DISCUSSION TOPICS
STRUCTURAL DESIGN Discussion on Earthquake Loading - Ductility in structure - Common design mistakes & key points GOOD CONSTRUCTION Water/Cement ratio - Compaction - Curing
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOADING
The Seismic Zoning Map BNBC/2013
Seismic Zone 1 Location Seismic Intensity Low Seismic Zone Coefficient, Z 0.12
Southwestern part including Barisal, Khulna, Jessore, Rajshahi Lower Central and Northwestern part including Noakhali, Dhaka, Pabna, Dinajpur, as well as Southwestern corner including Sundarbans Upper Central and Northwestern part including Brahmanbaria, Sirajganj, Rangpur Northeastern part including Sylhet, Mymensingh, Kurigram
Moderate
0.20
Severe
0.28
Very Severe
0.36
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
Very roughly this Design Basis Earthquake PGA has a return period of 475 years.
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOAD
GROUND ACCELERATION OF EL-CENTRO EARTHQUAKE
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOAD
Design Acceleration Response Spectrum
0.350 0.300
Spectral acceleration,sa
0.250 0.200 0.150 0.100 0.050 0.000 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 2.8 3 3.2 3.4 3.6 3.8 4
Period, sec
A TYPICAL RESPONSE SPECTRUM CURVE FOR COMILLA ZONE SOIL- ROCK AS PER BNBC/2013
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOAD
0.140
= 3.0
EARTHQUAKE LOAD
RESPONSE SPECTRUM AS PER BNBC/2013
Art. 2.5.4 Art. 2.5.6.2 Art. 2.5.7.1 Table 2.5.7 Table 2.5.4 Table 2.5.4 Table 2.5.4 Table 2.5.4 Eqn. 2.5.6 Art. 2.5.6.3 Table 2.5.1
EARTHQUAKE RESISTANT DESIGN- BASIC CONCEPT PROJECT LOCATION Comilla Seismic zone coefficient for Maximum Considered Earthquake , Z 0.2 g Structure importance factor, I 1 Seismic Force-Resisting Structural System Ordinary reinforced concrete moment frames Response reduction factor , R 3 Lower llimit of the period of the constant spectral accleration branch, TB Upper llimit of the period of the constant spectral accleration branch, TC Lower llimit of the period of the constant spectral displacement branch, TD Site dependent soil factor defining elastic response spectrum, S Damping correction factor, Viscous damping, Coefficient used to calculate lower bond for Sa , Site classification based on soil properties
0.140
Table 1 Acceleration response spectrum data Sa T 0 0.05 0.1 0.15 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 2.8 3 3.2 3.4 3.6 3.8 4 0.051 0.070 0.089 0.109 0.128 0.128 0.128 0.096 0.077 0.064 0.055 0.048 0.043 0.038 0.032 0.027 0.023 0.020 0.017 0.015 0.013 0.012 0.011 0.010
Spectral acceleration,sa
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOAD
IF WE ARE LITTLE COURAGEOUS WHY NOT USE TIME HISTORY DATA FOR OUR BUILDING ANALYSIS ? WE CAN GENERATE A RESPONSE SPECTRUM COMPITABLE TIME HISTORY DATA WITH LITTLE EXPERTISE IN NUMERICAL MATHEMATICS.
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOAD
Time history 1
0.6 0.4 0.2 -0.0 0 -0.2 -0.4 -0.6 2 4 6 8 10 12 14 16 18 20
t (s)
TIME HISTORY CURVE FOR BNBC/2013 RESPONSE SPECTRUM CURVE AS SHOWN BEFORE
WWW.SABBIRSIDDIQUE.COM
EARTHQUAKE LOAD
Response Spectrum 1
0.18 0.16 0.14 0.12 0.10 0.08 0.06 0.04 0.02 0.00 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
T (s)
TIME HISTORY DATA MATCHING TARGET SPECTRUM
WWW.SABBIRSIDDIQUE.COM
DUCTILITY IN STRUCTURE
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
LOADS IN BUILDING
WE HAVE GOOD UNDERSTANDING OF PERMANENT GRAVITY LOADS (DEAD & LIVE). WE HAVE LESS UNDERSTANDING ON ENVIORNMENTAL LOAD e.g. WIND & EARTHQUAKE.
WWW.SABBIRSIDDIQUE.COM
BEAM DESIGN
TORSION IS AN IMPORTANT ISSUE BUT USUALLY NOT CONSIDERED IN RC DESIGN BECAUSE GENERAL PURPOSE ENGINEERING SOFTWARE ONLY CONSIDER STRONG AXIS MOMENT/SHEAR FOR RC DESIGN. THIS IS A GREAT MISTAKE. NEVER CHECK DETAILING AT JOINTS. REINFORCEMENT
WIDTH,
WWW.SABBIRSIDDIQUE.COM
COLUMN DESIGN
COLUMN FAILS IN SHEAR DURING EARTHQUAKE COMMON PRACTICE IS TO DESIGN COLUMN FOR AXIAL FORCE AND MOMENT ONLY. WHAT ABOUT MOMENT MAGNIFICATION IN COLUMN DESIGN? OR OTHERWAY TO CONSIDERE GEOMETRIC NON-LINEARITY? DID YOU KNOW- STIFFNESS OF THE STRUCTURE REDUCE FOR AXIAL COMPRESSION?
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
Dry Concrete?
Never just add water to the concrete to make it more workable, always use a mix of cement paste (i.e. water AND cement).
WWW.SABBIRSIDDIQUE.COM
Compaction of Concrete
Compaction is done by shaking, or vibrating, the concrete which liquefies it, allowing the trapped air to rise out.
Compaction must be done as concrete is placed, while it is still plastic. Never let concrete dry-out and stiffen because it will be too hard to compact. Properly compacted concrete is more dense, strong and durable. Offform finishes will also be better.
WWW.SABBIRSIDDIQUE.COM
Compaction of Concrete
Put the poker into the concrete QUICKLY. The area vibrated at one time is called the RADIUS OF ACTION. This can be seen by over what radius air bubbles rise to the surface. The radius of action will be greater with a LARGER poker and more-workable concrete. Take the SLOWLY poker out Always compact in a definite pattern so the very radius of action overlaps and covers the whole area of the concrete.
WWW.SABBIRSIDDIQUE.COM
Compaction of Concrete
NEVER spread or move concrete sideways with the poker, always use a shovel.
NEVER touch the form face with the poker as it can damage the formwork and the concrete.
WWW.SABBIRSIDDIQUE.COM
Strength VS Compaction
WWW.SABBIRSIDDIQUE.COM
Curing of Concrete
WHAT IS CURING ? Curing means to cover the concrete so it stays MOIST. By keeping concrete moist the bond between the paste and the aggregates gets stronger. Concrete doesnt harden properly if it is left to dry out. WHEN TO CURE? Curing is done just after finishing the concrete surface, as soon as it will not be damaged.
WWW.SABBIRSIDDIQUE.COM
Curing of Concrete
The simplest method of APPLYING WATER is to put a continuous fine, misty spray of water over the concrete. BEWARE: The spray must be a very fine mist or else it will damage the surface of the concrete. Concrete will dry out more quickly in hot weather. Keep the concrete continuously moist. The most important thing in curing is to keep the concrete moist at all times. Hosing in the morning and again at night and letting the concrete dry out in between is not good.
WWW.SABBIRSIDDIQUE.COM
Curing of Concrete
Another way to cure concrete is to cover with PLASTIC SHEETS to slow down water loss. Concrete may also be cured by applying a CURING COMPOUND [EVAPORATIVE RETARDANT (Aliphatic Alcohol)] which slows water loss. Recent example is 3rd Karnafuly Extra dosed Cable Stayed Bridge. Another passive way of Curing is to keep the formwork for long time.
WWW.SABBIRSIDDIQUE.COM
Strength VS Curing
WWW.SABBIRSIDDIQUE.COM
WWW.SABBIRSIDDIQUE.COM
Left you drawing incomplete thinking that it would be done at site during construction.
Provide a drawing information in it. without necessary
WWW.SABBIRSIDDIQUE.COM
Do not make a KICKER for Column Casting. If you need something like a KICKER to place the formwork make it at least 300mm high so that you can vibrate it with Poker Vibrator. And NEVER use hand-mix concrete for such construction.
WWW.SABBIRSIDDIQUE.COM
Do not add cement grout on old concrete to pour new concrete. Fresh water is good enough. If required use jointing material e.g. SIKADUR-31 or other similar.
WWW.SABBIRSIDDIQUE.COM
WITHOUT PROPOER CONSTRUCTION KNOWLEDGE & EXPERIENCE YOU WILL NEVER BE GOOD DESIGNEER.
WWW.SABBIRSIDDIQUE.COM
FURTHER QUESTIONS?