FOR ANY CLARIFICATION DURING VISIT, PLEASE CONTACT SRI S R SAMAL(ONE OF THE MEMBERS TO BE DEPUTED TO M/S UMPO, UFA FOR ISSUES RELATED TO 11 OEM RECOMMENDATIONS) , MANAGER (METHODS), HAL, KPT, SED MOBILE NO. : +919437526527
1
(Ref. 1.10 Protoco l)
Drive shaft and LPT rotor in angular position are to be assembled observing markings to compensate maximum spline eccentricity. Maximum permitted run out : 0.15mm
Implemented Ref .: DCN No. 4458 & -4489, TCN No. : 96T-20896. Applicability : TC962
2
(Ref. 1.11 Protoco l)
Reduce the value of face run out of LPT and HPT discs to 0.05 mm during Balancing checks.
CLARIFICATION :
1. Face runout on LPT rotor for engine no. 16-96-215 & 16-96-217 (supplied by OEM) is observed as 0.08 & 0.12mm respectively during balancing at HAL, Koraput after first test. To check IRS (available at OEM) for both the engines to verify the actual face runout as shown in the figure. 2. Difficulty is experienced during implementation of this change (face r/o of LPTR) notice at HAL, Koraput. The detail manufacturing and assembly technology at OEM is to be witnessed to bring clarity and machining procedure is being followed to maintain the r/o within 0.05mm.
CLARIFICATION :
3. As per TCN96T- 20888 (for LPTR), face run out of LPT disc in opn. No. 40035 has been changed to 0.04mm. In subsequent turning operation (opn. No. 40095 & 40100), face run out of disc is mentioned as 0.02mm. It is requested to clarify how to maintain the face runout within 0.02mm in turning operation if face runout already maintained within 0.04mm in opn. No. 40035. 4. The face runout of HPTR as recommended is achievable and implemented at HAL, Koraput.
3
(Ref. 1.12 Proto col)
Vibro packet manufactured. Modification carried out on Turbine support. Ref .: DCN No. 4480, -4481, 4472, -4473, 4474, -4484 TCN No. : 96T21012, 96T21098 96T-21028, 96T21056 Applicability : TC962, TC96-32, 104.04.00.061, 104.04.00.060, 104.04.23.030
CLARIFICATION :Ovality
is observed during pressing of bush, part no. 104.04.00.061 into bearing area of turbine support, part no. 104.04.23.030 (in one of the Phase-IV mfg. engine) at HAL, Koraput . As per technology provided incorporating the change notice, further polishing is to be carried out on ID of part no. 104.04.00.061 to maintain taper & ovality within 0.020mm and ensuring ID within 153.5 + 0.025mm. It is not understood how at OEM the same technology is being followed. During discussion with OEM rep. on 21.01.14, it was told that certain technological process modification is envisaged for implementation of the change notice. Thus, the process of fitment of bush (part no. 104.04.00.061) ensuring all technological conditions to be witnessed at OEM. Further development in modification of the process may be discussed in details.
4
(Ref. 1.13 Proto col)
Locking nut of the Inter Shaft bearing to be made of VJ-98 material. Premod part no. : 104.04.22.046-02 & 104.04.22.046-03 is changed to 104.04.22.096-01 & 104.04.22.096-02 with material change from 12X18H10T to VJ-98
Sl. No.
5 (Ref. 1.18 Proto col)
Recommendation
Activity / Manufacturing
Remarks
Balancing at 1st stage HPC Disc, Labyrinth, HPT Disc
To introduce three plane balancing of HP rotor and limit the max vibration limit to 25 mm/sec in place of 40 mm/sec.
Implemented Ref .: DCN No. 4459 TCN No. : 96T20884 Applicability : 104.0160 (DI) TC96-21
6
(Ref. 1.17 Proto col)
To carry out dimensional Implemented measurements / inspection of critical parts in controlled temperature condition at assembly area & CMM.
NO FURTHER CLARIFICATION
7
(Ref. 1.14 Proto col)
To optimize the clearance values of Change in Inter Rotor Bearing inner race with fitting LPT Nose. diameter of LPT Nose Existing Fitment : Interference : 0.010mm, Clearance : 0.015mm Ref .: DCN No. -4643, Fitment after Modification: 4644, -4645, Interference : 0.030.0.005mm TCN No. : 96T21747, 96TAction Involved : Change in fitting diameter 21748, 96Tof LPT nose from 110 0.015 mm to 110 21741 (+0.020 + 0.005) mm. During grinding of LPT Nose, dimension to Applicability : 104.04.22. be maintained. 063, 104.04.22.020, TC96-38
CLARIFICATION: Whether Chrome plating can be carried out on inner race of bearing to restore the fitment condition for already manufactured parts for PY2013-14.
8
(Ref. 1.15 Proto col)
To optimize the radial clearance values for Inter Rotor Bearing and Inter Shaft Bearings. Existing radial clearance : Minimum 0.025 mm Radial clearance after Modification: 0.025 . 0.075 mm REMARKS / CLARIFICATION : 1.DCN and TCN received by HAL,
Koraput for change in fitment condition and radial clearance values of interrotor bearing (implemented at HAL, Koraput). 2.How-ever for intershaft bearing, DCN & TCNs are not received. As per discussion with Mr. Permyakov at HAL, Koraput on 21.01.14, it was clarified that the implementation of change of fitment and radial play of intershaft bearing is not required. The reason for withdrawing this change notice for intershaft bearing to be discussed.
Sl. No.
Recommendation
Activity / Manufacturing
Remarks
9
(Ref. 1.16 Proto col)
To revise torque values for Inter Rotor Bearing races. (Existing Torque Value on outer race : 5 +0.5 kgf m Final Existing Torque Value on inner race : 50 +10 kgf m Final)
As per OEM letter no. 60/4-691 dated 31.12.13, modification of the document is not required.
10
(Ref. 1.19Proto col)
To introduce better cooling method for Inter rotor bearing by change of oil supply pattern. Remarks : As per DCN -4720, bearing part no. has been changed from 5-272822P2Y to 5-272822P6Y, oil collector rings part no. 104.04.22.068 & 104.04.22.073 has been cancelled and replaced by new part no. 104.04.22.087 & 104.04.22.086 respectively. Drawings & technology for both the new parts are not available. On LPT Nose, part no. 104.04.22.063, angular drilling carried out on bearing dimension has been cancelled. New TR added for ensuring the fitting diameter after heat treatment. For oil collector part no. 104.04.00.030, diameter of jet changed from dia. 1.85 to dia. 2.04mm.
Ref .: DCN No. -4719, 4720, -4721, -4722, 4723, -4724, -4729, -4730
As per OEM letter no. 60/4-691 dated 31.12.13, technological change notice will be forwarded in Feb14.
CLARIFICATION:
1.Whether these change notices to be carried out for Overhaul or not? If required, the detail technology to be accessed & if already in vogue, the process to be witnessed. Further commitment for implementation of the change notice for both mfg. & ROH programme to be obtained. 2. Whether any change to be carried out for HPT nose for flow of oil. 3. The total flow increased to 12.114 ltr/min. But the rig no. EY-700 being used for measuring flow is having max. capacity of 13 ltr/min. Whether any other / alternate Rig is being used at OEM for measuring the flow. 4. What is the type of change (material, dimension) in post- mod bearing. What is the salvage method for existing pre mod bearings. 5. Date of incorporation of the change notice for Phase-III engines to be supplied to HAL, Koraput. 6. To provide test result of engine where the said change notice had been implemented at OEM.
Introduce spectral method of vibration diagnostics during first test on Test Bed.
Feb2014
ADDITIONAL POINTS
12
OVERHAUL POINTS
SL
1
BRIEF POINTS
Crack on compensating holes of HPT NGV Part no. : 104.04.03.060/060-01 Book-13, Sub-section : 072.50.01 Shop no. : 615
104.16.16.060 External Flap, Shop no. : 609 Book no. : 26, Part no. : 2 Sub-section : 072.55.04 T.K. No. : 432, Page : 414/1 Wire Stem mesh breakage Detail Part number : 11CH-1 NA Part Number : 96.10.10.000 Album no : A-05107 OHT-A31-023 Shop no. : 614
13
MANUFACTURING POINTS
SL
1
BRIEF POINTS
Dimensional difference between measurement before and after heat treatment operation on HPT disc, LPT nose, LPT disc HPT Disc, 104.04.02.008, A-01337, Inv No. 8189 LPT Disc, 104.04.22.028, A-01354, Inv No. 7328 LPT Nose, 104.04.22.063, A-01360, Inv. No. 7647 Shop no. : 610 96.01.32.140/140-01 A-00321, Inv No. 5507 96.01.32.150/150-01/150-02 A-00322, Inv No. 5508 96.01.32.160/160-01/160-02 A-00323, Inv No. 5509 Shop no. : 615 Non-uniform nitriding depth during ion-nitriding process of part no. 104.06.30.008-1 (Gear), Album no. : A-06390, Part no. 104.06.30.013 (Roller), Album no. : A-06390, 104.01.31.018 (Quill shaft), Album no. : A-06243 Shop no. : 603
As per recommendation given by OEM specialist, before brazing of sectors spot tack welding on joints of blades on upper and lower platform are to be carried out in Glove chamber. Whether the same practice is being followed at OEM before brazing operation.
While carrying out ion-nitriding process on part nos. 104.06.30.008-1 (Gear), 104.06.30.013 (Roller), 104.01.31.018 (Quill shaft), non-uniform nitriding depth had been observed on the parts (please refer letter no. HAL/KPT/UPP/124/2/2013/ 920 dated 26.12.13). It is requested to clarify the following points : The reason for increase / non-uniformity of ion nitrding layers. Study of the ion nitriding process and rectification if any to be carried out during the process. Please forward the programme details as mentioned in the technology
14