Professional Documents
Culture Documents
www.onecitytransitplan.com
OneCity
www.onecitytransitplan.com
EAST
1. Replace the Scarborough RT with a subway (Kennedy Station to Sheppard & McCowan) Build a Scarborough Express rail line (Steeles to Union Station)
Extend the Sheppard LRT line to: (A) Meadowvale (B) Malvern Town Centre (C) Toronto Zoo Build a Scarborough Malvern LRT line (Kennedy Station to Sheppard & Morningside)
2.
3.
4.
EAST
1.
Replace the Scarborough RT with a subway (Kennedy Station to Sheppard & McCowan) Build a Scarborough Express rail line (Steeles to Union Station)
Extend the Sheppard LRT line to: (A) Meadowvale (B) Malvern Town Centre (C) Toronto Zoo Build a Scarborough Malvern LRT line (Kennedy Station to Sheppard & Morningside)
2.
3.
Toronto Zoo and Rouge Valley National Park University of Toronto and Centennial College campuses
4.
WEST
1. Build an Etobicoke Express line (Airport to Union Station) - electrify existing lines - add more stops - accept regular fares
Extend the Eglinton Crosstown LRT line (Jane to Pearson Airport) Extend the Finch West LRT line (Humber College to Pearson Airport) Build a Jane LRT line (Steeles to Bloor) Extend the St. Clair streetcar line (Keele To Jane) Build a Waterfront West LRT line (Union Station to Long Branch) Build a Wilson BRT line (Wilson station to Keele)
2. 3.
4. 5. 6. 7.
Humber College
1.
WEST
Build an Etobicoke Express line (Airport to Union Station) - electrify existing lines - add more stops - accept regular fares
Extend the Eglinton Crosstown LRT line (Jane to Pearson Airport) Extend the Finch West LRT line (Humber College to Pearson Airport)
2. 3.
4. 5. 6. 7.
Extend the St. Clair streetcar line (Keele To Jane) Build a Waterfront West LRT line (Union Station to Long Branch) Build a Wilson BRT line (Wilson station to Keele)
Centennial Park
NORTH
1.
2. Build a Sheppard West subway (Sheppard Station to Downsview Station) 3. Build a Finch LRT line (Keele to Yonge)
4. Build a Don Mills LRT line (Steeles to Eglinton)
York University
NORTH
1.
2. Build a Sheppard West subway (Sheppard Station to Downsview Station) 3. Build a Finch LRT line (Keele to Yonge)
4. Build a Don Mills LRT line (Steeles to Eglinton)
SOUTH
1.
2.
3.
SOUTH
1.
2.
3.
N
S S
$1,541
$5,400 $995 $6,900 $1,500 $160 $170 $123 $1,845 $1,874 $851 $1,488 $767 $762 $1,420 $287 $335 $333 $102 $127 TOTAL $28,810
3.8
10.2 --26 22 2 1.8 1.6 12.5 11 6.6 15.2 6.1 6 10.7 1.5 9.6 9.4 1.7 3.5 170
E, S Build a Scarborough Express line (Steeles to Union Station) W,S Build an Etobicoke Express line (Airport to Union Station) E E E E W W W N N S E E W W Extend the Sheppard East LRT line to Meadowvale Extend the Sheppard East LRT line to Toronto Zoo Extend the Sheppard East LRT line to Malvern Build a Scarborough Malvern LRT line (Kennedy Station to Sheppard & Morningside) Extend the Eglinton Crosstown LRT line (Jane to Pearson Airport) Extend the Finch West LRT line (Humber College to Pearson Airport) Build a Jane LRT line (Steeles to Bloor) Build a Finch West LRT line (Keele to Yonge) Build a Don Mills LRT line (Steeles to Eglinton) Build a Waterfront East streetcar line (Union Station to Parliament) Build an Ellesmere BRT line (Scarborough Centre to East boundary) Build a Kingston BRT line (Victoria Park Station to Eglinton & Kingston) Extend the St. Clair streetcar line (Keele to Jane) Build a Wilson BRT line (Wilson Station to Keele)
W,S Build a Waterfront West LRT line (Union Station to Long Branch)
$995
$6,900 $1,500 TOTAL $18,166
--26 22 71.5
E, S Build a Scarborough Express line (Steeles to Union Station) W,S Build an Etobicoke Express line (Airport to Union Station)
SIX 72 $18
W,S Build a Waterfront West LRT line (Union Station to Long Branch)
$127
TOTAL $1,184
3.5
25.7
Building an LRT: $1.8 billion (Metrolinx has committed $1.8 billion) Building a subway: $2.3 billion Difference: $484 million
First Projects:
Building an LRT: $1.8 billion (Metrolinx has committed $1.8 billion) Building a subway: $2.3 billion Difference: $484 million
Eliminates the need to shut down the SRT for 4+ years:
Eliminates the need for 43 shuttle buses
Eliminates the cost of shuttle buses of $15 million a year
Advantages
Cost of building an Waterfront East streetcar line: $287 million This includes a large commitment from Waterfront Toronto
First Projects:
CURRENT MODEL
2012 Overall property values
(all classes weighted assessment)
PROPOSED MODEL
2012 Overall property values
(all classes weighted assessment)
$646B
Municipal tax rate
(residential rate)
+4.7%
$676B
Municipal tax rate
(residential rate)
+4.7%
$676B
Municipal tax rate
0.562%
Municipal tax revenue
(all classes)
(all classes)
0.537%
Municipal tax revenue
(all classes)
0.547%
Municipal tax revenue
$3.63B
Same
$3.63B
Increase
Note: Before any budgetary tax increase
$3.7B
(+$68M or a 1.9% increase)
Increased Revenue
$272 $272
$272
$272
250
$204
200
150
$136
100
$68
50
2013
2014
2015
2016
2017
2018
2019
Provincial Partner
Federal Partner
$1 billion/year
Average House
$180
$180
$180
160
140
120 100 80 60 40 20 0
2013
2014
2015
2016
2017
2018
2019
Percentage
Source: www.sellhomestoronto.com
6,000
5,000
4,000
RICHMOND HILL
3,000
2,000
1,000
TORONTO
MISSISSAUGA
MARKHAM
VAUGHAN
BRAMPTON
Taxes
PICKERING
AJAX
Six subway/train lines, totalling 71 kms Ten LRT lines, totalling 73.5 kms Five bus/streetcar lines, totalling 26 kms
Summary
www.onecitytransitplan.com
The new lines have the potential to move 300 million passengers per year
OneCity
www.onecitytransitplan.com