J.N.Jha*, K.S.Gill* & A.K.Chaudhary** *Department of Civil Engineering, Guru Nanak Dev Engineering College, Ludhiana ** Department of Civil Engineering, NIT, Jamshedpur
Introduction
Construction
activities increased manifold (development of economic activities) Different types of complex structures are coming up (to meet the growing demand) Attempt being made to make soil suitable to project and not the project to soil.
Geotechnical
Engineervery important role to play in this challenging task. Geotechnical Engineering Practice-At par with the best in the world. Range of Geotechnical practice vary widely in India.
Field
investigation-Most primitive equipment are in use Laboratory testing-Practice vary widely with little standardization and accreditation.
Quality of Investigation
India
Generally Poor quality of the Equipment Calyx Drilling Technique SPT Equipment unchanged over the years (unreliable) Conventional Static Cone Penetration Equipment Very recently few companies have electric cone
World Standard
Highly sophisticated and mechanized equipment Continuous core sampling (in soils as well) SPT Equipment with Blow Energy Directly on top of the sampler Static Cone Test with Electric Cone
difference between actual soil profiles and available soil profiles (at the time of design as part of tender specifications) can be minimized if standard practices are followed during the soil investigation
Variation
Unfortunately this is not the case quite often Who is responsible? Responsibility squarely rests on Geotechnical community of the country and is a major failure on our part.
for a project (information supplied) Subsoil profile and soil characteristics is of general information only
Contractor if desired should satisfy the correctness of information before submitting his offer To safeguard the owner to avoid any dispute
interval between issue of tender document and submission of technical bid is very short Soil investigation is expensive Impossible to carry out soil investigation Bidder accepts the stipulation given in tender
Case study
Road
5 span of 10.7 m with certain embankment on either side As per tender SPT value 12 to 16 for top two layer extending up to 7 m.
Recommend allowable bearing pressure=150 kN/m2 at depth 2 m below GL for Pier foundation. Accordingly Piers were constructed on shallow foundation 4 Pier constructed and 5th was under construction approach earth embankment settled by 2 m and corresponding heaving up of soil 1.5 m
9m
.
BRIDGE
EM BANKM ENT ABUT M ENT PIER RAIL LINE SOIL HEAVE G.L. SOF T CLAY ROT AT IONAL F AILURE - 6m SAND
10.7 m
Confirming
BH-I 0
SPT (N)
BH-I 0
12 14
SAND
0.0
2 C=40KN/m
16
SILT
0.0
2 C=24KN/m
12 CLAY 29
6 0.0
2 C=31KN/m 2 C=40KN/m
0.3 11
10
15
Rehabilitation Measure
Piles
installed around shallow foundation and integrated with foundation Delay in completion of project, additional cost & dispute
S P T ( N ) V a lu e s
0 8 16 24 32
B H -3
B H -F
4 D e p t h (m ) 8 12 16 20 24 28 32
C LA Y SAND
Reasons
Insufficient and inaccurate information at the time of design variation in strata Changes in project requirement during execution.
Achieving
this is easily said than done-needs engineering judgement Engineering Judgement comes from experience. Experience comes from bad engineering judgement
Case study
Fertilizer
plant in Gangetic beltpossibility of optimum design Phase-I Soil strata (Site) N<10- For a depth upto 10 m N-10-20-For a depth upto 10-20 m >20 For a depth upto 10-20m
Type
of Soil Silty sand with high water table Threat of liquefaction during earthquake
RCC cast in situ piles (diameter 400 mm) with pile capacity Axial vertical load 50 Tonnes Uplift - 5 Tonnes Horizontal capacity=2.5 Tonnes
To
overcome the problem of liquefaction during earthquake Provide sand compaction pile 2 to 3 rows around RCC piles
Total requirement
As per design No. of RCC piles 16000 No. of sand compaction piles 32,000 Time required for installation of RCC piles and sand compaction piles= 6 months more than what was originally planned
design Spacing of compaction pile 3D and 5D with triangular pattern Spacing 3D (desired improvement in N-values) Spacing-5D (desired improvement in N values not adequates)
Additional Recommendation
Spacing
of sand compaction pile-4D Result-Adequate to obtain required densification (N-values) No. of piles (now required)=16000 instead of 32000
Pile
capacity (Revised) Vertical downward-65 tonnes instead of 50 tonnes original Uplift capacity=25 tonnes instead of 5 tonnes original Lateral capacity-3.5 tonnes as against original 2.5 tonnes
Requirement
of no. of RCC piles (based on revision)=9400 piles Reduction in no. of piles =40% Observation: Performance of the foundation-fully adequate and satisfactory.
Trial Test
Test
plot 10 m x 10 m Vibro stone column 11 m (length), c/c spacing 15 m, 2.15m & 1.8 m (Triangular pattern
Silty Clay Silty Clay Silty Clay Silty Clay Silty Clay Silty Clay
2-8m
2-10 m
DESCRPTIO N BRO WN CLAY SILT 2.50 BRO WN SILT FINE SAND G REY FINE SAND 5.25
SO IL DEPTH PRO F. (m) 1.0 2.0 3.0 4.0 5.0 6.0 7.0
PRE CO MPACTIO N
X
PO ST CO MPACTIO N
PO ST CO MPACTIO N G REY SILTY MEDIUM TO FINE SAND 9.55 8.0 9.0 10.0 11.0 PRE CO MPACTIO N
Vibro
Stone Column of 960mm with spacing 2D, 2.25D and 2.5D where adopted depending on loading intensity Substantial saving in time and cost Subsequently observation during the operation of Phase-II confirmed a satisfactory behaviour of foundation
Concluding remarks
Commitment
to excellence from Geotechnical Engineers Positive attitude to continuously learn and to accept change for better Partnership and team work among all concerned i.e owner, consultant and contractor
Thank you..