Group(3) members; Moe Thu(0346999) Hnin Thiri(1151936) Mya Ye lai Khaing (1153181) Kong Yuan(1151949)
Contents
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.
Project Background Project Objective Project Assurance Project Stakeholders Risk Management Project Lifecycle Project Proposed Design Project Planning Project Cost Budget Quality Management Communication Management Project Documentation Project Closure
1. PROJECT BACKGROUND
Organization :HALCYON Offshore is a multi-disciplinary engineering and
construction contractor for the offshore oil & gas industry. The company is certified ISO 9001:2008
Product :Capstans can be manufactured with a pull of 0.5 to 15 tonnes and can be
required.
Drive can be manual, electric, hydraulic and pneumatic system. The Electric Vertical Capstan consists of a vertical cast steel warping head coupled
directly to the under-mounted drive unit. The gear motor is mounted inside the bell housing with mounting flange. An electric motor drives the capstan.
2. PROJECT OBJECTIVES
Manufacturing the capstan and installation on board vessel Production of a good quality structure, workmanship and Installation. Build a Capstan which shall be durable and encompass enviromentally friendly
commissioning expertise to deliver complex, integrated Projects, sophisticated Products, engineered Services and Solutions.
3.PROJECT ASSURANCE
Financial
Ensures that the need of the proposed product is built. Guarantees accountability to stakeholders who have financial interest in the project
Quality
Quality standards and Operation are based in order to create guidelines for quality
standard (ISO 9001-2008 Quality Management System). Quality Class & Grade are approved by Professional Engineering (PM) Society (High Grade Materials & Treatments) .
Risk
Risk needs to be understood for decision making. The success of the project lies in being able to foresee and manage risk.
Technical
Overall accountability and coordination. Performs operations in a specialized area to established technical specifications within
Legal
Health and safety regulations on the Machine Shop and Shipyard & help to reduce
accidents and serious injuries. Contributes towards reducing the incidence of unnecessary disputes among stakeholders as each individual is protected by laws.
4.PROJECT STAKEHOLDERS
Internal Stakeholders
External Stakeholders
Suppliers Specialist Consultants Third Party Fabrication Group
Low
Vice President (VP) Project Manager (PM) Project Coordinator (PC) Project Team Sale & Marketing Production team Purchaser Accounting officer QA/QC Engineer
Stakeholders Analysis
(Power/Interest)
-Production Team
- VP -Project Coordinator
Power
High
-Purchasing -Supplier -Other Departmental - Consultants Staff (for Data & Ideas - Third-party Collecting)
Low Interest
High
Assist VP on section management Product R&D Product costing preparation Product design & concept preparation Project schedule and cost control Check and approve calculation, BOM and production drawings System design & integration Commissioning procedure Site support when needed Any other tasks assigned by the management
cost, schedule and quality requirements. Identify resources needed for project. Identify residents of the Halfway House training needs Aid in the management of time, cost and quality. Identify unanticipated risk events Track the project implementation and submit status reports to the project manager. Maintain project and structural building quality requirements Participate in lessons learned sessions. Identify ways to improve project processes
(3)External Stakeholders
Shall indemnify the client for all incidents that may occur to the specialist contractors
employees during onboard installing. Shall be responsible to complete specialist their works according to the work procedures. Shall complete the works with the highest quality of workmanship and diligence. On time Delivery with Reasonable Price Perfect Information flow Perfect Supports & Services
5.Risk Management
1.Project failure 2.Sponsors pulling out 3.Change of scope 4.Extension of Production and Installation period 5.Quality level of deliverables not satisfactory 6.Resources not coming on time 7.Shortage of labor and poor quality of resources 8.Targets And dates not achieved 9.Escalation of the estimated expenditure
No 1. Project failure
Project Cancellation of Project Proper communication, project planning and management should be done properly Have another potential sponsor that can contribute should anything happens Allow for change of scope Allow float in the deliverables so that if there are any delays the available time maybe used Constantly inspect the contractors work
2.
Identified sponsors Moderate might not want to contribute Lack of funds Rain and strike High High
Cancellation of the project or delay of the start date Poor quality and late completion Increase cost and sponsors might pull out
3. 4.
5.
Moderate
6.
7.
8. 9.
Late delivery of resources Supplier having lots of clients to deal with Shortage of labor and Labour not well poor quality of resources trained and quality suppliers not found in the area Targets And dates not Constraints in the achieved project Escalation of the Increase in prices
Moderate
Project not completed or great amount of defects in the future Slows down the work pace Conflict in the whole project and result in delay
Increase cost and construction period Lack of funds to
Project Manager
Contractor
Moderate
Contractor
Moderate Moderate
6. Project Lifecycle
100 90 80 70
Level of Activity
60 50 40 30 20 10 0 1wk Jan 2wk Jan 3wk Jan 4wk Jan 1wk feb 2wk feb 3wk feb 4wk feb 1wk Mar 2wk Mar 3wk Mar 4wk Mar
Specification
TYPE PULL CONTROL CAPSTAN SIZE POWER VERTICAL MOUNT ON VESSEL 20T x 0~10 M/MIN ELECTRICAL CONTROL STAND 510 ~45KW
8.Project Planning
Estimate xpenses
S$ S$ S$ S$ S$ S$ S$ 100 2000 12000 5000 500 2000 1000
Fabrication
Order Receiving Assembly Testing Documentation Painting Packing Shipping Onsite Installation
Estimate Cost
5% 10%
S$
S$ S$ S$ S$
500
300 300 1000 1500
85%
Onsite Testing
Total Project Estimate Cost Contingency Reserves (10%) Management Reserves (5%) Total Cost Budget
S$
S$ S$ S$ S$
500
26000 2600 1300 29900
Quality Policy
Ensure that all legal procedures necessary to make the project a success are followed.. Build the Product in a safe manner either Internal or External. Quality Product & Excellent Service Reliable Design On-time Completion & Delivery
Continual Improvement
Product Realization
Product Service
Output
Customer (Satisfaction)
Communication Type
Internal Communication (All, Except QMS Related)
Responsible Department
HR Department
QA Department
Sales & Marketing Sales & Marketing Projects Department After sales Department Purchasing Department Production Department QA Department Engineering Department QA Department
QA Department
Specifically, project documentation focuses on guiding the project team and readers (Customers) to:
Identify key deliverables and dates. Document the technical parameters and technologies to be used. Address the manner in which items will be built or deployed. Assess items such as quality, scope, resources, risk, training, and cost. Document any back-out or contingencies that could occur. Communicate progress and update stakeholders.
1. 2. 3. 4. 5.
Project Documentation such as Project proposal, Project Plan etc. Team Documentation such as Project Status Report, Meeting Minutes etc. Test Documentation such as Test Procedure , Test Report etc. System Documentation such as Database Documentation ,API Documentation etc. User Documentation Such as User Manual , Troubleshooting Guide etc.
13.Project Closure
The following tools can be used to order the closing process: Acceptance Test Procedures (ATP); Implementation Strategies; Project Documentation; PostImplementation Audit; Final Project Report. Closing a project involves the following 6 steps: Getting Client Acceptance of Deliverables Ensuring that all Deliverables are Installed Ensuring that the Documentation is in Place Getting client Sign-Off on the Final Report Conducting the Post-Implementation Audit Celebrate Success