Professional Documents
Culture Documents
PRESENT BY:
ROAD DEPARTMEN T
26.07.2012 31.08.2012
01.09.2012 07.09.2012
BUILDING DEPARTMENT
Construction of 1 storey building of workshop at SMV Construction of 1 storey building of arc and gas at SMV Construction of Mosque Quarters 4 storey at Tg.Sedili Construction of Mosque at Pasir Gogok
This pre- handing over is be held in order o avoid incoming problem after full handing over. During this visit, the school need to prepared a representative in order to check up the school that are ready to hand over.
Problems: a. The switch is unable to function well b. The toilet is having leakage( piping system) c. Furniture that is not in accordance with drawings (unsuitable) etc. Solution: a. The sub contractor is needed to repairing the damage which have been trace by the school representative and JKR Technician.
Setting-out
Site Investigation
The rod is marked every 1feet.The rod is treaded together with barrel connectors. Light hand- operated driving hammer 5kg. During this step, they must count the number of blow and recorded for each 1feet. Tree location is disturbing the project.
Piles lifting .
Works of dig land before reinforcement is installed for pad footing. After reinforcement installation (lean concrete is needed)
While concrete being poured, raked and vibrated (beam and slab concrete)
Problem: the beam is filled with mud Solution: Spray of the clean water
S O L U T I O N
P R O B L E M
Problem: the concrete is dry up Solution: continuously wet by ponding with water.
ROAD DEPARTMENT
Routine Road Forensic Field Density Test (Sand Replacement Method)
RO1-Pavement
ROAD FORENSIC
Determination of pavement surface texture depth. Sand Patch Method
Portable skidresistance
Determination of the friction between a skidding tyre and wet road surface.
The surface to be measured is dry and is sweep clean with a soft brush.
The cylinder is filled with sand, the base is tapping three (3) times on the surface to ensure compaction, and the sand level with the top of the cylinder is strike off.
The sand is carefully pour into a conical heap on the surface to be tested
The handle of the wooden is holding between the thumb and fore finger, and without applying vertical pressure on the disc, the sand is spread in a spiral motion from the centre of the heap so that the sand is spread into a circular patch all times.
The below surface of the road is wet with the water to check lubricating the road when rainy day.
Rubber slider is let go (ensure it touch the road surface). The reading is recorded.
Lay metal tray with hole over the portion of material to be tested.
CONCLUSION
Able have many experiences and knowledge that could not achieve during in lecture is available while undergoing industrial training. Among premier was difference between theory and practical. Able to increase self confidence to face real work nature but also also help improve way in communicating and social intercourse with public Able to see how to communicate with workers subordinates or superior which involved with this department whether from
THANK YOU