Cryogenic
Gas
to liquid at sub (minus) temperature LIN/LOX/LAR Best e.g.. Jet fuel Heat transfer (conduction/convection/radiation) Methodology - vaccum insulation/thermal insulation
Cryogenic Vessels
VIST-
Vaccum insulated storage tank VITT- Vaccum insulated transported tank VIET- Vaccum insulated evaporated tank
Life
Vessel orientation
View
from top Deg in clock wise direction view from top Deg in anti clock wise direction view from bottom If looking from Top view top dish is shape as a convex and bottom dish as a concave.
Vessel orientation
Vaccum filter
90 deg
SS cleaning
Initially apply Bondite Liquid and remove the yellow marks/stains by using SS wire brush After that Okite Liquid to be apply for protection Next Bondite Liquid to be apply once again, froth & Foam develops followed by scrubbing the stains using wire brush and wait for 1520minutes. Finally wash the Stainless steel plate by Okite Liquid
SS cleaning
dish end with outer skirt fitup and welding can be done before patch plate assemble with inner vessel. Jacket dish end Assy fitup with inner vessel.
Patch plate
Patch
plate fitup with jacket bottom dish end and the center line of the patch plate should be match with the bottom dish end center line i.e. 180 deg. Temporary attachment can be done between patch plate with jacket bottom dish end (in the form of cantilever ).
Pipe connection to be made with help of adaptor as shown in fig (socket type joint) If we want butt joint, we have to take 100% RT We should maintain 1.5mm 3mm gab between pipe and adaptor for thermal expansion Pipe with adaptor and ferrules Mock up to done before fit up& welding Assemble the pipe from both side of top dish end as well as patch plate. adjust the length of pipe and marking/cutting to required size in shell length wise and also marking/cutting the excess length of pipe from top dish end side.
complete the mock up clean the inside of both ferrules and pipe by DCEdry chloride ethylene. Welding sequence of the pipe in fig Gap between Pipelines and Inner vessel should be 1 to 1.1/2
Hydro test
Vessel should be in Horizontal Position Inlet on flange connection pipe Slightly inclined the vessels during hydrotest For water Drain, all ferrrules should be in open condition Pressure gauge on N' at 180 degree and Drain on N at 0 Mild steel ferrule for Dummy the threaded ferrules
Hydro test
During hydrotest, vessel upclined During Drain, vessel Declined
Hydro test
Hydro test
N&N closing
During hydro test, plug N & N' by tapping Taffelon tape After hydrotest, remove taffelon tape and weld.
Pneumatic test
Pnuematic test to be done before N & N' welding Two Pressure Gauges
Jacket assembly
Jacket assembly
Jacket assembly
Jacket assembly
Jacket assembly
Jacket assembly