COMPANY: GROUP FIVE (ZAMBIA) LTD 2012 JOB NAME: TOBACCO PROCESSING FACILITY,LUSAKA ,ZAMBIA SUBCONTRACT PACKAGE: Earthworks

SUBMISSION DATE:28th May 2012 PAGE ITEM 1 1 1 1 1 DESCRIPTION TOBACCO PROCESSING FACILITY, LUSAKA BILL NO 3 GREEN STORAGE WAREHOUSE SUBSTRUCTURE Refer SMM paragraph F19 (a). It has been assumed that strip footings, bases, beds and the like within the ground will be poured against natural ground. If formwork is required to such surfaces, the Contractor must include for same in his excavation/concrete rates EXCAVATION Excavation/Filling (Provisional) Excavate trench from reduced level for strip footings 0 to 1500mm deep Excavate pit from reduced level for column bases 0 to 1500mm deep Ditto, 1500 to 3000mm deep Laterite filling deposited spread and compacted in 150mm layers around foundations UNIT QUANTITY RATE AMOUNT

1 1 1 1 1 1

A B C D

m3 m3 m3 m3

828 2,443 1,629 30,000

5.96 6.12 6.6 10.58

4934.88 14951.16 10751.4 317400

Seleccted fill material deposited, spread and m3 compacted in 150 mm layers around foundations Rock excavation (Provisional) Extra over excavation for excavating in rock Disposal (Provisional)

2,450

13.4

32830

1 1 1

m3

500

131.56

0 65780 0

Surplus excavated material from excavations m3 transported a distance average 200 linear metres from excavations, deposit, spread and level where directed on site 40mm sand bed laid on laterite to receive damp proof membrane Ant treatment Saturate surface of gravel and top of brickwalls with an approved ant repellant Saturate bottom of excavations with an approved ant repellant Sundries Allow for keeping excavations free from water m2

2,450

13.4

32830

1 2 2 2 2 2 2 12 12 12 12

30,000

2.57

77100 0 32400 2355.48 0 0 0 0 0 0 0

A B

m3 m2

30,000 2,181

1.08 1.08

C D

Item

0 0

Allow for planking and strutting to sides of Item excavations BILL NO 4 PROCESSING FACILITY SUBSTRUCTURE Refer SMM paragraph F19 (a). It has been assumed that strip footings, bases, beds and the like within the ground will be poured against natural ground. If formwork is required to such surfaces, the Contractor must include for same in his excavation/concrete rates EXCAVATION Excavation/Filling (Provisional) Excavate trench from reduced level for strip m3 footings 0 to 1500mm deep Excavate pit from reduced level for column bases m3 0 to 1500mm deep Ditto, 1500 to 3000mm deep m3

12 12 12 12 12

A B C

683 2,020 1,333

6.09 6.09 7.2

0 0 4159.47 12301.8 9597.6

12

Laterite filling deposited spread and compacted in m3 150mm layers around foundations Seleccted fill material deposited, spread and m3 compacted in 150 mm layers around foundations Rock excavation (Provisional) Extra over excavation for excavating in rock m3 Disposal (Provisional) Surplus excavated material from excavations m3 transported a distance average 200 linear metres from excavations, deposit, spread and level where directed on site 40mm sand bed laid on laterite to receive damp proof membrane Ant treatment Saturate surface of gravel and top of brickwalls with an approved ant repellant Saturate bottom of excavations with an approved ant repellant Sundries Allow for keeping excavations free from water Allow for planking and strutting to sides of excavations BILL NO 5 DRY STORAGE WAREHOUSE SUBSTRUCTURE m2

14,000

10.58

148120

12

2,057

13.4

27563.8

12 12 12 12

E F

366 1,980

131.56 13.4

0 48150.96 0 26532

12 13 13 13 13 13 13 23 23 23

14,000

2.57

35980 0 15120 1946.16

A B

m2 m2

14,000 1,802

1.08 1.08

C D

Item Item

0 0

23

Refer SMM paragraph F19 (a). It has been assumed that strip footings, bases, beds and the like within the ground will be poured against natural ground. If formwork is required to such surfaces, the Contractor must include for same in his excavation/concrete rates EXCAVATION Excavation/Filling (Provisional) Excavate trench from reduced level for strip footings 0 to 1500mm deep Excavate pit from reduced level for column bases 0 to 1500mm deep Ditto, 1500 to 3000mm deep Laterite filling deposited spread and compacted in 150mm layers around foundations

23 23 23 23 23 23

A B C D

m3 m3 m3 m3

621 1,837 1,212 30,000

5.93 6.09 6.6

3682.53 11187.33 7999.2 0

23

Seleccted fill material deposited, spread and m3 compacted in 150 mm layers around foundations Rock excavation (Provisional) Extra over excavation for excavating in rock m3 Disposal (Provisional) Surplus excavated material from excavations m3 transported a distance average 200 linear metres from excavations, deposit, spread and level where directed on site 40mm sand bed laid on laterite to receive damp proof membrane Ant treatment Saturate surface of gravel and top of brickwalls with an approved ant repellant m2

1,870

10.98

20532.6

23 23 23 23

E F

333 1,800

131.48 13.02

0 43782.84 0 23436

23 24 24

20,000

2.57

51400 0 21600

m2

20,000

1.08

24 24 24 24 33 33 34 34 34

C D

Saturate bottom of excavations with an approved m2 ant repellant Sundries Allow for keeping excavations free from water Item Allow for planking and strutting to sides of excavations BILL NO 6 EXTERNAL WORKS SITEWORKS (PROVISIONAL) Demolition Cut down and remove from site trees, not exceeding 600mm girth, include for grubbing up and removing roots and filling and compacting with suitable material Anthills Excavate above ground anthills Excavate below ground, 0 to 1500mm deep Ditto, 1500 to 300mm deep, anthills Extra over excavations of anthill for locating ant nest and applying ant treatment as described (1 No anthill) Selected excavated material as backfill to excavated anthill Site clearance Clear site of all rubbish, grass and planting, grub up roots and room from site Topsoil Excavate oversite average 150mm deep to remove topsoil, stockpile on site for later re-use Excavation Item

1,639

1.08

1770.12 0 1000 1300 0 0 0 0 4000

1 1

1000 1300

No

50

80

34 34 34 34 34

B C D E

m3 m3 m3 Item

50 50 50 1

6.09 7.1 90 1400

0 304.5 355 4500 1400

34 34 34 34 34

m3

100

7.5

750 0 325000 0 90000

m2

125,000

2.6

m3

18,750

4.8

34

34

Selected fill material deposited and compacted in m3 150mm layers to achieve a Mod AASHO of 95% Import fill from borrow pit , transport, deposited m3 and compacted in 150 mm layers as above 150 x 300mm high precast concrete (Class 21N/ m mm2/10mm) kerbs splayed on one face generally in 900mm lengths with gaps of 500mm between each kerb and haunched in and including 0.03m3/m concrete (Class 14N/mm2/20mm) include all formwork, excavation, joining, etc Ditto, curved on plan BOUNDARY WALL Excavation Excavate from reduced/natural ground level for strip footing, 0 to 1500mm deep Selected earth deposited and completed in 150mm layers around foundations Remove surplus excavated material from site Allow for keeping excavations free from water Allow for planking and strutting to sides of excavations ROADS, FORECOURT AND EXTERNAL PAVING m

16,000

10.98

175680

34

16,000

7.5

120000

35

1,000

8000

35 36 36 36 36 36 36 36 37 37 37

100

A B C D E

m3 m3 m3 Item Item

44 220 200 1 1

6.1 7.5 13.4 1000 1400

800 0 0 268.4 1650 2680 1000 1400 0 0 22500

Excavation Compact surface of reduced subgrade excavation m2 to an approved method to achieve a Mod AASHO of 95%

15,000

1.5

37

37 37

C G

37 38 38 38

200mm thick laterite base course, graded to falls and cross falls and compacted to achieve a Mod AASHO of 98% 50mm thick bed of sand 150 x 300mm high precast concrete (Class 21N/ mm2/10mm) kerbs splayed on one face generally in 900mm lengths, bed and haunched in and including 0.03m3/m concrete (Class 14N/mm2/20mm) include all formwork, excavation, joining, etc Ditto, curved on plan STORMWATER DRAINAGE Open earth drain (Provisional) Excavate trench from natural/reduced ground level for earth drain 0 to 1500mm deep Remove surplus excavated materials from excavations, transport a distance 100 linear metres from excavation deposit, spread and level where directed on site Open "U and 5 brick " shaped drains Excavate trench from natural/reduced ground level for drain 0 to 1500mm deep Remove surplus excavated materials from excavations, transport a distance 100 linear metres from excavation deposit, spread and level where directed on site FOUL DRAINAGE Trench excavation Excavate trench from reduced/natural ground level for large diameter pipe, 0 to 1500mm deep, average 500mm Ditto, average 1500mm Ditto, average 3000mm

m2

2,000

8000

m2 m

1,000 913

3.03 80

3030 73040

156

80

m3

200

6.1

12480 0 0 1220

38

m3

200

13.4

2680

38 38 38

C D

m3 m3

1,800 1,800

6.1 13.4

0 10980 24120

39 39 39

339

4.7

1593.3

39 39

B C

m m

660 300

5.1 7.3

3366 2190

39 39 39 39 39 39 39 39 40 40 40 40 41 41 41 43 43 43

D F G H I J K

Ditto, average 4500mm Manholes ( 66 No. ) Excavate pit from reduced/natural ground level for manhole, 0 to 1500mm deep Ditto , 1500-3000mm deep Ditto , 3000-4500mm deep Remove surplus excavated material from site Allow for keeping excavations free from water Allow for planking and strutting to sides of excavations Septic tank ( 6 No. )+B975 Includes entry manhole Excavate pit from reduced/natural ground level for manhole, 0 to 1500mm deep Remove surplus excavated material from site Septic tank ( 6 No.) Allow for keeping excavations free from water Allow for planking and strutting to sides of excavations WATER AND OTHER SERVICES (PROVISIONAL) Trench excavation Excavate trench from reduced/natural ground level for small diameter pipe mains or telephone cables, 0 to 1500mm deep, average 500mm Ditto, average 750mm Ditto, average 1000mm

m m3 m3 m3 m3 Item Item

270 96 28 10 134 1 1

9.1 6.1 6.6 7.34 13.4 800 1200

2457 0 585.6 184.8 73.4 1795.6 800 1200 0 0 420.9 924.6 0 800 1200 0 0 5040

M N

m3 m3

69 69

6.1 13.4

A B

Item Item

1 1

800 1200

1,400

3.6

43 43

B C

m m

400 400

4.2 4.9

1680 1960