CONTENTS
Manufacturing Process Of Cement
(a) Mines (b) Blasting (c) Transportation (d) Crushing and transportation (e) Raw Mill (f) Raw Mill Silo (g) Preheater (h) Rotary Kiln (i) Cooler (j) Clinker Silo (j) Gypsum Mixing Tank (j) Cement Mill (k) Cement Mill Silo (l) Packing Plant
dumper loader
Quarry face
1. BLASTING
2. TRANSPORT
crushing conveyor
1. RAW GRINDING
preheating
kiln cooling
clinker
2. BURNING
Gypsum and the secondary additives are added to the clinker. clinker storage
Finish grinding
1. GRINDING
1. GRINDING
bags
silos
dispatch
1.MINES
Mines
2.BLASTING
loader
Mines
2. BLASTING :- The raw materials that are used to manufacture cement (mainly limestone and clay) are blasted and extracted from the quarry or mines.
Ball mills is used for grinding the raw material (lime stone) in to small particles of 90 micron size.
Ball mills consist of three chambers. (a) Dry Chamber- Moisture is removed from the raw material by passing
hot air.
(b)1st Chamber- Consist of balls size varying from (60mm to 90mm). (c)2nd Chamber- Consist of balls size varying from (25mm to 50mm). Ball mills consist of two diaphragm. (a) Intermediate diaphragm (b) Discharge diaphragm.
balls stay on the mill wall due to centrifugal force NO GRINDING POSSIBLE!
42.3 Vcrit Di
Vmax: maximum speed circa 75% of the critical speed
Vmax
Di
31.7 Di
= diameter inside liners
INTERMEDIATE DIAPHRAGM
diaphragm segment
DISCHARGEDIAPHRAGM
6.SILO:- Raw mill silo is a cylindrical building used for storing the grinded raw material in huge amount,before feeding it into the peheater.
In K# 4 unit of the dalla cement factory two silo is used,having height about 75m.
Blending Capacity- 1500tn Storing Capacity- 3000tn Each Silo having two parts 1-Blending (Top),2-Storage(bottom)
SILO
7.PREHEATER
preheater
PREHEATER:
Preheater is used for preheating and calcination of the ground raw material,before feeding it into the kiln. In K#4 unit four stage preheater are have been installed. Preheater is also used to increase the thermal efficiency of the hot gases and calcination of the lime stonewhich is fed in powder form. No. of preheater are inversely proportional to the length of the kiln. Capacity of the plant depend upon the no. of pre-heaters stage and size
8.ROTARY KILN
kiln
clinker
ROTARY KILN
9.COOLER
cooler clinker
COOLER
10.CLINKER SILO
clinker storage conveyor
CLINKER SILO:-
Silo is the storage cylindrical tank of about 60m height in which the cliker is stored and transported by the convyer belt to the silo.
After carrying out the clinker from the silo through the air slide gypsum and secondary additives is added to the clinker. Gypsum plays an important role in the setting time of the cement,it decreases the setting time of the cement and becomes easier to work with the cement.
12.CEMENT MILL
conveyor Cement mill
Ball mills is used for grinding the mixture of cliker,gypsum and other additives.
Ball mills consist of three chambers. (a)1st Chamber- Consist of balls size varying from (90mm to 60mm). (b)2nd Chamber- Consist of balls size varying from (50mm to 40mm). (c)3rd Chamber- consist of balls size varying from(30mm to 20mm).
Ball mills consist of two diaphragm. (a) Intermediate diaphragm no.1 (b) Intermediate diaphragm no.2 (c) Discharge diaphragm.
CEMENT MILL
13.CEMENT SILO
silo s
14.PACKING PLANT
Now at the last cement from the silo is carried out to the packing plant through the air slide and is packed in the polyster bags and loaded to the trucks using packing machine, belt conveyor , truck loader and trains,send to different parts of the country.
THANK YOU