Grouted Barrettes
The site is located within the West Kowloon reclamation nearby the existing MTRC Kowloon Station.
Foundation for a prestigious project, one of the tallest towers in the world, 100m deep barrettes for around 500m tall building.
P48
P47
P51
P52
P53
P54
P55
P56
P1
P50
9 P4
P2
P3
P4
P5
P36
Due to the variable level, to the excessive depth and to the uncertain grading of the rock, the shaft grouted friction barrettes were 2800x1500 adopted as the foundation system. Barrettes are located 2800x1000 a within Trial barrettes 76m diameter circular shaft. The shaft is designed for four level Primary DW panel basement and 25m deep excavation. Secondary DW panel Before the commencement of the actual works, an extensive testing programme took place on 5 preliminary barrettes in order to check and confirm the design parameters. Beside the difficult soil conditions, the main challenger was the programme of the works. Three reverse circulation excavation machines and a maximum of labour and staff have been mobilized for a successful completion of the works. SCOPE OF WORKS: Design and Construction of: Circular shaft 76m diameter, using Diaphragm Wall 1.5m thick, 70m deep. 287 shaft grouted barrettes 1m and 1.5m thick and up to 105m deep. Perimeter composite retaining wall (sheetpiles and slurry wall), 10,500m of slurry cut-off wall. Pumping test, instrumentation and monitoring including monitoring of the adjacent MTR tunnel and structures. 5 preliminary barrettes and 5 loading tests, 4000 T each, to check out and confirm the design parameters.
P4 6
P6
P4 5
P7
P44
P8
P43
P9
P42
P10
P41
P11
P40
P12
P39
P13
P38
P14
P37
P15
P16
P3
P1 7
P3
P18
P33
From design
to construction
MAIN QUANTITIES Excavation Concrete Steel Shaft Grouting Cut-off Wall : : : : : 90,252 m 80,600 m 7,687 T 159,000 m 10,500m
Design of the raft (76m diameter, 8m thick) Construction Period : February 2002 to March 2003
9 P1
P20
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30 0
P3 1
P32
MTRCL KOWLOON STATION DEVELOPMENT PACKAGE 7, KIL 11080 Design & Construction of Friction Foundation Diaphragm Wall, Shaft Grouted Barrettes
Shaft Grouting Cement grout is injected at high pressure in order to enhance the friction at the interface concrete/soil.
HEADQUARTERS
REGIONAL OFFICES
Asia & Pacific VSL-Intrafor Asia, Hong Kong Phone: +852 2590 2288 Fax: +852 2590 0290
Central East Europe, Middle East, France & French Speaking Countries, Africa VSL France France Phone: +33 1 39 44 85 85 Fax: +33 1 39 44 85 86
Iberian Peninsula, South Africa and Latin America CTT Stronghold Spain Phone: +34 93 289 23 30 Fax: +34 93 289 23 31
www.vsl-intl.com