Turbine Protections
Turbine Cycle
IPSV1 IPCV 1
FROM HRH
EXCITER 6
IPT 2X12
LPT 2X6
Monitoring
Protection
Machinery Monitoring The first level of Machinery Management is simply monitoring the machinery responses.
Sensors
Monitoring System
Sensors
Monitoring
Protection
Machinery Protection
Distributed Control System
Control System
Protection System
Sensors
Sensors
240 V DC
RELAY UNIT
24 V DC
Trip S/N
Drain
OR (2/3)
CHANNEL-1
MOT LEVEL <17% MOT LEVEL <17% MOT LEVEL <17% CHANNEL-2
OR (2/3)
Method of checking
Draining the Pr. Switches
Field Instruments
Pressure Switches Level Switches
Method of checking
Field Instruments
Proximity Sensors
45O
45O
SHAFT
Method of checking
Field Instruments
T/C
T/C
T/C
DP Switches
T/C
Method of checking
Simulation
Description
LP turbine exhaust steam pr. MAX and Gen. Field breaker Not open (2/3 logic) LP Heater-1 Level Hi-Hi (2/3 logic) with 40 sec. delay Condenser Hot well Level Hi-Hi (2/3 logic) CW supply not on
Method of checking
Simulation
Field Instruments
Vacuum Tranismitter
11
> + 30 mm
Actual
12 13
Actual
Method of checking
Simulation
Field Instruments
Sl. No. 15
Description
Turbine trip on Boiler trip MFT A/ B (inter trip)
Method of checking
Simulation
Sl. No.
Description
Turbine trip on Generator (inter trip)
Method of checking
Simulation
Field Instruments
16
From Logic
Method of checking
By simulation at switch end. Actual
Field Instru.
Level Switches Level Switches
18
19
> 8.00 By simulation Micro S/cm at switch end. > 90 Deg.C By simulation at switch end. <20% Actual
20 21
Method of checking
Simulation
Temp. Switch
Sl. No. 23
Description
Both 400 KV Breaker Open
Method of checking
Field Instruments
Method of checking
Actual
24
Actual
Method of checking
Lowering the Limit value
Field Instruments
From Trip Logic
26
Trip Bolts
Thank You