PROPOSED DESIGN, CONSTRUCTION AND COMPLETION

OF 548 UNITS GOVERNMENT APARTMENTS AT


PARCEL 17 RM4 PRECINCT 17, PUTRAJAYA

PROGRESS REPORT ON 28 JUNE 2009 – 31.26 Actual / 31.34 Target


IBS: TABLE OF CONTENTS

 BENEFITS OF IBS
 PROJECT COMPONENTS
 CONSTRUCTION ELEMENTS
 TYPICAL FLOOR LAYOUT
 TYPICAL UNIT
 CASTING SECTION
 DELIVERY SECTION
 INSTALLATION SECTION
 MOCK-UP UNIT
Page 2
IBS: BENEFIT OF IBS

 Reduce Construction Time


 Cost Competitive
 Labour Independency
 Material Optimisation
 Quality and Better Finishes
 Flexibility in Design
 Safety and Environmental Friendly
 Production in Controlled Condition

Page 3
IBS: PROJECT COMPONENTS
BLOCK E Others:
PERSPECTIVE Car Parks 3 nos.(660
BLOCK D parking bays)
Substations 3 nos.
BLOCK C Landscape
Infrastructures
BLOCK B BLOCK A
LAYOUT PLAN

Block E

Car Park
3
Car Park 2
DEWAN
Dewan 2 Storey
N
SURAU
Surau 1 Storey
BLOCKS STOREYS UNITS
Car Park 1 A 18 115

Block D B 19 122
C 19 122
Block C D 18 115

Block B E 16 74
TOTAL 548
Block A
Page 4
IBS: CONSTRUCTION ELEMENTS

PRECAST
APARTMENTS
• 2nd Floor to 17th Floor
• Structural precast walls
• Precast hollowcore slab
• Non-structural precast wall panels
• Precast staircases
• Blockwork infill wall

Precast
CAST-IN-SITU
AMENITIES AND M&E ROOMS
• Ground and first floor
• Cast-in situ 250mm thk rc shear
wall
Cast-in Situ • Blockwork infill
• 2nd Floor
• Cast-in situ slab

Page 5
IBS: TYPICAL FLOOR LAYOUT

Page 6
IBS: TYPICAL UNIT (Cont’d)

Unit Size
-9.0m X 14.4m
(1,200 sqf)

3 Bedrooms
• Master Bedroom

(4.2m x 5.4m)
1 Living room
(4.2m x 9.0m)
1 Kitchen
(4.2m X 3.5m)
1 Store
(1.3m x 1.5m)
2 Bathrooms
Dry Yard

Page 7
IBS: CASTING SECTION (Hollow Core Panel)

Page 8
IBS: CASTING SECTION (Other Precast Panel)

Page 9
IBS: CASTING SECTION (Quality Assurance and Control) (Cont’d)

Page 10
IBS: DELIVERY SECTION (Cont’d)

Page 11
IBS: INSTALLATION SECTION (Cont’d)

Page 12
IBS: Construction of Joints and Support (Cont’d)

Page 13
IBS: Progress Photos (Cont’d)

Overall progress on 28 June 2009

Block E on 28 June 2009


IBS: Progress Photos (Cont’d)

Block D on 28 June 2009

Block C on 28 June 2009


IBS: Progress Photos (Cont’d)

Block B on 28 June 2009

Block A on 28 June 2009


IBS: Progress Photos (Cont’d)
IBS: MOCK-UP UNIT (Cont’d)