You are on page 1of 20

RIG PROCESSES

Drilling, Coring, Directional Drilling & Survey. Tripping, Wash & Ream, Fishing. E- Logging. Casing & Cementing. Perforating &Testing. Acidizing & Fracturing.

Drilling & Coring


Normal Drilling. Coring; Convetional Coring: Core head core barrel

Tripping
((Pulling out or running the string in hole )) Normal tripping. Tight Hole. Wash and Ream. Normal Drag. Overpull. Twist off. Stuck Fishing

II. Stuck pipe

Drilling string cannot be raised, lowered or rotate.

Mechanisms of stuck pipe


Differential Stuck. Wellbore Geometry. Hole packing off.

A. Differential Stuck
Sticking of pipe against a permeable formation as the result of the pressure of the mud in the hole exceeding the bore fluid pressure.

Differential sticking
Stuck breadth = 4 Stuck length = 25 Fm pressure = 4000 psi H pressure = 5000 psi D. F=4*25*12*(5000-4000)

1,200,000lbs

Key Seat
Causes: Abrupt change in angle or direction in soft formations. High string tension and pipe rotation wears a slot into the formation. While POOH the drill collars jam into the slot.

C. Packing Off & Bridging


Formation cuttings cavings or medium to large pieces of hard formation, cement or junk settle around the drill string and pack off/bridging the annulus. Settled cuttings Shale instability + Unconsolidated formations Fractured formations Cement related. Junk.

Settled Cutting Straight Hole


Causes: Low annular velocity and/or poor mud properties. When circulation is stopped, the cuttings fall back down the hole and pack off the drill string.

Settled Cutting Deviated Hole


Causes: Drill cuttings settle on the low side forming a cutting bed. The cutting bed builds and slide down hole. While POOH the cuttings is dragged upward by the BHA

ELECTRIC LOGGING
Logging While Drilling (MWD). Post Drilling E- Logging. Gamma Resistivity Neutron Density. Sonic.

Resistivity
1000
1000

Sonic
1500 re s pons e in cas ing

1500

2000

2000

Cycle Sk ipping

TVD (m)

2500 Top Ove rpre s s ure 3000

TVD (m)

2500

Top of Ove rpre s s ure

3000

NCT 3500
NCT 3500

0.1

10
100

RILD (ohm.m)

Sonic (usec/m)

1000

CASING
Casing is steel pipe placed in an oil or gas well at the end of every drilled phase, and then cemented in place prior to striating drilling the lower smaller hole section.

Function Of Casing
Printing hole from caving or collapsing Privinting loss of drilling fluids into weak formations. Isolate troublesome formations. Prevent communication between formations. Provides means of extracting hydrocarbons Provides a means of support for the wellhead equipment.

Casing Accessories
Centralizers: attached to the casing and since they have a bowed spring arrangement keep the casing centred in the hole after it is lowered in. Centralised casing can make for a better cement job later.

Scratchers

Float collars

Cementing

Well Completion
Completing the well & Setting Production Casing. Perforating production casing. Drill Stem Test (DST). Acidizing. Fracturing. Installing the Christmas Tree.

THANK YOU

You might also like