Professional Documents
Culture Documents
Economic Sector
Balance of Payments Trade deficit as part of GDP Current account deficit as part of GDP Growth of service industry Industrial growth Inflation Growth in basic goods & non durables Fall in rupee against dollar - 32.8 billion 8%
Governmental sector
Central Subsidies Net Tax to Centre Total expenditure Plan expenditure Bank rate Customs basic duty Additional duty - Greater than 2% of GDP - 7,71,071 crore - 14,90,925 crore - 5,21,025 crore - 9% - 7.5 % - 12 %
- 3% 9.40% 4-5%
- 6.5- 7% 6.10%
- 12.40%
Technological sector
New Technologies EPCG scheme at zero duty Minimum 15% value addition on imported inputs.
Economic Sector
Population Trend
1.4E+09 1.2E+09 1E+09 800000000 600000000 400000000 200000000 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 2011 Sum of Population of India Sum of Total Female Population 2012 Sum of Total Male Population 0-14 years 15-64 years Sum of 2011 Sum of 2012 above 65 years
Age shift
Consumption
17% 6% 7.50% 6% 5% 7.50% 4% 14%
housing food
Facts
Inequality measure - 8.60% Gini Index - 36.8 Literacy rate in 2011 - 74.04% Women in unorganized sector - 38%
2%
entertainment education 23% autos health care education Hpc products mobile phones miscellaneous stuff
Energy Sources
Total installed capacity of energy
1,199.75
56,991.23 86,275.40
Sodium battery manufacturers like NGK Insulators (NGKIF.PK) and General Electric (GE) Super capacitor manufacturers like Maxwell Technologies (MXWL)
Lead-acid battery manufacturers like Enersys (ENS), Exide (XIDE) and C&D Technologies (CHP)
Lead-carbon battery manufacturers like Furukawa Battery (FBB.F), Axion Power (AXPW.OB) Flow battery manufacturers like ZBB Energy (ZBB)
Ease of manufacture
Readily available raw materials like quartz crystal, zinc oxide and lead oxide is used
Use of Latest technology which is miles ahead of the available current technology Could be developed to serve other power choices in the longer run Could be easily adopted in cell phones as viable replacement for existing batteries
Assumptions
Particulars
Land and Building Plant and Machinery Miscellaneous fixed assets Preliminary capital expenses Preoperative expenses
Rupees in Crores
1.5 1 .5 1000 800
Particulars 1st year (365 days) Installed capacity (quantity per annum) No of working days No. of shifts Estimated production per day(qty) Estimated Annual production(qty) Sales (qty) Value of Sales(in Rs Crore) 36500000 7 2 9000 32850000 30000000 1500
Year-wise 2nd year (365 days) 36500000 7 2 9000 32850000 30000000 1500 3rd year 4th year (365 days) (365 days) 36500000 7 2 9000 32850000 30000000 1500 36500000 7 2 9000 32850000 30000000 1500