Service Supply Chain Strategies to Increase Corporate Profitability

About the Author: Morris Cohen is the Matsushita professor of manufacturing and logistics at the Wharton School of the University of Pennsylvania, and co-director of Whartons Fishman-Davidson Center for Operations Management. Dr. Cohen has spent years researching, planning, and designing advanced value chain systems working with customers such as IBM, Cisco, Applied Materials, Intel, General Motors, and the U.S. Navy. In 1999, he founded MCA Solutions to bring the intellectual capital of service value chain optimization from the classroom into the technology marketplace. Dr. Cohen holds a B.S. from the University of Toronto, and an M.S. and Ph.D. from Northwestern University.

Abstract: The last decade has witnessed a substantial shift in emphasis on the part of many OEM manufacturers from a focus on the products they produce to a concentration on their customers and the value that their customers derive from ownership and use of these products after the initial product sale. The importance of service is made clear in a recent AMR survey[1] of manufacturing companies which revealed that service represents 24% of their revenue and 45% of their profit contribution. With only 20% of IT spend allocated to service, there is indication of value in increasing corporate attention to the service area.

With an increasing awareness of the strategic value of service, companies are beginning to focus on their service supply chains, which can be defined as the network of resources that includes the appropriate service parts, customer engineers, and infrastructure for material movement and storage, repair, transportation, information systems, and communication.

This shift toward a service-centric strategy represents an important aspect of firms efforts toward enhancing overall revenue and profitability, customer acquisition and retention, and competitive differentiation.

In this paper, we describe the unique challenges of the service supply chain, and a framework for understanding the service management decision hierarchy. Most importantly, we highlight the dramatic value proposition available to companies that deploy advanced service strategies and decision-support tools to address these challenges. Brief case studies from leading service

organizations Cisco and KLA-Tencor describe examples of successful deployments of service supply chain strategies that leverage this approach.

INTRODUCTION: SERVICE SUPPLY CHAIN CHALLENGES The mechanisms required to design, produce and deliver service products in a cost-effective and competitive manner are quite different than those used to manufacture goods, and to procure direct materials. Significant assets must be dedicated toward service delivery. The task of effectively deploying these assets across a wide network of locations and fulfilling demand which is driven by infrequent service events is a daunting one. Figure 1 shows a representation of a typical multiechelon service supply chain network, and the resulting material flows required to supply material and to fulfill demand.

As a specific example of a service supply chain, consider Cisco Systems Global Product Services, which manages a complex supply chain consisting of the following elements:

Over 10 million service contracts defined in terms of specific customer performance targets (i.e., high priority with 2-4 hour response time guarantee, 8-12 hour response time and next business day response time), with thousands of service contract transactions per day. 3-5 echelons consisting of nearly 750 stocking locations (including a central depot, regional warehouses, local warehouses and forward locations positioned at or near major customer sites) required to position inventory close to the customer to support rapid response. Hundreds of supported products that are mission critical to customers (e.g., net servers, communication systems), with more than 100,000 part numbers supported throughout the service supply chain. Most of these parts have very infrequent demand, with global demand rates of fewer than 10 hits a year not uncommon.

FIGURE 1) MULTI-ECHELON SERVICE SUPPLY CHAIN MATERIAL FLOWS

While not all manufacturers face this level of complexity, it is not surprising that performance metrics are vastly different from the production supply chain, as indicated by a recent Wharton benchmark study that showed that inventory turns of 1 to 2 are common for providers of same-day

service agreements[2], even for manufacturers whose production supply chains show turns of 50 to 100.

RISK-MANAGEMENT FRAMEWORK FOR DECISION MAKING Given the complexity of the service management problem, it is appropriate to decompose it into a collection of interrelated decision problems. Figure 2 illustrates the levels of managerial decision making that we have observed in many service supply chain environments. Each of the following components corresponds to a different period of the planning horizon, over which managerial tradeoffs and objectives must be considered as the relevant decisions are made.

Budget Planning is in the longest decision timeframe, with a planning horizon typically measured in months or years, where decisions that determine specification of the overall service strategy are made. Such decisions can include design of the products being supported, the design of the service products that are offered to customers in the after-sales market, and the design of the infrastructure used to deliver these service products.

Strategy Planning decisions are made in shorter timeframes, typically weeks and months. At this level, management is concerned with the forecasting and strategic positioning of its material and human resources in anticipation of the need to meet customer service demands in a manner consistent with the response, and cost entitlements as set out in the warranty and service agreements. These strategic resource deployment decisions give rise to a challenging optimization problem that must be solved periodically if the service strategy is to be implemented in a costeffective manner.

Tactics Planning decisions are made at a nearer-in planning horizon (weeks, days, or hours), and include the re-deployment decisions that are associated with re-positioning resources within relevant lead times to meet the service objectives and resource levels defined in the strategic plan. This includes generation of orders for service parts allocation (from a central to field location in the network), replenishment (from the network to external sources of supply for repair and new buy), and transshipment (across parallel nodes in the network).

FIGURE 2) INTERACTIVE DECISION HIERARCHY

It is important to note that all of the resource decisions described in Budget Planning, Strategy Planning and Tactics Planning must be made prior to the occurrence of a particular service event whose fulfillment will require use of those resources. Hence these decisions are based on estimates of future resource requirements along with visibility of all of the events that affect supply and demand of such resources that have occurred throughout the service supply chain prior to the occurrence of the service event in question.

Given the random nature of service events, it is clear that demand uncertainty cannot be eliminated through forecasting, and hence, trade-offs must be evaluated on the basis of future risk assessments captured by estimates of the demand probability distribution relevant to specific customer products and locations at particular future points in time. The decisions made at all pre-event planning levels, (Budget, Strategy and Tactics), thus constitute an exercise in risk management.

Event Management is the last mile of decision making in the planning horizon hierarchy which concerns fulfillment after service event-based demands for resources have been made (e.g. part failure). This is where the service product is actually produced to meet the goals of customers. Intelligent decision making here can improve the performance of the system by allowing managers to make the best use of current and projected resource deployments throughout the service supply chain. This framework has a global perspective which has implications for the organization, tools, and processes to effectively deliver a service strategy

RISK MANAGEMENT SOLUTIONS TO DRIVE THE EFFICIENT FRONTIER Balancing the tradeoffs among revenue, cost and service is challenging because of escalating service expectations, complexity of the service supply chain, and, as mentioned before, the high degree of uncertainty associated with service events. The results of the planning decisions are best expressed using the concept of an efficient frontier curve as shown in Figure 3. This demonstrates that, in general, the greater the promised level of service performance, the larger the required investment in such assets, which increases the total costs incurred by the service provider. Note that the curve rises steeply: the costs increase disproportionately as the promised service performance level increases.

FIGURE 3) THE SERVICE SUPPLY CHAIN EFFICIENT FRONTIER

Over the past decade, firms have made great progress in implementing transaction disciplines and traditional service supply chain systems, moving them from point A to point B towards a more efficient frontier. As companies have increased service levels by moving from point B to point C along the efficient frontier, they have found further progress difficult, limited by traditional modes of planning. These traditional modes of planning found in first-generation service supply chain systems are inspired by manufacturing and finished-product distribution thinking (e.g., ERP and DRP), which attempt to match service supply to demand by assigning enabling resources to specific service products in a static and separable fashion.

After years of research and development of solutions for the service supply chain with organizations such as IBM, General Motors, and the U.S. Navy, and after observing that no existing commercial software solutions addressed the risk management nature inherent in the service supply chain, MCA Solutions developed the Service Planning and Optimization (SPO) suite of products for strategic and tactical planning of the service supply chain. In successful implementations with customers across a variety of industries, it has been repeatedly proven that implementation of SPOs dynamic planning capability in traditional planning environments shift the efficient frontier as demonstrated in the movement from point C to point D in Figure 3, resulting in 10% to 30% reductions in inventory at the same service levels.

These dramatic performance improvements are enabled by the capability demonstrated in Figure 4, which is a comparison of traditional planning approaches for the service supply chain to MCA's Risk Management Approach.

Area

Traditional Planning Approach SPO Dynamic Planning Approach

Forecasting Production-based forecasting from historical demand that doesnt recognize probabilistic nature of demand A proprietary composite forecasting methodology that combines time series demand history with causal factor projections to generate item location-specific estimates of usage probability distributions Positioning Each part location and inventory echelon planned in isolation or in planning groups without considering multi-echelon and system interactions State-of-the-art multi-echelon optimization based on rapid solution algorithms and a robust model/system architecture that can be applied across a wide range of industries and company contexts Tactical Planning Deterministic DRP type logic using discrete forecasts not suited to intermittent demand environment and characterized by unplanned, reactive expediting Risk-based decision making that incorporates the probability of stockout in all order generation and deployment activities, integrating strategic and tactical planning

Fulfillment & Service Fulfillment to traditional fill rate metrics. Fulfillment strategy not tied to asset management strategy Differentiated service-level commitments enabled by strategic positioning of inventory, including availability-based planning that maximizes product uptime for budget constrained multi-echelon, multi-indenture, multi-period environments FIGURE 4) A FUNCTIONAL COMPARISON OF TRADITIONAL VS. RISK MANAGEMENT

Approach for the Service Supply Chain

Cisco Systems, described earlier, is one of several companies that has effectively transitioned its service supply chain utilizing MCAs SPO dynamic sparing capability to replace its legacy static sparing functionality. In a 5-month worldwide implementation of MCAs SPO, rolled out to over 1,000 users, Cisco achieved a 21% reduction in inventory levels, and a service level increase to 97% from 94%. Not only did Cisco move its efficient frontier downward, it is also now able to negotiate the curve more effectively by simulating the cost/service tradeoffs as it develops new service offerings.

SUCCESSFUL IMPLEMENTATION APPROACHES: While there is a clear opportunity to increase service performance and profitability through implementation of advanced service planning software, the business world is replete with stories of failed software implementations. In this section, we review successful implementation strategies intended to reduce the risk of implementation and to deliver rapid time to value.

KLA-Tencor: Risk Reduction through a Data-Driven Evaluation KLA-Tencor is the world leader in yield management and process control solutions for the semiconductor manufacturing industry, and supports equipment across 400 fabs in a capitalintensive environment in which an hour of downtime can cost hundreds of thousands in revenue. With a challenging environment - 75% of its supported parts have 1 demand or less globally a year KLA-Tencor found itself unable to meet its service commitments using its legacy software solution.

In late fall 2001 KLA-Tencor initiated an extensive evaluation of available solutions for service supply chain planning. In addition to reviewing vendors responses to functional requirements, KLA-Tencor determined it was imperative to operationally test the solutions through a data-driven use case evaluation to provide the following analysis of solution capability:

Direct comparison of vendor solutions in operating environment

Development of a credible business case based on actual solution results Understanding of vendors ability to model business environment and data Understanding of implementation risk pre-contract signing KLA-Tencor selected MCA based on superior performance in the evaluation, and was able to immediately implement the SPO recommended target stocking levels by leveraging the model developed in the evaluation process. In just two months after contract signing, KLA-Tencor achieved a positive return on its investment through an implementation in a hosted environment, and subsequently rolled SPO out as an internally hosted solution, ultimately realizing an 18% improvement in local fill rates, and a 4% reduction in supply chain cost as percent of revenue.

Telecom Equipment Provider: Rapid Deployment of Service Product Strategy Through Outsourcing

A leading provider of bandwidth management equipment to telecom service providers such as MCI, SBC and Verizon, traditionally sold parts to customers from a central distribution center as part of a product sale, with the expectation that the customers would manage the planning and stocking of parts themselves. Driven by competitive and market pressures, this company made a decision to offer same-day service contracts to its customers, requiring positioning of service parts across a network of strategic parts centers located close to its customer base.

To quickly succeed in the strategic spares management arena, it was vital for the equipment provider to build a strategic parts infrastructure and provide parts in expedited timeframes, while providing its customers the highest level of customer service. The equipment provider selected DHL Logistics to provide the warehousing, transportation and execution of service parts logistics. The company had a successful implementation of SAP ERP, but found that its planning approach was not appropriate for service parts management, and asked DHL to provide a service parts planning software solution. DHL teamed with MCA Solutions to provide a hosted software solution for forecasting and planning of parts in the new network.

Within two months of vendor selection, the equipment provider had deployed new strategic parts locations, implemented the logistics processes required to deliver the expanded service, and through deployment of the planning software and process, realized a service parts inventory reduction of over 60%. Through intelligent outsourcing and effective deployment, it was able to deliver a much-needed service to its customers more rapidly than if the company had managed the transformation with internal resources and systems.

CONCLUSION

Increasing corporate realization of the value of service has focused attention on an area that managers of service supply chains have always recognized as a high stakes gamble requiring decision making in a complex and risky environment. The advanced and dynamic service management approach that we are proposing here is a way to formally introduce the concepts of flexibility and planned responsiveness into the area of service delivery, allowing service managers to better manage in this environment, which is much different than the traditional production supply chain.

The dynamic service management approach described here can deliver significant financial benefit to service organizations and help them achieve supply chain flexibility. Service organizations cannot afford to neglect the potential to deliver business value in todays hyper-competitive, customercentric world where service is often the key competitive differentiator.