Plant details Objectives Services required Safety State of the plant Method Completion criteria
Plant details
Steam Generator is a controlled circulation plus Radiant Reheat (Type CC+RR) Boiler Pipeline dimensions are: MS pipelines(406X38,559 x 54 ) CRH (864 x 35,660X20),HRH LINES (711X25,914 x 30) HP bypasslines(323.9 x 38 / 508 X 25 ) LP bypass lines(610 x 25 )
Plant Details
3 CC pumps are provided to ensure proper circulation of water in the furnace wall circuits. 9 or 10 Mills/RC feeders 2 Seal air fans/P A/ID/FD fans 2SAPH/2PAPH
Services required
Sufficient quantity of DM water and Fuel Oil. Availability of HT / LT / 220 VDC / 110 VAC and other critical Power / Control supplies. Availability of Instrument / Service Air Availability of Lab facility for boiler water regime maintenance. Availability of Auxiliary steam.
Services required
Availability of dosing systems. Availability of permanent fire fighting system and portable fire extinguishers at identified locations. Availability of required lighting / communication facility / manpower. Availability of Public address System or Siren to communicate the commencement of steam blowing. Availability of Ambulance / Fire tender in the Power station premises.
Safety
The blowing area should be barricaded. Required quantities of safety gears such as helmets, Asbestos hand gloves, Ear mufflers etc should be available. First aid box should be available in control room Service water should be available near the activity area.
Method
Steam blowing shall be done in eight stages viz Stage 1, 2a, 2b, 3a, 3b, 4a, 4b & 5. Electrically Operated Temporary Valves (EOTVs) shall be located as shown in the scheme. Loop pipes from ESV and IV to Turbine shall not be steam blown. Hence proper care shall be taken for cleanliness of the pipes before erection. All critical pipelines covered in stages 1, 2a, 3a and 3b shall be steam blown using EOTVs. Only in Stage 2b, MS stop valve at Boiler outlet shall be used. Puffing method shall be adopted for carrying out Steam blowing of stages 1, 2a, 2b, 3a & 3b in which Boiler Drum pressure shall be raised to 50 Kg/cm2 and released through a quick opening valve and steam blowing done till the Drum pressure drops from 50 Kg/cm2 to 25 Kg/cm2.
Method
Steam blowing for stages 4a, 4b and 5 shall be carried out by continuous blowing method. Duration of each blow shall be 20 to 30 minutes. The time gap between two blows shall be around 2 hours. The effects of steam blowing shall be evaluated and steam blowing concluded as per the completion criteria
A C
R H O H D R
R H I H D R
D E S H
S H I H
S H O H
ESV M S L
D
C R H N R ESV V EOTV
A
C E
HRH LINE
-- S.H & MS LINE --THRO / BLANK FLANGE -- CRH & HPBP --TARGET PLATE -- R.H & HRH LINE -- LPBP LINE -- TEMPORARY PIPING -- PERMANENT PIPING LPBP V/V
E
TO CONDENSER
HOTV-HAND OPERATED TEMPORARY VALVE -- OPEN INDICATION -- CLOSE INDICATION EOTV ELECTRICALLY OPERATED TEMPORARY VALVE
STAGE-I
MS STOP V/V
EOTV
A C
R H O H D R
R H I H D R
D E S H
S H I H
S H O H
ESV M S L
D
C R H N R ESV V
HOTVs
HPBP SPOOL PIECE 450
EOTV
A C E
HPBP LINE LPBP V/V CRH LINE HRH LINE -- S.H & MS LINE --THRO / BLANK FLANGE -- CRH & HPBP --TARGET PLATE --UN TREATED PIPE -- TEMPORARY PIPING -- PERMANENT PIPING LPBP V/V
TO CONDENSER
-- OPEN
-- CLOSE
STAGE-1 FLANGES BLOW OFF COVERS "B,"C,"D&"E V/V OPENED SUPER AT 50 MS STOP STEAM BLOWING VALVES IN IS TO BE ARE Ksc HEATERS & BLANKED, CLOSED & MS AT LINE "A 25 IS UP Ksc TO OPEN CARRIED CONDITION OUT USING EOTVS OPENED DRUM ESV PRESSURE
STAGE-IIA
MS STOP V/V
EOTV
A C
R H O H D R
R H I H D R
D E S H
S H I H
S H O H
ESV M S L
D
C R H N R ESV V EOTV
HOTVs
A C E
HPBP LINE
LPBP V/V
CRH LINE
HRH LINE
-- S.H & MS LINE --THRO / BLANK FLANGE -- CRH & HPBP --TARGET PLATE --UN TREATED PIPE -- R.H & HRH -- LPBP -- OPEN -- CLOSE -- TEMPORARY PIPING -- PERMANENT PIPING LPBP V/V
E
TO CONDENSER
FLANGES SUGGESTED STAGE-2 COVERS A,B,"D&"E BLOWING S.H, MS JUMPER MS STEAM DESH STOP IN BLOWING CRH LINE VALVES LINE CONN. IN IS ISTO TO NOT BE CRH TO IS ARE PRESSURE LINE,JUMPER BLANKED, IS AFTER CONNECTING FROM C IS 50KscTO OPEN CARRIED BE TO BE ERECTED CONDITION TAKEN OUT USING EOTVs EOTVS OPENED 25 ESV Ksc & CRH LINE INSTALLED FOR STAGE-1
STAGE-IIB
MS STOP V/V
EOTV
A C
R H O H D R
R H I H D R
D E S H
S H I H
S H O H
ESV M S L
D
C R H N R ESV V EOTV
HOTVs
A C E
HPBP LINE
LPBP V/V
CRH LINE
HRH LINE
-- S.H & MS LINE --THRO / BLANK FLANGE -- CRH & HPBP --TARGET PLATE --UN TREATED PIPE -- R.H & HRH -- LPBP -- OPEN -- CLOSE -- TEMPORARY PIPING -- PERMANENT PIPING LPBP V/V
E
TO CONDENSER
FLANGES STEAM STAGE-2B BLOWING A,"D&"E COVERS IS S.H, TO ARE BE MS DESH EOTVs IN ARE CRH INLINE CLOSED IS NOT TO BLANKED, CARRIED LINE,H.P BYPASS OUT B&C USING LINE& ARE MSCRH CONDITION BE ERECTED OPENED STOP LINE VALVES
STAGE-IIIA
MS STOP V/V
EOTV
A C
R H O H D R
R H I H D R
D E S H
S H I H
S H O H
ESV M S L
D
C R H N R ESV V EOTV
HOTVs
A C E
HPBP LINE
LPBP V/V
CRH LINE
HRH LINE
-- S.H & MS LINE --THRO / BLANK FLANGE -- CRH & HPBP --TARGET PLATE --UN TREATED PIPE -- R.H & HRH -- LPBP -- TEMPORARY PIPING -- PERMANENT PIPING LPBP V/V
E
TO CONDENSER
-- OPEN -- CLOSE
SUGGESTED MS FLANGES STEAM STAGE-3A DESH STOP IN BLOWING CRH VALVES A,B&"E COVERS BLOWING LINE ARE IS CAN S.H, TOARE BE MS BE IN OPEN CONDITION BLANKED, CARRIED LINE,JUMPER ERECTED PRESSURE OUT C&D IS 50 CONNG. USING KscTO ARE EOTVs ESV 25Ksc OPENED &CRH LINE,CRHLINE,R.H,HRH
STAGE-IV A
NEAR DEAERATOR FROM CROSS AROUND PIPES FROM IP / LP CROSS AROUND TO DEAERATOR FROM CRH
BACK TO INDEX
CRH-1
CRH-3
TDBFP-A
TDBFP-B
8 February 2014
PMI Revision 00
20
LEGEND :
1) D- Flange with or without dummy or temporary valve 2) TP:Target plate & assembly
5b 5a
APRDS
4b 4a & 5a 4b & 5b
TP
5a : APRDS to TDBFP-1 5b:APRDS to TDBFP-2 5c:CRH to EXT 4 5d : CRH to EXT 4 to D1 5e : CRH to DEA 5f :CRH to HP HEATER
FROM MSL
5i
5h
D
TP
5f
4a TD BFP-1
FROM CRH LINE
TD BFP-2
HPH 6B
FROM
5f
CRH LINE
5g
NOTE: 1) NRV Flaps to be removed wherever required
5e
HPH 6A
2) Direction of steam blow to be decided as per erection readiness of CRH vis--vis APRDS system
DE
FST
5d
where required.
5c
Completion criteria
Stages 1,2a, 2b, 3a, 4a, 4b, 5a, 5b For the first few blows Target plates need not be kept. Afterwards Target plates made of Mild Steel are to be used. For Final blows (for completion declaration) Stainless Steel Target Plates having mirror finish are used.
Completion criteria
Steam blowing can be declared complete only after ensuring cleanliness of target plates. The highest steam velocity being at the centre of the pipe, the effectiveness of steam blowing is judged by the absolute number of pittings on the target plate in the central zone i.e., the area covered by 3/4th of the diameter of the pipe. The piping is considered clean if there are not more than 5 (five) pittings on the target plate central zone and there are no deformed edges. This should be achieved in three consecutive plates. In addition to this, for stages 1, 2a and 3a Disturbance Factor at selected locations should not be less than 1.4.
Completion Criteria
Stage 3b Minimum 8 (eight) numbers of blows are to be given. Stages 5c to 5j Steam blowing is declared complete based on visual observation. Minimum three nos. of blows shall be given for each sub stage
DISTURBANCE FACTOR
Disturbance factor is the ratio of kinetic energy during blow condition and kinetic energy during MCR condition. Mathematically this is expressed as: b . Vb2 Disturbance factor = --------------- m . Vm2 where . V / . V are density & velocity at b b m m blow /MCRcondition
DISTURBANCE FACTOR
= b. Fb2/ m. Fm2 where b, m - Specific volume at blow & MCR condition and Fb , Fm - Flow at blowing and MCR condition respectively. MCR parameters: Steam flow at SH o/l =1675 t/hr,Sp vol =.018154m3/kg, Fm=465.2778KG/SEC
Tube Screw Plate Retainer Target Plate B Plate Plate Rod Rod 40 5 25
NOTE:
1 Tempoprary line shall be of carbon steel and size of the line shall be atleast equal to that of main steam line .For the purpose od designing .The rated parameters of the Boiler shall be taken.
25
2. The target plates supplied are of machined and polished one. MATERIAL: Stainless Steel
Special precautions
DRUM LEVEL SHOULD BE MAINTAINED AT LOWEST PORT (VISIBLE LIMIT) BEFORE THE START OF EACH BLOW TO AVOID WATER DROPLETS CARRYOVER TO THE SATURATED STEAM PIPING. NUMBER OF BLOWS PER DAY ARE LIMITED TO 8 WITH AN INTERVAL OF 1 Hrs FOR COOLING IN ADDITION TO OVER NIGHT COOLING