SUMMARY STATEMENT
STP OF TUSCAN CITY, KUNDLI, SONEPAT, HARYANA
THIS DOCUMENT CONSIST THE DESIGN CONCEPT, DESIGN CALCULATION AND OTHER RELATED INFORMATION REGARDING THE SEWAGE TREATMENT PLANT FOR 14 Acr.
MM/STP/D076/12-13
Project Management Consortium-Environment Developed By
Project Management Consortium- Environment1 of 15 Rev.-0 date- 26-05-12 Page 5/26/2012 By Approved
MATHEMATICAL MODELING
FOR
Tuscan City,
Kundli, Sonepat,
Haryana, INDIA
Elaborated by: Project Management Consortium- Environment, # 441 Sector 16 Sikandra Avas Yojna Sikandra, Agra 282007 dassagra@hotmail.com; info@wateronline.co.in
Rev.-0
date- 26-05-12
Page 2 of 15 Approved By
Contents
OBJECT KEPT IN VIEW FOR DESIGNING ETP ...........................................................................4 1.0 2.0 3.0 3.1 SEWEAGE TREATMENT PLANT DESIGN CONCEPT .....................................................4 Estimation of discharge from the site Tuscan City................................................................5 EXPECTED RAW INFLUENT CHARACTERISTICS: ........................................................5 EVALUATION OF LOADS AT PRIMARY TREATMENT: ................................................5
Chart 1- Schematics of Sewage Treatment Plant ................................................................................6 4.0 DESIGN OF BAR SCREEN, OIL & GREASE SAPRATOR ......................................................7 5.0 6.0 7.0 8.0 9.0 10.0 11. DESIGN FOR EQULIZATION TANK ...................................................................................7 CALCULATION FOR ANAEROBIC ZONE (UASB) ......................................................8 DESIGN AERATION TANK VOLUME (MMBR REACTOR) ........................................10 DESIGN OF SECONDARY SETTLING TANK (TUBE SETTLER) ............................12 SLUDGE DISPOSAL: ...........................................................................................................13 TREATED WASTEWATER DISPOSAL (BY OZONE): ....................................................13 SUMMARY OF MATHEMATICAL MODELING ..............................................................13
Rev.-0
date- 26-05-12
Page 3 of 15 Approved By
Rev.-0
date- 26-05-12
Page 4 of 15 Approved By
Quantity
500 850-2000 400 2000 <100
Target
550 <30 <100
Rev.-0
date- 26-05-12
Page 5 of 15 Approved By
Sump well
Grit settlers
FAB Reactor
Equlisation tank
Rev.-0
date- 26-05-12
Page 6 of 15 Approved By
HRT required for proper equalization of wastewater 6 hrs. or total volume required 137.49 or 140 m3 Depth required for the equalization is 5 m thus plan area required for the same will be 28 or 30 m2. Recommended L X W for equalization is 7 X 4 as per site condition. 5.2 Assuming 10 % BOD removal in equalization tank BOD load at inlet of Down flow
anaerobic reactor will be 200 kg/day. For further calculation 400 mgl.
Rev.-0
date- 26-05-12
Page 7 of 15 Approved By
Parameter selected 7.3 ~ 7.7 400 mg/l 900 mg/l 105 mg/l 395 mg/l 270 mg/l 20~30 days
Assume BOD removal efficiency I.e. Targeted UASB effluent BOD Sludge production VSS produce in process Non degradable Ash receive in influent Total sludge produce or SRT & HRT value SRT ( Sludge retention Time) Depth of Sludge blanket Effectiveness Coeff. Average Concentration of sludge in blanket Length of reactor HRT Up flow Velocity @ average flow Reactor dimensions Plan area required No of Cell required area of each cell
Project Management Consortium-Environment Developed By
80 80
% mg/l
3.8 3.8
M M
4.8
Check loading
for
organic
1.55
Kg/Cum/day
Range 1-3
Kg/Cum/day
6.2
Rev.-0
date- 26-05-12
Page 9 of 15 Approved By
Tank Volume Top Area Bottom Area SWD Effective Depth Pipe Aerator Density Meter length of Pipe Aerators Membrane area No. of Laterals Total length of laterals No. of aerator per Lateral Center-to-center distance b/n aerators End-to-end distance b/n aerators Air Quantity in Sm3/hr Air Quantity in m3/hr
82.0 18.2 18.2 4.5 4.3 12.3 14 2.24 2 10 14 0.38 0.6 115.0 135.2
L (mtr.) = B (mtr.) =
3.0 6.0
Pressure drop expected 0.55 Aerator throughput rate 8.22 Membrane throughput rate 51.35 Field Correction Factor 0.57 Oxygen suggested at FIELD condition (A.O.R) 5.00 Oxygen required at standard condition (S.O.R) 8.75 S.O.T.E 27.27 A.O.T.E 15.58 SOTE/m water column 6.34 Standard Oxygenation Capacity 17.70 Actual Oxygenation Capacity 10.11 Air Quantity Calculated / m3 tank volume approx. air temp. at
Project Management Consortium-Environment Developed By
1.40 73.46
Rev.-0
blower outlet Motor Energy consumption energy at blower efficiency Standard Aeration Capacity Actual Aeration capacity
7.1 AERATION TANK: Suggested tank as per site Size: 3 m x 6.0 m x 5 m (SWD) 7.2 expected BOD load at outlet will be 20 mg/l.
Rev.-0
date- 26-05-12
Page 11 of 15 Approved By
3.5
Rev.-0
date- 26-05-12
Page 12 of 15 Approved By
Dinkar Saxena,
Chartered Engineer (India), M/128465/1 M. Sc., M.I.E., C. Eng., F.I.P.H.E., PGDM, MASHRAE Environment Management System Auditor Social accountability Auditor (SA 1462 Dtd:04-26-2006)
Rev.-0
date- 26-05-12
Page 13 of 15 Approved By
Notes:-
Rev.-0
date- 26-05-12
Page 14 of 15 Approved By
Notes
Rev.-0
date- 26-05-12
Page 15 of 15 Approved By