MTRCL KOWLOON STATION DEVELOPMENT PACKAGE 7, KIL 11080 Design & Construction of Friction Foundation Diaphragm Wall, Shaft

Grouted Barrettes

The site is located within the West Kowloon reclamation nearby the existing MTRC Kowloon Station.

Foundation for a prestigious project, one of the tallest towers in the world, 100m deep barrettes for around 500m tall building.
P48
P47

P51

P52

P53

P54

P55

P56
P1

P50
9 P4

P2
P3

P4
P5

P36

Due to the variable level, to the excessive depth and to the uncertain grading of the rock, the shaft grouted friction barrettes were 2800x1500 adopted as the foundation system. Barrettes are located 2800x1000 a within Trial barrettes 76m diameter circular shaft. The shaft is designed for four level Primary DW panel basement and 25m deep excavation. Secondary DW panel Before the commencement of the actual works, an extensive testing programme took place on 5 preliminary barrettes in order to check and confirm the design parameters. Beside the difficult soil conditions, the main challenger was the programme of the works. Three reverse circulation excavation machines and a maximum of labour and staff have been mobilized for a successful completion of the works. SCOPE OF WORKS: Design and Construction of: Circular shaft 76m diameter, using Diaphragm Wall 1.5m thick, 70m deep. 287 shaft grouted barrettes 1m and 1.5m thick and up to 105m deep. Perimeter composite retaining wall (sheetpiles and slurry wall), 10,500m of slurry cut-off wall. Pumping test, instrumentation and monitoring including monitoring of the adjacent MTR tunnel and structures. 5 preliminary barrettes and 5 loading tests, 4000 T each, to check out and confirm the design parameters.

P4 6

P6

P4 5

P7

P44

P8

P43

P9

P42

P10

P41

P11

P40

P12

P39

P13

P38

P14

P37

P15

P16

P3

P1 7

P3

P18

P33

From design

to construction

MAIN QUANTITIES Excavation Concrete Steel Shaft Grouting Cut-off Wall : : : : : 90,252 m 80,600 m 7,687 T 159,000 m 10,500m

Design of the raft (76m diameter, 8m thick) Construction Period : February 2002 to March 2003

9 P1
P20

P21
P22
P23
P24

P25

P26

P27

P28

P29

P30 0

P3 1

P32

MTRCL KOWLOON STATION DEVELOPMENT PACKAGE 7, KIL 11080 Design & Construction of Friction Foundation Diaphragm Wall, Shaft Grouted Barrettes

CLIENT : Sun Hung Kai Properties Ltd.

ENGINEER : Ove Arup & Partners HK Ltd.

MAIN CONTRACTOR : BSG-INTRAFOR Joint Venture

Shaft Grouting Cement grout is injected at high pressure in order to enhance the friction at the interface concrete/soil.

HEADQUARTERS

VSL International AG Switzerland Phone: +41 32 613 30 30 Fax: +41 32 613 30 55

Preliminary Static Load Test 4000T

REGIONAL OFFICES

Asia & Pacific VSL-Intrafor Asia, Hong Kong Phone: +852 2590 2288 Fax: +852 2590 0290

Central East Europe, Middle East, France & French Speaking Countries, Africa VSL France France Phone: +33 1 39 44 85 85 Fax: +33 1 39 44 85 86

Iberian Peninsula, South Africa and Latin America CTT Stronghold Spain Phone: +34 93 289 23 30 Fax: +34 93 289 23 31

www.vsl-intl.com

You might also like