Basic of Power Generation Combustion Process Power Plant Cycle Factors affecting Efficiency Boilers and Turbines Transmission of Power and Switching

10 October 2013

ENERGY SOURCES

RENEWABLE ENERGY 1. SOLAR ENERGY 2. WIND ENERGY 3. WAVE ENERGY 4. BIO DIESEL POWER 5. HYDEL POWER 6. GEOTHERMAL
3

10 October 2013

ENERGY SOURCES

NON RENEWABLE ENERGY 1. THERMAL POWER 2. GAS BASED POWER 3. NUCLEAR POWER

10 October 2013

ENERGY SOURCES

10 October 2013

10 October 2013

How Generated electricity reached customer

10 October 2013

Simplified Diagram

10 October 2013

Coal to Electricity .. Basics


Pollutants

Coal

Super Heated Steam


Heat Loss In Condenser

Turbine Torque
Mech. Energy Loss

Alternating current in Stator


Elet. Energy Loss

Heat

ASH

Loss

Chemical Energy

Thermal Energy

Kinetic Energy

Electrical Energy

10 October 2013

Rankine Cycle

10 October 2013

10

10 October 2013

11

10 October 2013

12

To HP Turbine Mixer Header

To IP Turbine

Separator

FRH

FSH Platen Heater From CRH Line LTRH LTSH

From FRH Line Economizer Phase 1 Economizer Phase 2

Boiler Recirculation Pump

Bottom Ring Header

Why Coal?
Advantages of Coal Fuel Abundantly available in India Low cost Technology for Power Generation well developed. Shortcomings of Coal Low Calorific Value

Large quantity to be Handled


Produces pollutants, ash Disposal of ash is Problematic Reserves depleting fast

Easy to handle, transport, store and use

Indias Coal Reserves are estimated to be 260 billion tonnes. Present consumption is about 450 million tonnes. Cost of coal for producing 1 unit of electricity (Cost of coal Rs 1000/MT)is Rs 0.75.
10 October 2013 16

Knowing more about Coal


Coal Properties Calorific Value Grade of Coal (UHV) Proximate Analysis Ultimate Analysis Ash and Minerals Coal Transportation Rail

Truck
Conveyor Ship

Grindability
Rank Coal production Surface Mining Underground Mining Physical Characteristics

Coal production
Surface Mining Underground Mining

Coal Beneficiation
Why? Processes Effectiveness

Useful Heat Value (UHV) UHV= 8900-138(A+M)

10 October 2013

17

Coal Handling Plant

Wagon Tippler Stacker re-claimer

Bottom Discharge Wagon Coal Crusher

10 October 2013

18

Fuel Oil

Three liquid fuels used in power plants


1. Heavy Fuel Oil (HFO) 2. LSHS (Low Sulfur Heavy stock) 3. High speed Diesel (HSD) Oil firing is preceded by Lowering viscosity and increasing flowability on heating for better combustion in given turn down ratio.(125oC) Droplet formation on atomization (by steam/ compressed air/ mechanical pressurization) Combustion initiation by High energy spark ignition

10 October 2013

19

Carnot Cycle
Critical Point 221 bar-a, 371 deg-C Temp
e d b 2 a 1 3 c 4 g 5 6 f 6

Supercritical Cycle a-b-c-d-e-f-g-h-i-a

h 8

Subcritical Cycle 1-2-3-4-5-6-7-8-9-1 Entropy


20

10 October 2013

10 October 2013

21

10 October 2013

22

10 October 2013

23

BOWL MILL

10 October 2013

24

Boiler Auxiliaries
Air Pre-heater : Air pre-heater transfer heat from flue gases to cold primary and/ or secondary air by means of rotating heating surface elements. Beneath this regenerative type air pre-heaters, there exists a steam coil air pre-heater. These are located in the secondary pass of the furnace at a height of around '16' M level. Each 200 MW unit is provided with two such air pre-heaters. Burners : As evident from the name itself, these are used for burning pulverised coal or oil. Every unit has a set of such burners located at different elevations of 10 October 2013 25 the furnace.

10 October 2013

26

10 October 2013

Ljungstrom type Bisector

27

Boiler Auxiliaries

10 October 2013

F.D.Fan : The forced draft fans (2 per unit - 50% capacity each) are designed for handling secondary air for the boiler. These fans are located at '0' M level near the PA Fan. Wind Box : These act as distributing media for supplying secondary/excess air to the furnace for combustion. These are generally located on the left and right sides of the furnace while facing the chimney. Scanner Fan : These fans, two per boiler, supply requisite air for scanner cooling.

28

Boiler Auxiliaries

Electrostatic precipitator : These are generally two plate type located between boiler and the chimney. The precipitator is arranged for horizontal gas flow and is constructed with welded steel casings. ID Fans : There are two induced Draft fans per boiler located between the Electrostatic precipitator and the chimney. These fans are used for sucking flue gas from furnace.

10 October 2013

29

ESP

10 October 2013

30

10 October 2013

31

Boiler/ steam generator

Steam generating device for a specific purpose.


Capable to meet variation in load demand Capable of generating steam in a range of operating pressure and temperature For utility purpose, it should generate steam uninterruptedly at operating
32

10 October 2013

Boiler/ steam generator


1.

Raw materials for design of boilers Coal from mines Ambient air Water from natural resources (river, ponds)

o o

2.

Generating heat energy Air for combustion Working fluid for steam generation, possessing heat energy

3.

A 500MW steam generator consumes about 8000 tonnes of coal every day It will be considered good, if it requires about 200 cubic meter of DM water in a day It will produce about 9500 tonnes of Carbon di Oxide every day
10 October 2013 33

Types of Boilers

Water Tube Boiler:

Here the heat source is outside the tubes and the water to be heated is inside. Most highpressure and large boilers are of this type. In the water-tube boiler, gases flow over water-filled tubes. These water-filled tubes are in turn connected to large 10 October 2013 containers called drums.

34

Pictures of Some Components


Drum

In side Furnace
10 October 2013 35

10 October 2013

10 October 2013

PMI Revision 00

36

36

Steam Turbine

Steam Turbine Stages:


Impulse Reaction

Steam Turbine Components


Control and Stop Valve HP/IP Turbine LP Turbine Rotor Bearings (Journal and Thrust) Turning Gear Front Pedestal Condenser
37

10 October 2013

Generator

Principle of electricity Generation Generator Construction

10 October 2013

38

Stator Core

Cooler Insert Cover Rotor fan

End Shield

Wdg Overhang
Oil Catcher Rotor

Bearing Shaft Seal

Stator
10 October 2013

Terminal Bushing
39

Main Parts of Turbogenerator

Steaming Capacity

Large boiler capacities are often given in Tonnes of steam evaporated per hour under specified steam conditions

10 October 2013

40

10 October 2013

41

ARRANGEMENT OF MAIN BOILER (STEAM GENERATOR)


A STEAM GENERATOR IS A COMPLEX INTEGRATION OF THE FOLLOWING ACCESSORIES: * ECONOMISER * BOILER DRUM * DOWN COMERS * CCW PUMPS * BOTTOM RING HEADER * WATER WALLS
10 October 2013

* LTSH * DIV PANEL * PLATEN SH * REHEATER * BURNERS * APHs


42

10 October 2013

43

Tangential Firing System

10 October 2013

44

10 October 2013

45

Steam Flows from Boiler to turbine

Bypass

Turbine

10 October 2013

46

Turbine are multistage


The steam turbine is a form of heat engine that derives much of its improvement in thermodynamic efficiency from the use of multiple stages in the expansion of the steam

10 October 2013

47

Generator Transformer

10 October 2013

48

Switchyard One line Diagram

Transfer Bus 400 KV Main Bus II Main Bus I

Bus Isolator

CB CB CB Transfer Bus Bay

GT 20.5/400KV
10 October 2013

Gen Bay

49

Feeder Bay

SF6 CB

10 October 2013

50

Power Generation, Transmission and Distribution