Professional Documents
Culture Documents
INTRODUCTION
ADDRESS
AIROD SDN. BHD. Locked Bag 4004 Pejabat Pos Kampung Tunku 47309 Petaling Jaya Selangor Darul Ehsan MALAYSIA. AIROD SDN. BHD. Sultan Abdul Aziz Shah Airprot Jalan TUDM (Adjacent To Terminal 3) 47200 Subang Selangor Darul Ehsan MALAYSIA.
Departments in the AIROD: Quality Assurance & Safety Department Repair and Overhaul (MRO) Department Propulsion and Aero Component Department Program Management Office Department
AIROD
Aircraft Inspection, Repair, Overhaul Depot. servicing 78 customers in 33 countries. AIROD is a wholly owned subsidiary of National Aerospace and Defense Industries (NADI).
AIROD Vision Leading International Aerospace Partner delivering Professional Services, meeting Customer Satisfaction at world class standards.
AIROD Mission To excel and growth profitable, and Focus on Strategic Business and Partnerships, achieving Customer Satisfaction through delivering highest level of Quality, Safety and Value services, in the most Effective and Professional manner.
AIROD Objective Our objective is to be a growing source of pride to the nation, our customers, our shareholders and our employees and their families.
The branches are located at the location : TUDM Subang TUDM Sungai Besi TUDM Alor Setar TUDM Kuantan TUDM Kuching The scope of ISO 9001:2008 certification covers the following areas: Aircraft Maintenance and Modifications Overhaul and Rectification of aircraft engines and engine component Overhaul and Rectification of aircraft components Overhaul and Rectification of avionics components Aircraft Line Operations and Maintenance Provision of design and development of Engineering Services
ENGINE SHOP
ENGINE SHOP
Doing the maintenance job on several type of engine from different aircraft: J85 CT58 or T58 T56 PC7
Experience
Experiencing hands on work Learn more about engine Sharing opinion with the technician based on their experience
1.Disassembly process
2. Cleaning process
3. Inspection (NDT)
3. Final Assembly
Engine testing
performance checks are conducted after maintenance of an engine, and checks the operating condition .
Engine testing
Purposes of engine testing: To check whether the engine operates at optimum performances. To detect problems before being assembled to the aircraft
(ii)
(iii)
Obtaining and maintaining design certification and approvals by airworthiness authority such as DGTA or DCA. Obtaining and maintaining Technical Training Approval and certification by authority. Maximizing manpower utilization within approve operating budget.
My task
Recovery Project of Tunisia C1-30
MAF Lists "Maintenance Action Form"
Pre-identified Defect Rectification Center and Outer Wing Fuselage Seats Landing Gear Elevator, Rudder & Aileron Aircraft Wiring Painting Flight Deck
Identified parts/maintenance
ORDERED ISSUED NO STATUS
December 2013
Support Workshop
Type of aircraft
Sikorsky S61-A4 Alouette III Agusta A109P and A109LOH
Inspection repair overhaul and functional testing of gearboxes, transmission hydraulic systems landing gear systems air conditioning all related components
inspection and repair avionics and electronics equipment including : Communications Test Equipment Navigation and Ground Support equipment.
Floorboard is strap with the electrical tape the staffs are doing an alignment of the tail rotor blade.
Task done: - Touring around the hanger - Learnt more about jargon used in industry e.g buttock line, water line - Attended class conducted by supervisor - Help technician in removing fuel shutoff valve inside fuel tank
1. Clean
2. Apply penetrant
Steps: 1. Clean 2. Magnetize 3. Apply the suspension 4. Visual Inspection 5. Demagnetizing after inspection
The presence of flaw is analysed based on the time the reflected wave received. Can be used to find depth of defects. Portable device
Can detect surface and subsurface defect (cracks) Able to inspect complex structures without disassembly
Thank you