Overview of the Existing Under Frequency Load Shedding Scheme

Stage I II III

Criteria
48.75 Hz + 100 ms 48.50 Hz + 500 ms 48.25 Hz + 1s 48.25 Hz + 500 ms OR 49 Hz AND df/dt > -0.85 Hz/s + 100 ms

Load Shed 5.0 % 5.0 % 7.0 % 3.0 %

IV

48.00 Hz + 1.5 s 48.00 Hz + 500 ms OR 49 Hz AND df/dt > -0.85 Hz/s+ 100 ms 47.5 Hz instantaneous 47.5 Hz instantaneous OR 49 Hz AND df/dt > -0.85 Hz/s + 100 ms
49 Hz AND df/dt > -0.85 s/Hz + 100 ms

7.0 % 3.0 % 6.0 % 4.0 %


10.0 % + (3%+3%+4%) embedded with stage III, IV and V

VI

Present status of the UFLS scheme


Under frequency relays on following feeders yet to be installed
11 kV feeders of Sub E stage IV 11 kV feeders of Sub A stage IV 11 kV feeders of Sub I stage V 11 kV feeders of Sub F stage IV Habarana Valachchane line from Habarana end stage VI

Present status of the UFLS scheme ctd


Stage I II III Expected amount 5.0 % 5.0 % 7.0 % 3.0 % 7.0 % 3.0 % 6.0 % 4.0 %
10.0 % + (3%+3%+4%) embedded with stage III, IV and V

Actual amount 5.3 % 5.2 % 5.16 % 2.65 % 6.6 % 2.4 % 4.5 % 3.6 %
9.7 % + (2.65%+2.4%+3.6%) embedded with stage III, IV and V

IV

VI

System Frequency Response


PCPP tripped rejecting 300 MW on 29.01.13 ppt
50.5 50.25 50 49.75 49.5 49.25 49 48.75 48.5 48.25 48 47.75 0 1.25 2.5 3.75 5 6.25 7.5 8.75 10 11.25 12.5 13.75 15 16.25 17.5 18.75 20 21.25 22.5 23.75 25 26.25 27.5 28.75 30

df/dt = 0.678 Hz/s Min fre = 47.945 Hz

df/dt = 0.60 Hz/s Min fre = 47.967 Hz

Free Governor Operation


Only Victoria and Kothmale machines operated

Frequency Response without Kothmale m/c and Victoria one m/c

With Free Governor

Without Free Governor

Critical Generator Under Frequency Trip Settings


Power Station O/Lax KCCP ST Barge Under Frequency Trip Setting 48 Hz with 8 sec delay 48 Hz with 3 sec delay 48 Hz with 10 sec delay

Initial Frequency Response


It depends on the characteristics of the synchronous loads and synchronous generators.

df/dt t=0+= P/2Hsystem


Hsystem includes the inertia contribution from generators and synchronous loads. (MW-s/MVA)

System Inertia from committed generators

Hsystem

i 1

Hi MVAi
i 1

MVAi

H 1xMVA1 H 2 xMVA2 ..... HnxMVAn MVA1 MVA2 ....... MVAn

Operation of Under frequency


df/dt setting was not operated initial df/dt = 0.6 Hz/s Stage I 62 MW (4.35 %) 7 MW of load not tripped Stage II 40 MW (2.8 %) 25 MW of load not tripped Stage III 92 MW (6.4 %) 20 MW of load not tripped Stage IV 20 MW (1.4 %) lack of load shedding in stage IV since frequency remains appro: 1.6 seconds below 48 Hz

Total load shedding 214 MW

Frequency response if all feeders operate at stage I,II and III

Frequency response with reduced time setting in stage IV


Reduce time delay to 1 sec from 1.5 sec
More load shedding In stage IV 72 MW