You are on page 1of 26

M2000 V200R012C00 Topology Management

Supplemented based on M2000 V200R011


www.huawei.com

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Objectives

Upon completion of this course, you will be able to:

Construct and manage the topology structure of the entire


network.

Learn and monitor the running status of the entire network by

browsing the topology view.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page2

Contents
1. Basic Concept 2. Creating a Physical Subnet 3. Creating a Physical NE 4. Monitoring an NE 5. Adjusting the Network Topology

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page3

Topology Management Function

Navigation tree

Toolbar

Topology view
Page4

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Objects in Topology

Objects in topology indicate the objects in the network. Each

element managed by the NMS is an object.

An object can be a subnet, an NE, a group NE, or a link between NEs.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page5

Contents
1. Basic Concept 2. Creating a Physical Subnet 3. Creating a Physical NE 4. Monitoring an NE 5. Adjusting the Network Topology

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page6

Designing a Physical View

Before deploying NEs in a physical view, you need to design a physical subnet. The physical topology must show the topology structure of the actual telecommunication network and facilitate the routine operation and maintenance of operators.

On the physical topology, topology objects and the hierarchical relationship among objects are shown in the navigation tree on the left; all topology objects on the existing subnet and the location relationship among the objects are shown in the topology view on the right.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page7

Setting the Topology Background

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page8

Creating a Physical Subnet

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page9

Contents
1. Basic Concept 2. Creating a Physical Subnet 3. Creating a Physical NE 4. Monitoring an NE 5. Adjusting the Network Topology

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page10

Classification of Physical NEs

A physical NE is a communication device that is connected

to the M2000 and can be managed by the M2000. The


M2000 can manage a communication device only when the corresponding physical NE is created on the M2000.

The M2000 divides the managed mobile network devices


into the devices of the GSM, WCDMA, CDMA, WiMAX, and LTE network based on the network that the NE belongs to.

IP devices are independent of the preceding networks.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page11

Creating a Single Physical NE

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page12

Creating Physical Links

A physical link is a physical connection between two physical NEs. You can have a clear understanding of the telecommunication network between NEs and the communication status by setting up a physical link. The MTP3 MTP3B, and DATALINK links must be created manually.

Currently, the M2000 supports the following link types: M3UA,


H248, BICCSCTPLNK, DATALINK, MTP3, and MTP3B.

M3UA, H248, and BICCSCTPLNK links are automatically created

by the system. MTP3 MTP3B, and DATALINK links must be


created manually.

You can delete only physical links that are manually created.
Page13

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Creating Multiple Physical NEs

The M2000 supports the function of creating multiple

physical NEs to reduce the maintenance workload. You can


create multiple physical NEs at a time on the topology.

Before creating multiple physical NEs in batches, you must

copy the information about the physical NEs to be created


to an .ini or .csv file. The operation does not support the creation of virtual NEs.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page14

Exporting an NE Information Template

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page15

Creating NEs in Batches

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page16

Contents
1. Basic Concept 2. Creating a Physical Subnet 3. Creating a Physical NE 4. Monitoring an NE 5. Adjusting the Network Topology

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page17

Monitoring an NE

You can choose System > NE Monitor to view the NE status, including the NE name, NE type, alarm status, and connection status.

Common icons in the topology view:

NE disconnected: NE disable connection: Synchronizing:

Alarm contained:

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page18

Setting NE Reconnection Status

When an NE is disconnected from the M2000 server, you can specify whether the M2000 server attempts to reconnect the NE.

There are two reconnection states:

Enable Connection

When an NE is disconnected from the M2000 server, the M2000 server attempts to reconnect the NE. By default, the reconnection status of a newly added NE is Enable Connection.

Disable Connection

When an NE is disconnected from the M2000 server, the M2000 server


does not attempt to reconnect the NE.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page19

Manually Reconnecting an NE

You can manually reconnect an NE to the M2000 server when the NE is disconnected from the M2000 server.

In the physical topology view, right-click an NE with and choose Reconnect

NE from the shortcut menu.

disappears after the reconnection is successful.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page20

Monitoring Cell Status


You can browse the cell status of a GBTS, NodeB, eNodeB, or MBTS by selecting the GBTS, NodeB, eNodeB, or MBTS. In addition, you can block and unblock, activate and deactivate a cell, and switch to the performance monitoring window of the cell by using the shortcut menu.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page21

Contents
1. Basic Concept 2. Creating a Physical Subnet 3. Creating a Physical NE 4. Monitoring an NE 5. Adjusting the Network Topology

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page22

Adjusting the Network Topology

After a subnet, NEs, and links are

successfully created, you can


adjust the network topology as required. The network topology

adjustment involves operations


such as modification and deletion of the subnet, NEs, and links. The

shortcut menu supports the


preceding operations.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page23

Adjusting the Topology View

You can adjust the topology view as required. The topology view adjustment involves showing or hiding the topology navigation tree, switching the current subnet, displaying the topology view in full screen, zooming the topology view, and customizing the topology prompt information.

Create a link Search for an NE Show alarm browse region Show legend, filter, and attribute Zoom

Refresh

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page24

Setting the Default Topology View

Set the currently selected subnet to the default subnet that

is displayed when you enter the topology view.

The configured subnet is directly displayed when you enter the main topology window next time.

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page25

Summary

This course describes the following:

Basic concepts about the topology, including the network


topology type, topology object, and topology shortcut menu.

How to create and manage subnets and devices

How to monitor the NE status and adjust the display of the


network topology

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Page26

You might also like