Project Planning

Construction Management
Dr. Samia Ali

Company

LOGO

www.themegallery.com

Planning
Definition: It is the area that concerned with the various methods of arranging and employing materials, equipments, labours, money, and subcontractors to carry out the day-to-day operations of the project. .

Dr. Samia Ali

COMPANY LOGO

PLANNING : Who & Why?

www.themegallery.com

Estimating Dept. , to develop proposed onstruction methods, estimates.


Site manager. , to determine resource equirements to direct his resources. evaluate effect of changes. THE PERSON IN CHARGE OF WORK MUST PLAN HIS WORK OR SUFFER THE RESULTING UNCERTAINTY.

c
r

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

PLANNING TECHNIQUES
Bar Chart Network Techniques. * PERT, Program Evaluation & Review Technique. * CPM, Critical Path Method Technique. Resource Oriented Techniques. * LOB, Line Of Balance Technique. * Time-Location Technique.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

BAR CHART

During world war I, Mr. Gantt. Most directly and understood method for project planning. Limitations: dependencies not clear. Detailed activity not enough.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

BAR CHART
# 1 Foundations 2 Underground 3 services Rough 4 mechanical & Structural steel 5 Exterior walls 6 Roof 7 8 9 1St floor slab 2nd floor slab Operation Demolition Quantity duration Amt. Unit 8 14 6 12 5 12 6 4 6 12 10 8 -13.76 --50 371.6 464.5 76.46 95.57 -325.2 1208 -m3 --ton m2 m2 m3 m3 -m2 m2 3/30 4/6 4/13 4/20 4/27 Week Ending 5/4 5/11 5/18 5/25 6/1 8/6 6/15

Finish 10 mechanical & Interior part 11 Paint 12

Holiday

Work Planned Work Complete

5/1

Time Now

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

BAR CHART
Easy to understand, most widely used. List of activities, start, duration, and finish plotted in a time scale. Level of detail & time scale chosen to suit the users purpose. Good communication method between engineer and foreman.
% completion Activity# 1 2 3 Actual 100 67 40
Dr. Samia Ali

Programmed 100 95 95
COMPANY LOGO

www.themegallery.com

Network techniques
Both were developed independently in parallel CPM critical path method

1956, DU PONT CO.


Construction of chemical plants. Team headed by walker of DU PONT CO. & Kelley of ROND CORP. PERT program evaluation & review technique 1957, U.S. SPICAL Projects office. Hamilton, Manag. Consultants & Lockheed Missile & space Division (prim contractor)
COMPANY LOGO

Dr. Samia Ali

www.themegallery.com

THE CPM
A TIME MANAGEMENT TOOL THAT:
1- Overcome the difficult time control task. 2- Enable managers to handle large number of activities and complicated relationships in a simple and understandable way. 3- Applies well to all construction work. 4- Based on graphical network model.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

THE CPM
NETWORK :

1-Presents in diagrammatic form all the job activities and their mutual time dependencies.
2- A simple and effective medium for communication complex job inter-dependencies. 3- Serves as a basis for calculation of work schedules.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

THE CPM
A THREE PHASE PROCEDURE :

1- planning , what to be done, how, and logic.


2- schedule , when determines calendar date for project components 3- control , comparing actual progress with programmed schedule.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

THE CPM
ADVANTAGES: 1- shows relationships. 2- more effective planning. 3- pinpoints problem areas. 4- improves communications. 5- resource allocation. 6- study of alternate courses of action. 7- management by exception identifying the critical operations, and permits true MBE.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

THE CPM
Limitations : 1- Not a substitute for thinking or planning. 2- Project manager and his staff must be a part of the planning process. 3- Should not be confined to the preliminary planning stages of the project. 4- It furnishes only information.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

OUTLINE OF STEPS IN USING CPM


1- Analyze the project, define activities.
2- show activities technological dependences on a network chart. (precedence or arrow diagram) 3- estimate time duration for each activity and associated required resource. 4- basic scheduling, perform computations to locate critical path, and to obtain other useful scheduling information.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

OUTLINE OF STEPS IN USING CPM


5- time cost trade-offs., to develop the most economical project duration.
6- resources allocation, determine schedule resource feasibility and efficiency. 7- use schedule to control progress. 8- revise and update the schedule.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

Project documents
Activity list Basic resource managing Network diagram Duration & resource estimate Basic critical path calculations Time-cost adjustment

Time-resource adjustment
Schedule plan for implementation

Is current plan ok
update Project complete
COMPANY LOGO

Field reports

THE PLANNING PHASE

www.themegallery.com

Requires: 1- Intimate knowledge of construction method. 2- Ability to visualize discrete work elements. 3- Establish activities mutual inter-independencies. 4- done by experienced people familiar with the type of field work involved. 5- participation of responsible field implementation personal. Consists of three steps: Activity 1- determine job steps activities Logic 2- define activities sequential relationship. Network 3- present planning information on a network diagram

Dr. Samia Ali

COMPANY LOGO

THE PLANNING PHASE


Job activities :

www.themegallery.com

Activity : a single work step that has a recognizable beginning and end and requires time for its accomplishment. Project subdivision :
1. 2. 3. 4. Area of responsibility general or subcontractor Category of work labour, equipments, materials Structural elements footing, walls, beams Purpose owners bidding, payments , contractors cost accounting & estimate

Level of details : depends upon: - Who will use the network? - What are the users interests ? - Manag. Span of control.

Dr. Samia Ali

COMPANY LOGO

THE PLANNER ATTITUDES AND ASSUPTIONS

www.themegallery.com

Be prepared for the task Should have open mind with regard to construction methods. NO arbitrary imposed restrictions on activities. The planner must not only ask the field personnel HOW? They plan to do the job, but must be able to raise questions ask WHY? Things should be done they way proposed. Assume unlimited resources. Restrictions of time and space are not a proper consideration when constructing the initial network.
Dr. Samia Ali COMPANY LOGO

The activity list

www.themegallery.com

From reviewing plans and specifications. Job logic : - The determined order in which the activities are to be accomplished in the field . - Showing job activities logic produces the net work. - Evolves naturally as the job is discussed and the network diagram progresses. - For every activity in the activity list ask, what does this activity depends upon?

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

BASIC PRECEDENCE DIAGRAMING


Originally termed activity on the node by Fondahl.

Each time-consuming activity is portrayed by a rectangular figure.


The relationship among the activities are expressed by a connecting line or link from one activity to the other.

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

LOGIC BATTERNS
The identity of the activity and a considerable amount of other information pertaining are entered into its rectangular box.
20 60

A
20

B
30

a) Independent relationships

b) Dependent relationships

Activity B depends upon the completion of activity A


Dr. Samia Ali COMPANY LOGO

www.themegallery.com

LOGIC PATTERNS
20

A
22

30

40

B
20 30

E
40

c) Merging relationships

C
42

d) Bursting relationships

E
20 30

40

C
Redundant link to be removed
Dr. Samia Ali COMPANY LOGO

www.themegallery.com

LOGIC PATTERNS
A B C A
start

F E
Finish

Closing the network to give single beginning and ending activities


COMPANY LOGO

Dr. Samia Ali

www.themegallery.com

10

25

A
5
start

E
35
Finish

15

B
20 30

1 2 3 Sequence steps and network numbering

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

Drawing the diagram


Two stages : 1- Construct a rough diagram with all the dependences from the activity list. From this drawing the sequence no. for each activity are determined. 2- Assemble the finished drawing with the activities arranged in sequence step order. With all redundant links removed and with all activities given their final numbers.

Dr. Samia Ali

COMPANY LOGO

EXAMPLE: Remoulding chemical LAB


Activity list
# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 CODE 20 50 55 100 45 85 40 65 70 60 80 90 95 10 15 25 30 35 75 Activity Strip room Repair walls and ceiling Repair floor Lay vinyl floor Rough-in plumbing & electrical Finish plumbing & electrical Replace existing fume hood Install new fume hood Install 1/3 base cabinets Install wall cabinets Install chemical sink Paint cabinets Paint walls and ceiling Obtain vinyl floor covering Obtain cabinets obtain fume hood Obtain chemical sink Painter avialability Install 2/3 base cabinets 1, 1, 3, 1 2, 1 2, 2, 2, 2, 6, 2, Depends upon -5, 7 5 12, 13, 14 3, 5, 9, 10, 11, 12 3, 3, 3, 3, 8, 3,

www.themegallery.com

16 8, 13 7, 15 5, 9, 17 9, 10, 11, 12 6, 8, 9, 10, 12 -----2, 3, 9, 15

Dr. Samia Ali

COMPANY LOGO

www.themegallery.com

Ball-of-string diagram Remoulding chemical company

1 2 16 2
Contract award

18

11

2
4 10 2 4 17 2 3 4 5 3

8
9 6 7 3 10 5 8 5

14 2

12 9

19 7

15 2

13 9
COMPANY LOGO

Dr. Samia Ali

www.themegallery.com

Precedence diagram 1 2
10 14 15 15 20 5
Contract award

10

60 10 40 7 45 50 2 70 9 75 19

85

90 12

1 25 16 30 17 35 18

5
55 3

65
8

80
11 95 13

100 4