantileverErectionMethods
CraneErectionfromGround
CraneErectionfromBridgeDeck
Structures Design
BalancedCantileverErectionMethods
Erectionusingabeamandwinch
OaklandBayBridge Oakland,CA
(PhotocourtesyofFlatironConstructors,Inc.)
Structures Design
BalancedCantileverErectionMethods
ErectionusingoverheadErectionTruss
Structures Design
SegmentalSubstructures
SequenceofErection:
PlaceandGroutSegmenttofootingKeway Erectremainingsegmentstoapredetermined elevation(usuallybasedonstability). elevation (usually based on stability) PerformintermediateP.T.tomaintainpier stability Afterallsegmentshavebeenerected, permanentPTisperformed(usuallyloop permanent PT is performed (usually loop tendonsthroughfooting) Tendonsarethengrouted.
TypicalPrecastColumnSegment
Keyway
SplashZoneRequirements:
Manystatesdonotallowprecastsubstructure elementstobeusedwithinthesplashzone.Above theSplashZone,precasterectioncanbegin.
KeywayinFootingtoAlign/StressfirstSegment
Structures Design
SegmentalSubstructures g
C&DCanalBridge
HooverDamBypass
Structures Design
SegmentalSubstructures g
StressingVerticalColumnTendon
Structures Design
Structures Design
Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference
Structures Design
Structures Design
Structures Design
Plans Review Group p DesignandConstructionEngineersPerspective g g p Key Points to Understanding Segmental Segmentalbridgesarebasedona constructiontechniquethathas designimplications. Knowhowtobuilditbefore startingtodesignit. g g
Structures Design
Structures Design
Thebestapproachisnotalwaysthesame foreveryoneoreveryproject.
Structures Design
Structures Design
Procurement
Structures Design
Procurement
Structures Design
Plans Review Group p DesignandConstructionEngineersPerspective g g p Value Engineering / Construction Modification Construction Modification
Combinationapproach Combination approach Usedforanadvantage Hasbeenverysuccessful Has been very successful Morecommonintoughtimes
Procurement
Structures Design
ConstructionEngineer
ContractorClient
ValueEngineering/DesignBuild
Structures Design
Structures Design
Plans Review Group p DesignandConstructionEngineersPerspective g g p The Design Engineer provides post-design services services.
R i Reviewsandapprovesconstruction d t ti engineering Based on actual construction engineering Basedonactualconstructionengineering
Takestime Inefficient Personalitiesinvolved
Structures Design
Structures Design
Plans Review Group p DesignandConstructionEngineersPerspective g g p The Construction Engineer does the detailed design design.
Performs time dependent, step by Performstimedependent,stepby stepanalysis Incorporatesscheduleandsequence p q Analyzesmeansandmethods Usessophisticatedsoftwareandis Uses sophisticated software and is verydetailed
Roles & Responsibilities
Structures Design
Structures Design
Structures Design
Managing Principal
Structures Design
Structures Design
Structures Design
Structures Design
g y y g g p R.CraigFinley,Jr.,P.E.,FinleyEngineeringGroup