PDE
Mass Transit Control Table Signalling Scale Plan SER/IMR Bookwiring Track Circuit Bonding Plan DTG-R/CBTC Scale Plan WESTRACE Data Design Auto Wiring MCT/DMC Data Preparation Correlation Drawings Design Note
Min. Items 2 2 2 2 2 2 2 2 2 2
Item Score 10 10 10 10 10 10 10 10 10 10
Min. Score 20 20 20 20 20 20 20 20 20 20
Mainline Scheme Plan Bonding Plan Free wired Int. designs Control Tables LAP TFM Schematic Cable Plan / Schematics Route Table Aspect Sequence Chart Signal Design Specification Stage Designs Fringe Designs
Min. Items 2 2 2 2 1 2 2 2 2 1 2 2
Item Score 10 10 10 10 10 10 10 10 10 10 10 10
Min. Score 20 20 20 20 10 20 20 20 20 10 20 20
No
Yes
No
T-Gate-2
Evaluation Committee
Yes
Yes
Min. Items 15 5
Item Score 4 20
Data WESTLOCK Data SSI Data WESTRACE Data Axle Counter Data
Min. Items 2 1 1 2
Item Score 20 40 40 20
Min. Score 40 40 40 40
Training-2
No
Gate-2
No
Eligibility
DE
Mass Transit
Yes
Score Card
All activities in BOLD are mandatory to be completed At least 4 activities to be performed with minimum score in addition to mandatory activities for ADE - Mass Transit & Mainline cells At least one activity to be performed with minimum score in addition to mandatory activities for ADE - Data cell At least 6 activities to be performed with minimum score in addition to mandatory activities for DE - Mass Transit & Mainline cells At least 2 activities to be performed with minimum score in addition to mandatory activities for DE - Data cell At least 3 activities to be performed with minimum score in addition to mandatory activities for PDE - Mass Transit cells At least 5 activities to be performed with minimum score in addition to mandatory activities for PDE - Mainline cells All activities to be performed for Dimetronic cell
Yes
T-Gate-1
Yes
Evaluation Committee
Yes
SER/IMR Bookwiring Control Table Signalling Scale Plan Track Circuit Bonding Plan DTG-R/CBTC Scale Plan DTG-R Data Preparation WESTRACE Data Design Location Case Design MCT Screen Design Auto Wiring MCT/DMC Data Preparation C3D Data Preparation Correlation Drawings Record Updates Design Note Cable Schematics
No
No
Training-1
No
Gate-1
Dimetronic
CTC/PLO Graphic Screen Design CTC/PLO Data Generation CTC/PLO Data Testing ERTMS Data entry using GDE tool ERTMS Data Compilation ERTMS Data Simulation and Testing
Min. Items
15 10 15 20 10 10
Item Score
4 4 4 4 4 4
Min. Score
60 40 60 80 40 40
Data
Screen Design SPECTRA Design WESTLOCK Data WESTRACE Data SSI Data ATP Data Design
Min. Items 6 5 2 2 2 2
Item Score 5 10 30 20 20 10
Min. Score 30 50 60 40 40 20
No
Eligibility
ADE
Mass Transit Microstation/AutoCAD Location Case Design Auto Wiring Bonding Plan SER Bookwiring Auto site Cable Schematics MCT Screen Modification work Westrace I/O Auto site or Front End Processor Scale Plan
Yes
Gates
Min. Items 30 10 2 2 5 5 2 3 5 Item Score 1 2 5 5 4 2 10 3 2 Min. Score 30 20 10 10 20 10 20 9 10
Eligibility
Minimum score to be eligible to go to Gate for vertical/lateral movement Evidences will be checked during the process Minimum score to be achieved in each category until & unless specified
Mainline Microstation/Auto CAD Location Case Design Screen Design Tracing Work Red/Green mod work Level Crossing REB / SER Bonding Plan Cable Schematics
Generic Guidelines Any lateral movement from one domain to other, within same competency level will follow below generic path where X denotes current domain & Y denotes target domain
No
T-Gate
Test conducted based on trainings received
Min. Items
10 10 5 5
Training
T-Gate
Yes
Dimetronic
CTC/PLO Graphic screen design using PCGE/CTC tool CTC/PLO Data Generation ERTMS Data entry using GDE tool ERTMS Data Compilation
Data
Microstation/GCSS/WTW/ Spectra tools Screen Design (GSIM/WESTCAD) Interface Data Design Simulation Data
Item Score
3 4 10 10
Min. Score
30 40 50 50
Evaluation Committee
Test the knowledge & check the competency for the next level Review the evidences of the score card
Credit criteria to be defined for lateral movement Any lateral movement on requirement basis
~3 Yrs
~5 Yrs
~7 Yrs