You are on page 1of 4

Multimedia CBT

In order to share enormous training information at the door step of Power Utilities and Engineering Institutes as well as in house training. A Multimedia Computer Based Training (CBT) Centre has been established at NPTI's Corporate Office and its Regional Institute for developing Multimedia CBTs on various Technical areas concerning Power Generation like : Thermal, CCGT/Gas, Thermal, Hydro, Renewable Transmission & Distribution and Management Areas. Open Learning Centres (OL Cs) have also been established at all Regional Institutes for Self Learner at learner's own choice and pace without any help of the subject experts. CBT has been identified as one of the most cost effective means of delivering consistent high quality training. So far NPTI has developed more than 50 Multimedia CBTs for power professionals and has been marketing them at reasonable prices to the Utilities and Educational Institutes. Besides in house training in NPTI, these Multimedia CBT packages are being utilized by various Power Utilities / SEBs as well as Engineering Institutes for upgrading and enhancing their knowledge and skill.

POWER UTILITIES / SEBs BHEL, MSEB, RRVUNL, NTPC, NHPC, NPC, PSEB, TNEB, OHPC, NLC, DVB, KLTPS, DVC, WBPDCL, IPPGCL, BBMB, BSES, TATPOWER, THERMAX, ACC, APSEB, NDPL, UPRVUN, BSEB, WSEB, etc.

ENGINEERING INSTITUTIONS G.B Pant University of Agric. and Technology, NIT Raipur, NIT Durgapur, Jawaharlal Nehru Technological University (AP) Kalyani University (WB), CMERI, VNIT (Nagpur) Delhi College of Engineering, Bharati Vidyapeeth, Deemed University, Pune etc.

Advantages of Multimedia CBT


Interactive Cost effectiveness Provides instant feed back Learner driven and not trainer driven

CBT Application Areas


System description Process modeling Equipment operation

CBT Packages are Developed in the Areas of


Thermal Generation CCGT Hydro Generation Transmission & Distribution Management Renewable.

Multimedia Computer Based Training (CBT) Packages


S. N. Name of the Multimedia CBT Package Price of 1st copy Price of 2nd, 3rd, & 4th copy All other copies

Coal Thermal
A) Boilers
1. 2. 3. 4. 5. Combustion System in Boilers Boiler Drum and Drum Internals Super Heater, Re-heater and De-Super Heater Air Heater Fuel Handling System, Feed Heating System & Exhaust System CFB Boiler Rs.40,000/-do-do-doRs.25,000/Rs.25,000/-do-do-doRs.15,000/Rs.15,000/-do-do-doRs.12,000/-

6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36.

Rs.25,000/Rs.25,000/Rs.40,000/-do-do-do-doRs.15,000/Rs.25,000/Rs.25,000/Rs.40,000/-do-do-doRs.40,000/Rs.40,000/Rs.40,000/Rs.40,000/Rs.25,000/Rs.25,000/Rs.40,000/Rs.15,000/Rs.25,000/Rs.25,000/Rs.15,000/Rs.25,000/Rs.40,000/Rs.25,000/Rs.25,000/Rs.25,000/Rs.40,000/-

Rs.15,000/Rs.15,000/Rs.25,000/-do-do-do-doRs.10,000/Rs.15,000/Rs.15,000/Rs.25,000/-do-do-doRs.25,000/Rs.25,000/Rs.25,000/Rs.25,000/Rs.15,000/Rs.15,000/Rs.25,000/Rs.10,000/Rs.15,000/Rs.15,000/Rs.10,000/Rs.15,000/Rs.25,000/Rs.15,000/Rs.15,000/Rs.15,000/Rs.25,000/-

Rs.12,000/Rs.12,000/Rs.15,000/-do-do-do-doRs.8,000/Rs.12,000/Rs.12,000/Rs.15,000/-do-do-doRs.15,000/Rs.15,000/Rs.15,000/Rs.15,000/Rs.12,000/Rs.12,000/Rs.15,000/Rs.8,000/Rs.12,000/Rs.12,000/Rs.8,000/Rs.12,000/Rs.15,000/Rs.12,000/Rs.12,000/Rs.12,000/Rs.15,000/-

B) Turbines
Water/Steam cycle of a Thermal Power Plant Steam Turbine Construction Turbine Governing System (KWU) Regenerative Feed Heating System Turbine Vacuum System HP-LP Bypass System Turbine Lubricating Oil System P. I. D. Control

C) Generators
Working Principles of Generator & Electrical Systems in a Thermal Power Station Generator Construction Generator Excitation System Generator Seal Oil System Generator Cooling System

D) Auxiliaries
Power Station Fans Electrical Motors in Power Station Coal Mills & Milling Systems Electrostatic Precipitators Cooling Water System Compressed Air, Water Treatment & Fire Prevention Systems Lub Oil Handling System Coupling for Power Transmission Pumps used in Power Station Boiler Feed Pump for Power Station Valve Maintenance

CCGT / Gas Thermal


Combined Cycle Gas Turbine (CCGT) Plant Gas Turbine Control System of CCGT Plant Water Treatment of CCGT

Hydro
Hydro Generator Construction Silting Problems in Hydro Power Plants

37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52.

Hydro Turbine Hydro Environment interface Hydro Generator Protection R & M for Hydro Power Station

Rs.25,000/Rs.15,000/Rs.25,000/Rs.10,000/Rs.40,000/Rs.40,000/Rs.40,000/Rs.40,000/Rs.25,000/Rs.15,000/Rs.15,000/Rs.25,000/Rs.15,000/Rs.15,000/Rs.40,000/Rs.40,000/-

Rs.15,000/Rs.10,000/Rs.15,000/Rs.8,000/Rs.25,000/Rs.25,000/Rs.25,000/Rs.25,000/Rs.15,000/Rs.10,000/Rs.10,000/Rs.15,000/Rs.10,000/Rs.10,000/Rs.25,000/Rs.25,000/-

Rs.12,000/Rs.8,000/Rs.12,000/Rs.6,000/Rs.15,000/Rs.15,000/Rs.15,000/Rs.15,000/Rs.12,000/Rs.8,000/Rs.8,000/Rs.12,000/Rs.8,000/Rs.8,000/Rs.15,000/Rs.15,000/-

T&D
Power Transformers Condition Monitoring of Power Transformers Maintenance of Power Transformers Power Station Switchgear Switchgear Maintenance Sub Station Maintenance Management A System Approach Drying out System of Power Transformers and Reactors Cable and Cable Jointing Motor & Motor Maintenance Battery and Battery Maintenance

Renewable
Renewable Energies

Management
Project Management through the Technology Consciousness

Hindi
53. Rajbhasha Hindi Ki Sambhidhanic Sthiti and Karyalayeen Prayog Rs.6,000/Rs.4,000/Rs.3,000/-

Miscellaneous
54. 55. Electrical Safety Coal to Electricity Rs.10,000/Rs.10,000/Rs.8,000/Rs.8,000/Rs.6,000/Rs.6,000/-

Note: All CDs are Copyright NPTI.

The CDs are to be used in the premises for which they have been procured. Reproduction of any of these CDs in any form is illegal under copyright act.
Incentive Scheme for Organisations procuring before 31th Dec 2012 1 For a Order value of Rs.6,40,000/- or above 1 Personal Computer with printer free or adjust Rs.40,000/-. 2 For a Order value of Rs.8,40,000/- or above 1 LCD projector free or adjust Rs.60,000/-. 3 For a Order value Rs.11,20,000/- or above 1 Personal Computer with printer + 1 LCD Projector or adjust Rs.1.00 Lakh.

For more details, please write to:

Director (IT), NPTI Corporate Office, Sector-33, Faridabad (Haryana) 121 003 Ph: 0129 2275448, 2274916-17 /Extn.312 & 316

OUR TERMS AND CONDITIONS


1 2. 3. 4. 5. 6. Delivery period Payment terms Guarantee Period in view of possibility of any software bugs etc. Responsibility of damages during transportation of the packages Mode of delivery In case of updates of any CBT package whether the same would be extended at free of cost Provision of operation/Instruction Manual/Documentation Installation at users site after delivery : : : : : : 21 days from the date of receipt of order. (Immediate from Ex-stock) 100% payment against delivery and successful installation of software Three months after installation Replacement free of cost By Post/Courier at F.O.R destination Nominal additional cost

7. 8.

: :

Instruction Manual will be provided along with the Software free of cost The installation is very simple which can easily be done by user himself. If any problem arises, the same will be installed by NPTI faculty member. There shall not be any penalty for unforeseen delay in delivering the material as NPTI is a Govt. of India organization & supplying the material on no loss no profit basis

9.

Penalty Clause

Any additional information as per our terms:

a) Agreements will have to be signed by both the parties/organization on non-judicial


stamp paper of Rs.100/- payable by the client that Buyer will not sell the software packages anywhere in India and abroad and the software will only be used in the premises for which they are earmarked as these are the proprietary items of NPTI as per Copyright Act. b) Prices are exclusive of all taxes and duties. Octroi, if any will be borne by Buyer.

You might also like