Presented by PT Transportasi Gas Indonesia Regional Office-2 Belilas Compressor Station Pekanbaru, 21 November 2012
Presentation outline :
Technical challenges
Technical Challenges :
2. Product Obsolete Gas & Detection System, Power Supply GTGC PLC product
Technical Challenges :
Often shutdown and re-start @11:30 am since Dec 2009 Feb 2010 1 of 10 units Battery 110VDC for Control Console GTGC A drop voltage
EGF
Batteries
Rectification:
TCS Panel
DC PUMP
Checking all batteries and perform battery replacement. TGI Operation Technical Sharing Forum 2012
Technical Challenges :
Cause :
Spike at GP over speed probe sensor due grounding shield for GP Probe cable connection failure
Rectification:
Ensure grounding shield connection system are correct base on Electrical Schematic
Technical Challenges :
GD PANEL
1. Gas & Detection System, Product Obsolete Cause : Year of 2009 Siemens Cerberus GD System Power Supply 24VDC Fault Power Supply Parts PRODUCT OBSOLETE
PREVIOUS
CURRENT
Source:
Technical Challenges :
Rectification: Temporary Modified Power Supply 24VDC Source from UPS 24VDC
Technical Challenges :
2. GTGC Control Net Product Obsolete Downtime : 583 Hours since May 1, 2009 to may 25, 2009 Cause : Module Flex I/O ZF 2080 Node 8 Error
Technical Challenges :
Rectification: Step 1. Replace Module Flex I/O ZF 2080 Node 8 (Last Spare Part)
Rockwell Automation Information :
Control Net 1.25 Protocol, PLC5 40C, Since 2003 PRODUCT OBSOLETE
http://www.ab.com/silver/communications/controlnet125.html:
The Silver Date for these ControlNet 1.25 products is December 31, 2003. As with any discontinued Rockwell Automation product, and depending on component availability, it is our goal to provide repair services and technical support for these products for at least seven years. If a migration path is required, Rockwell Automation offers upgrades and other new ControlNet 1.5 products with current functionality.
Technical Challenges :
Solar Turbines Product Information Letter (PIL 180) Turbotronic 3MX, since 2003 PRODUCT OBSOLETE
Technical Challenges :
Rectification: Step 2.
UPGRADING SYSTEM
CONTROL NET 1.25 PROTOCOL, PLC5 40C
COMPRESSOR INTEGRITY
Manage Spare Parts (Inventory) Predictive Maintenance Root Cause Failure Analysis Product Update and Upgrade