E-Street Lighting

By Hrushikesh A. Dushi MT11IND010

Project Overview
The intelligent street lighting project was carried out by 13 partners of 12 European countries during the period of January 2006 to July 2008. The phrase Intelligent street lighting includes a total system with dimmable luminaires, advanced lighting control solutions, communication systems and administrative tools.

In most cases Intelligent street lighting in its practical design is


identical to Adaptive lighting.

Streets or roads equipped with such a solution will dynamically adapt the street lighting performance according to the actual needs for the given period/time of the road. The project have identified an annual saving potential of 63.7% of annual consumption. IEE provided 250 million which was the 50% of the total cost.

General Layout

Work Packages
1. Report on administrative matters.

2.
3. 4.

Market Assessment and Review of energy savings.


Evaluation report on Market penetration and procurement activities. Report on Provoke a faster development of legislation, standards and

guidelines.
5. 6. Report on Administrative tools and data handling, customers need. Comprehensive report on financial instruments.

7.
8.

Report on dissemination and replication of success.


Report on specific notes/discussions/conferences etc.

Comprehensive Report on Financial Instruments


Guideline for saving contracting in Street Lighting

Calculation model for evaluation of economic efficiency

Pilot cases Financial instruments.

Guideline for saving contracting in Street Lighting


A general framework should be established for the following general aspects:
a. b. c. d. e. Duration of contract Quality criteria Standards Investment costs grants Financing

Tendering Procedure
Invitation to submit Tenders/call for Tenders.

Contents of the Tender Documents.


a. b. Subject matter and targets of the project Tips for preparation of documents

c.
d. e. f. g. h.

Determination of remuneration
General framework A draft of the saving guarantee contract Time planning Assessment criteria Street light installation-specific data

Validation Phase
Identification of the Best offer
a. Monetary assessment/Evaluation

A method to compare the different guaranteed yearly energy cost reduction is the
net present value method:

K- Net Present Value i- Interest rate tv- Contract duration Et- Saving in the year t b. Non-Monetary Evaluation: Cost benefit analysis

Optimisation of offers / Conclusion of the contract Final Result

Savings Guarantee Contract


The analysis, planning and implementation of saving measures, including a

permanent guarantee of the saving effect, are the central services


contained in the Saving Guarantee Contract like the following figure:

Calculation Model for Evaluation of Economic Efficiency


The majority of softwares are strictly divided into o Data input o Calculations and

o Data output

Technical planning software for street-lightingreconstruction. Static calculation for first results about economic efficiency. Financing of reconstruction by annuity-credit.

Measuring Unit

Power Electricity
Price for power electricity is defined by the trading companies and it is not controlled by any public authorities, Includes fixed monthly fee for the point of supply and

payment for consumed electricity for chosen rate:


Power electricity
fixed price per the point of supply per month price for 1MWh (High rate) price for 1 MWh (Low rate)

K (Czech crown)
30 844 -

1,05 29,61 -

Pilot Case Germany