Professional Documents
Culture Documents
1010
KG - 01A
DP A SsoCIA7.6
at the site. the pile will be surveyed and marked on site by a steel pin. Two (2) reference steel
nce from the steel casing to the reference pins will be measured and adjustments made t
KG - NA
3. POSITJON OF BORING PLANT
3.1
3.2
Th6.,boring plant will be moved to the pile points intended for excavation.
The
11
ly bar mounted with an auger is placed just above the pile point. The
verticality, of the Kelly-'bar should be checked by means of a spirit level. 3.3 Necessary justrn/ent shall be made so as to enable the Kelly bar to be as vertical as possible. Then the position of the auger is checked against the pile point. The auger is then lowered and boring operation commences. e onable care should be taken so that the pile position and verticality are -constructed within the specified tolerance. 4.
4.1
BORING PROCESS
Visbally, an auger of the required type and size is used to excavate the hole, 7I
d powerful in removing cohesive soil in dry hole. Once the ground',waters seep into the borehole: the short a soil-boring budket.
uld be checked for its stability. If the excavated hol "' is collapsible, temporary casing of the same siz the required depth or when hit rock.
NT
over the prebareO_bDl point. Check the verticality of the frame by vertical spirit level.
ent including hydraulic power pack, hydraulic hoses. cooling system and control panel. e and shift near to the piling frame.
ng frame and hook on to the pile for positioning it to the intended pile point. Check the pile verticality be
e piling frame.
e the pile head is not damaged and the hammer is centered on the head of the pile. be checked before driving proceeds.
sly being recorded at regular interval i.e. every 0.3m. --' The piling frame is shifted to ne equipment havelto be shifted to new pile cap location and the process
repeated as ite
Pile integrity can be check by carry out the pile integrity test or pile dynamic analysis tes
KG - 01A
ery wet and the use of rubber boots is essential; these shall be reinforced by steel not only in the toes
KG-01A
9. FLOW CHART FOR DRIVEN PILE USING-PREBOR4NG
BORING
DRIVING OF PILE
TAKEN SET