ACCOUNTING SECTION
DISBURSEMENT REQUIREMENTS
FMR
Transfer 2 SB-Resolution Re: Authority by Mayor to enter into MOA with DA 3 Memorandum of Agreement (Duly Notarized) 4 Technical Requirements: (Note 1) 4.1 Project Proposal ** 4.2 Program of Work (Infra) 4.3 Detailed Estimate (Infra) Note: 4.4 Location Map
N/A N/A
1st Tranche Fund Transfer (50% of MOA) Local Government Unit (LGU): 4.5 Detailed Engineering Design / Plan and Specification (Infra)
4.6
Detailed Technical Description/Design of the Project (Non-Infra) 4.7 LGU Certification that all Right of Way has been settled (for Road Opening) 4.8 Terms of Reference 4.9 Procurement Plan 4.10 Work and Financial Plan 4.11 Pictorial Documentations of Project Location 4.12 Pre-Implementation Pictorial Documentations and every 50 meter intervals
LGU-Equity 5.2 Certificate of Availability of LGUCounterpart (Signed by Budget, Treasurer, Accountant and Mayor)
5.3 Certificate from Government Bank that the LGU has opened a Special Trust Account (STA) for the GPBP Project 5.4 Certificate of Deposit of LGU-Equity (By
Post-Audited Liquidation Report of Previous releases (if any) - per COA Circular No.94-013 Attachments: 6.1 Liquidation Report 6.2 Credit Notice 6.3 COA-TAS Inspection Report 6.4 Certified True Copy of the Following: 6.4.1 Disbursement Voucher 6.4.2 Official Receipt Issued by the Contractor 6.4.3 Journal Entry Voucher 6.4.4 BIR Remittances documents
N/A
DA-RFO 5: 7 Validation Report by DA-Technical Team(RAED) 8 DA-GPBP Team re: the feasibility of the project
N/A
Note 1: 1. Original Copy 2. Signed by the Local Chief Executive 3. Signed and sealed by a Licensed Agricultural Engineer (RA 8559) 4. Must be endorsed by 3 CSO Representatives
Organic Agriculture
GPBP FUND TRANSFER CATEGORY PARTICULARS 6 Proof of ownership of the Land 7 Attestation or letter signifying that the lot shall be dedicated for sole use as an organic farm and shall not be converted to any other purposes within five (5) years from its establishment 8 Detailed Engineering Design/Plan and Specification-For INFRA ONLY ** 9 Program of Work / Cost Estimate (signed and sealed by a Licensed Agricultural Engineer) - For INFRA ONLY ** 10 Detailed Technical design (For Non-Infra) 11 Work and Financial Plan of the Project (For Non-Infra)
Note: * *Must be signed and sealed by a Licensed Agricultural Engineer.
Organic Agriculture
Organic Agriculture
opened a Special Trust Account (STA) for the GPBP Project 17 Certificate of Deposit of LGU-Equity (By tranches or Full Deposit)
18 APP/PPMP
releases (if any) - per COA Circular No.94-013 Attachments: 19.1 Liquidation Report 19.2 Credit Notice 19.3 COA-TAS Inspection Report (If Infra) 19.4 Certified True Copy of the Following: 19.4.1 Disbursement Voucher 19.4.2 Official Receipt Issued by the contractor 19.4.3 Journal Entry Voucher 19.4.4 BIR Remittances documents
Organic Agriculture
CY-2014 GPB-ORGANIC
SAMPLE # 1
CORRECT CERTIFICATE
Name of Local Govt. Unit
______
_______
(GPBP)
___________
LGU Income Class Highly Urbanized Cities All other cities 1st to 3rd class municipalities
Counterpart Requirement 30% of project cost 20% of project cost 15% of project cost
5% of project cost
STATUS OF FUND TRANSFERS As of December 31, 2013 Balances of Unliquidated Fund Transfers Released in CY 2012 Released in CY 2013 TOTAL and PY's ONLY
LGUs
4,538,822.27 194,227.28 850,000.00 510,500.00 550,090.84 500,000.00 520,427.00 300,000.00 950,000.00 250,000.00 1,350,000.00 6,076,000.00
4,538,822.27 194,227.28 850,000.00 510,500.00 550,090.84 6,576,000.00 520,427.00 300,000.00 950,000.00 250,000.00 1,350,000.00
STATUS OF FUND TRANSFERS As of December 31, 2013 Balances of Unliquidated Fund Transfers Released in CY 2012 Released in CY 2013 TOTAL and PY's ONLY 182,188.94 182,188.94 7,448,000.00 7,448,000.00 100,000.00 100,000.00
LGUs 12. Milagros, Masbate 13. Mobo, Masbate 14. San Fernando, Masbate 15. San Pascual, Masbate 16. Uson, Masbate GRAND TOTAL
9,556.36
100,000.00 980,000.00
14,604,000.00
109,556.36 980,000.00
25,409,812.69
10,805,812.69