Professional Documents
Culture Documents
Production
Distribution
Multi Utility
Responsibilities Aqualectra
100% water production 100% water distribution 90% electric power generation 100% electric power distribution
Characteristics continued
All power generation on transmission & sub transmission level Less then 1% of energy losses in transmission & sub transmission level Less then 2% of energy losses in distribution system Almost 9% of energy losses in LV system
History wind generation Curacao Renewable energy is part of our business plan since the 1970s Resulted in contract agreement in 1984 for the first wind generator for Curacao at Tera Kora. Wind generator was a 300 kW NEWECS-25 of manufactory FDO-Stork Type was fixed speed induction generator with stall This first wind generator became operational in October 1985
Experience first wind generator First wind generator tripped frequently on over speed Brakes suffered excessive wearing Major breakdown due to braking system of wind generator Extensive wind measurement and wind study
Results study
Wind in Curacao comes 95% of the time from the same direction between NE and SE Wind speed is almost constant year around Average wind speed at 30 m is 8 - 9 m/s Weibull shape factor between 4 and 5 Best sites Tera Cora and Playa Kanoa First wind generator was designed taking into account a wind speed of 6.5 m/s measured at 10 m, based on 30 years wind measurement done by the metrological service of Curacao
Continued
After fine tuning these problems were solved and wind generators only trip when the deviations exceed the set values, which is hardly never. The wind farm even withstand most of the faults in the electrical system.
Dilemma
According to our utility plan the idea is to reach approximately 50% penetration level with wind energy by the year 2020. Study implemented in 1995 shows maximum penetration level of 12% due to reactive power consumption of induction type wind generators with stall or active stall. First wind farm is reaching 15 years which was its technical lifetime ( ROI reached after 9 years) Increasing fuel prices make wind energy very attractive option to stabilize costs.
How to proceed?
Aqualectra is preparing a grid connection standard for Independent Power producers including Wind farms. Standard shall at least include: Voltage ride through requirements; Voltage control and reactive power capabilities; Off nominal frequency operating requirements; Power quality, harmonic and resonance issues; Monitoring requirements; Commissioning tests.
Continued
If the results of the studies are positive the first wind farm of Aqualectra will be replaced by a new one before 2010. Probably 12 x 1 MW generators instead of 12 x 0.25 MW. The site has space for approximately 25 wind generators. The experience with this new wind farm will show if it is feasible to upgrade the Playa Kanoa wind farm from 18 x 0.5 MW to 18 x 1 MW units or bigger.
Conclusions
Wind power is very attractive option for Aqualectra Grid connection standards must be in place to prevent future problems with reactive power consumption and frequency fluctuations. With stall and active stall induction generators the penetration level for wind power in Curacao is limited to 12% which was already reached in 2000. Doubly fed induction generators and Full converter wind generators promise to solve actual problems Aqualectra encountered with wind power Hopefully this can increase the maximum penetration level of wind power in Curacao up to at least 50%
Questions?