You are on page 1of 17

Enterprise Wide Information System

BISLERI INTERNATIONAL PVT.LTD

Bottle Sizes
1 ltr

Preform Sizes
21gms

500 ml 250 ml
1.5 ltr 2 ltr 5 ltr 20 ltr

17gms 15gms
32 gms 34 gms 75 gms 710 gms

3. Water Treatment Plant: Over here the Raw water from the bore wells is treated in several stages before it is filled thus making it very pure for human use. 4. Blowing Department: Over here the preforms are blown into bottles. This department has various manual and fully automatic stretch blow moulding machines. 5. Water Testing Laboratory: The water-testing lab ensures that the water safety standards are maintained as per the BIS and EU norms.

Market
1.Competition: till 1992 bisleri enjoyed a complete monopoly Recent competitors are pepsi and coca-cola 2.Customer desire: bisleri has become a synonym for packaged water. 3.More options: - Bisleri was the first company in India to increase its products in packaged drinking water ranging from 500ml to 20 litres.

Primary resources: Material: The raw water is obtained from bore wells. The bottles are made from polymers such as HDPE, LLDPE and PET. Personnel: Bisleri requires mostly skilled and semi skilled labourers. The skilled labourers include production and plastic engineers. Capital assets: - Bisleri has got 14 injection moulding machines, 2 automatic blow moulding machines and 4 semi automatic blow moulding machines.

Processing of bottled water:-

Labellin g Capping Filling

Quality check

Control subsystem The motto of Bisleri is play safe The quality of every single raw material that goes into the products are minutely inspected in order to ensure optimum quality standards. The caps of all the bottles are tamper proof so when the consumer buys a Bisleri product he ensures that the product is unhampered. The production process of Bisleri is such that a human hand never touches a Bisleri product. There is 24 hours quality checking so that no defective product reaches the consumer.

1. 1. 2.

Operations management and planning Product materials Operations management execution Parts Hours

Accountability

EFFECTS OF INTEGRATION OF ERP AND SCM IN BISLERI Achieve 98% inventory record accuracy & eliminate the physical inventory . Achieve 95-99% schedule attainment 95-99% customer service. Reduce inventory 25-40%. Improve productivity 10-20%. Never run out of stock. Achieve 98% routing accuracy. Achieve 99% bill of material accuracy.

You might also like