You are on page 1of 6

CURRICULUM VITAE

Subject:-Application for the post OF E&I QA/QC Inspector/Const.Supr.


With the Aramco Approval :CAREER OBJECTIVE: (SAP# 70007260)

To lean and know my work to the core and try to understand the synergy of my work to the organization as well as the larger environment to contribute through my work to the world. SUMMARY,,

Over 16 years of hands on experience specializing in Electrical & Instrument and control system and administration.

team player with exceptional communication skills, comfortable presenting to high and executives. ability to determine priorities schedule work well under pressure. well familiar about implementing company rules and regulation with the section. Co- ordinate with other work department crew such as Mechanical, Structure and Civil to carry out corrective maintenance of equipment also co ordinate with warehouse & administration. PERSONAL DETAILS Name Fathers Name Date of Birth Religion Nationality Languages Known Email ID -> Driving license : : : : : : Mohammad Sajid Alam Mohammad Abuzaffar Malik 02.05.1971 Muslim/Islam Indian English, Hindi, Urdu and Arabic

prince_sajidalam@yahoo.com /msalam78612@rediffmail.com : Mumbai, Saudi & Oman : : : : S.S.C & H.S.C Passed. Diploma Engineering in Instrumentation Basic Computer Knowledge Passport No. : Date of Issue : Date of Expiry : Place of Issue : Permanent Address E- 6616991 21.03.2004 20.03.2014 Riyadh (K.S.A)

Educational Qualification Technical Qualification Computer skills Passport Details

Present Address

Md. Sajid Alam C/o Mallick Room Ram Rahim Compound, Bharat Velvet Co. Andheri Kurla Road, Safedpool, Mumbai - 72 Cell No.: +91 9967134180 Tel no:-+91 22 28511408

Md. Sajid Alam At/. Post - Rayees Via - Pakribarawan Dist - Nawadah Pin - 805124 Cell No.: +91-9967134180/ 9931615767

EXPERIENCE DETAILS
GULF EXPERIENCE Company Duration Project Designation Division : : : : : :

C.C.C KUWAIT
06 Jan 2008 to till OL2K II Kuwait(Equate) QA/QC Supervisor E&I Construction work

Company Duration Project Designation Division

: : : : :

C.C.C
th

K.S.A

14 April 2006 to 10th August 2007 Khursania Gas Plant Projects QA/QC Inspector E & I Construction work

DUTIES & RESPONSIBILITIES Co-Ordinate with PMC Inspection Engineer & Construction Supervisors for the Inspection to assure the conformance to the requirement of the KGP/ IEC/ NEPA 70/ IEC Standards, Specification, Codes, Basic Engineering design Data, drawing, method state design pack, specified documents, procedures & company QA/QC RE requirement at minimum cost. Co-Ordination with field Engineering tem and QA/QC Manager regarding Non conformation of construction works, amendments field design. Modification (FDM) and as Built. Preparation/ Review of amendments, Electrical/Instrument work pack, Method statement/ procedure, job safety Analyses sand Inspection test plan, indexes. Inspection of cable pulling, cable laying, cable insulating, cable termination, Installation, cable tray/ conduit, stanchion, Air line piping, impulse line and tubing testing or Inspection of termination multi pair/ multi core cable from junction box to field instrument and equipments. SCOPE OF WORK Prepared all Quality Control Inspection Plan and all construction method, method of material control. Handling and storage, safety plan, quality control plan, method of test, Inspection with test medium and equipment, test and Inspection format to be used. Inspection of all Electrical & Instrument equipment. Preparation of method statement as per project specification, attend QA/QC meeting with the Client, site quality control supervision and Surveillance, Compilation of quality record, auditing verification and follow up corrective actions and checked conformance of sub-contractors work with the project specification. Electrical/Instrument works, Instrument calibration,cable testing, cable puling, & cable tray/conduit inspection and power systems, lighting grounding, Fire Alarm, communication, telephone and Catholic protection, looking all over Electrical works for construction side. all Electrical & Instrument inspection as per the procedur and specification,code and standards used on side IEEE, IEC, ANSI, NEMA, NEC, NESC, API, IPCEA, UL, ISA, NEPA and or Vander standards.

Company Duration Project Designation

: : : :

C.C.C

OMAN

16th Nov. 2004 to 28th Feb. 2006 Shohar Refinery Plant Projects QA/QC Inspector E & I

DUTIES & RESPONSIBILITIES Responsible for the Inspection of al Electrical & Instrument equipment & Trouble shooting of DC Electrical system, Generator panels system, Engines related Electrical system gauges, Starter, Monitor and alternator small vessel system, Inspection of all Electrical receiving material, Inspection of all Electrical receiving and distribution systems and other Electrical process equipment, Industrial Electrodes, HV/LV Transformer, switches gears DC power supplier, UPS, DCS, HV/ LV, Motor & Generator in the field of Construction in petrochemical plant. Inspection of main control center, capacitor power transformer & protection UPS Battery charger protection relay, MV Cable & Electro mechanical, speed sensor, sway detector, control valves with regulator, Use of Econ meter, Mono relay, lode cell, movement alarm resistance, thermometer, Taco meter, Oscilloscope, Phase sequence meter, Galvanometer etc. Inspection of Installation conduit, cable tray, cable laying, form junction box to field instrument and field junction box to (IB) as per project specification Area classification requirement. Installation and termination of multi pair cable/ multi core cable from RIE to junction box and secondary cable junction box to field instrument. Continuity meggering with Client witnessed. Witness Hydro test on Impulse line/ tubing & Air line. Review and check complete plan to meet the right Installation and standard required procedure. Prepare daily accomplishment report & filling of all related document.

Company Duration Project Designation Division

: : : : :

Saudi Ojer

(K.S.A) 05th March 2002 to 20th Sep. 2004 Sabic & Royal Commission QA/QC Inspector E & I Construction work

DUTIES & RESPONSIBILITIES Responsibilities of all Electrical & Instrument site inspection as per inspection test plan (ITP) Preparation of punch list supporting with subcontractor and Client, daily QC Surveillance report to QA Manager day by day, Inspection all construction activity and witness Calibration of Electronics & Pneumatics transmitter like FT, LT, TT, PDT, I/P and Indicator, level troll & Interface level troll and different types of gauges and switches testing of ESD Valves, SOV, control vale to check all Installed Instrument in there correct (Installation and location/ calibration) in accordance with the drawing and projects specification. Re-work of Electrical/ Instruments like conduit, cable tray, cable laying and testing during construction and preparation of test report and QC record as per Client requirement, attend weekly QA/QC Introduction for improvement Quality on site Issue non conformity report (NCR) to subcontractor, proper controlling of handover document and technical document for handover to Client.

Company Duration Project Designation Division

: : : : :

FAFCO (K.S.A) 01st Dec. 1997 to 25th Dec. 2001 Uthmaniyah Gas Plant & Sadgum (Gosp-I & II) Site Supervisor (E & I) Construction & Maintenance

DUTIES & RESPONSIBILITIES To supervise construction activities according to project guide lines and Aramco standard. Preparation of Quality control document Implementation of Installation acceptance test, verification of Instrument loop drawings, Hookup drawing, ILD & P I D, Preparation of loop folders and distribution to CCR or Supervised no of main power, arranging the necessary materials from the main store to sites & site store work with project site fabrication of support, junction box frame, bracket, stanchion and Installation of junction box, cable tray, conduit work and Instrument stanchion, Instrument transmitters.

Company Duration Project Designation Division

: : : : :

ISCO

W.L.L. 20th Dec. 1994 to 13th Sep. 1997 Doha Power plant & Equate Ethylene Plant Site Supervisor (E & I) Construction & Maintenance

DUTIES & RESPONSIBILITIES Supervised no of main power, arranging the necessary materials from the main store to sites & site store work with project site fabrication of support, junction box frame, bracket, stanchion and Installation of junction box, cable tray, conduit work and Instrument stanchion, Instrument transmitters. Secondary cable pulling, glanding, wiring, termination is in accordance with wiring, details drawing, cable and wires identification togged or identification as per project specification and Air line, impulse line, tubing, compliance with the hookup, ILD/P &ID Drawing, Air line, Impulse line, tubing testing as project required with standards. All types of instrument work the check and review complete plan to right Installation of Electrical & Instrument. EXPERIENCE IN INDIA Company Duration Project Designation Division Company Duration Project Designation Division : : : : : : : : : : ICB Ltd. 02nd May 1992 to 20th Nov. 1994 R.P.C.L Hazira Site Supervisor (E & I) Construction & Maintenance PCT (I) Pvt. Ltd. 08th March 1989 to 28th July 1991 H.P.C.L ( A.P) Site Supervisor (E & I) Construction & Maintenance

DUTIES & RESPONSIBILITIES Inspection of hold/ witness/ review/ surveillance point assigned as per ITP for all Electrical Installation and construction work. Reviewing contracts, developing quality documentation, project specific quality plans, HSE Plans, Inspection and test plant, procedure, Risk and Job hazard Analysis for power industrial, Oil & gas and Petrochemical & refinery, technical submission during bids and after award of contracts. Overall responsibility for the implementations of the Quality control progress on the LNG Plant for all onsite and offsite construction and procurement surveillance activities. Responsibility for the management and coordination of the third party inspection contract and al liaisons with Client Inspector to ensure the timely of all certification permits to assist company facilitates License to operate. Provided monthly QA report of the project advising the status of the Quality control programs including problems areas with quality control certification and proposed action. Interview and provided recommendation to company for the hire deployment and coordination of all site QA personal, Supervisors, coordinate and provide effective leadership for all QA/QC Personal, lead and coordinate site construction audit. Ensure adequate inspection coverage for all site based QC activity including welder qualification, Electrical Qualification, Concrete testing, Pile Foundation testing, lifting and heavy Equipment Inspection, Soils/ Road, pavement equipment test and Hydro test. Well conversant with the project requirement of SHELL, KNPC (Kuwait National Petrochemical, RPMAA) (Re-Construction Project Mina Al-Ahmadi) and other oil field companies. Well conversant with all Electrical works, power systems (HV/LV)Lighting system, Earthing system, Cathodic protection, Telecommunication & Control of Fire systems. Advising the project Manager (E&I) of all project quality assurance and Quality control and HSE aspects and interface problems that effect the discipline operation of the project. Monitor the development, review, revision and issuing after approval for implementing the project Quality and project procedures. Review method statement/ Inspection and test plan and work pack to issued to client for compatibility with project specification and Quality systems Standards. Monitor and approve the reviews of Quality and HSE Related problems and verification that respective Nonconformance reports are action or Co-Ordinate on a frequent and effective basis. Assist project management team in ensuring that Document control is functioning and is effective to meet the contract requirement for the issued of Technical queries and concession.

Supervise and control on a day-to-day basis the project QA/QC Surveillance activities and work. Develop checklist and perform contract compliance audit of major subcontractors. Carry out audit and assessments in according with company procedure and ensure that system defects are revealed and resolved. Liaise with clients QA Manager and respond to audits carried out by the Client. Monitor construction and installation activities such as manufacturing procedure 3 qualification etc. Arrange for the ongoing preparation of any project QA Dossier including spare parts and operation and maintenance manual, Handling over required by Client at the time of contract completion. Co-ordination with Client and consultant for getting Discipline acceptance certificate of provisional Acceptance of works. System complication and hand over to client according to schedule and project requirement, data base control through Win PCS, International latest Database program for system complication and Handover, fully knowledge of read, write and Updating all data in Win PCS, like DPL, MCPL, MCC, MC, PSC, IRFSU, HOP & RFSU.

Date

: MD SAJID ALAM Signature of Applicant

_ Place : Mumbai Cell no:-+91-9967134180

You might also like