Professional Documents
Culture Documents
All the ventilation and lighting features shall be designed to prevent side rain from being blown into the building.
The concrete floor shall be designed to allow for sufficient loading capacity to withstand the weight of the machineries and storage materials.
RESIDUAL IMPACT
Key Construction phase impacts The key operation phase impacts
Construction disturbance Air pollution dust Soil erosion and water runoff Workers camp solid wastes and sewage Noise from construction machineries
Air pollution from gaseous and dust emission including fugitive dust emissions Spillage of hydraulic, lubricating and fuel oil diesel Risk of natural gas use Odour from contact of water with aluminium residue Operator safety