INTRODUCTION

Located at the left bank of Chambal River at Up Stream of Kota Barrage. The large expanse of water reached by the barrage provides an efficient direct circulation of cooling system for the power station. It comes under RRVUNL(Rajasthan Rajya Vidhyut Utpadan Nigam Ltd).

Overview Of Electricity Generation

Information about Different Stages of KSTPS


Stage
I Unit 1 2 II 3 4 III IV V 5 6 7 Capacity(MW) 110 110 210 210 210 195 195 Syncronizatio n date 17/01/1983 13/07/1983 25/09/1988 01/05/1989 2/03/1994 31/07/2003 30/05/2009 Cost(in crore) 143 143 480 480 480 635 880

PARTS OF THERMAL POWER PLANT


Coal handling plant
Ash Handling Plant

Boilers

Steam Turbines

Transformers

Control room
7

Coal Handling plant


There are different part of coal handling plant:(i) Wagon unloading system (ii ) Crushing System (iii) Conveying system

ASH HANDLING PLANT

(i) Fuel & Ash plant

(ii) Air & Gas plant (iii) Ash disposal

10

BOILERS

Converts Water To Steam Manufactured By BHEL Coal & Oil fired Tangentially Firing Superheated Steam

11

BOILER OF UNIT-VII

12

TRANSFORMERS

These are equipments based on electromagnetic induction, alternating current and voltage without affecting frequency.

It has mainly two windings i.e. primary winding and secondary windings. It has mainly conservator, breather, cooling fans.

13

Turbine

Converts KE To Mechanical Energy

Internal structure of turbine

14

SWITCHYARD
Two 220 KV bus bars have
been provided in switch yard and are inter-connected through a bus coupler. It consists of several parts: (i) Bus bars (ii) Circuit breakers (iii) Current transformers(C.T) (iv) Potential transformers(P.T.) (v) Isolators (vi) Lightning Arresters
15

Control Room

D.C.I.M.S system used Fan Control desk Fuel Control Desk Steam and Water Control Desk Turbine Control Desk Generator Control Panel Computurized Panel

16

CONTROL ROOM OF UNITVII

17

CONCLUSION

Kota super thermal power station generates 1240 MW power

It also provides an opportunity to learn how the technology is

used at proper place and time can have a lot of labor e.g.
Wagon Tripler .

However training has proved to be quite fruitful. It has

allowed an opportunity to get an exposure of the practical


implementation to theoretical fundamentals.