TEAM 2 GBI GOLD

MOHD RIZALWONG KON BEE BU TENG CHENG CLARENCE CHIN

ROZMAN MUSA AU CHONG HUN TAN KEAT EE

Project Background
The Project is a 11 Storey Faculty of Built Environment, Lot 1520, Jalan Lingkungan Budi, University Malaya, housing a Library, Auditorium, Indoor car park, Class rooms, Admin Office, Lecturer rooms, and studios pertains to Architectural, Real Estate Management, Building Surveying & Quantity Surveying Studios. Land area 12,046 SQ.M Gross Floor area 20,619 SQ.M Nett Floor area 11,510 SQ.M

Why Green?
2005 Survey by Turner Construction Company on 665 green schools Building Occupants on the Benefits of Green School: Improved Community image, 87 percent Ability to attract and retain teachers, 74 percent Reduced Student adsenteeism, 72 percent Improved Student performance, 71 percent Lower 20-year operating costs, 73 percent

There is no reason not to go GREEN

Assesment Criteria Overall Points Score

Target Rating
Baseline score | 21 POINTS GBI target score | 78 POINTS (GOLD)

GBI Score 0

Try Again 21

Certified 49 50 65 66

Silver 75 76

Gold

Platinum 85 86 100

BASELINE SCORING

TARGETED SCORING

GBI Gold Rating Summary


PART ITEM MAX POINTS BASELINE MS 1525 TARGET COST (RM)

1,504,908 1 2 3 4 5 Energy Efficiency Indoor Environmental Quality Sustainable Site Planning & Management Material & Resources Water Efficiency 35 21 16 11 10 3 9 7 2 0 5 9 7 2 0 27 182,500 17 21,780 14 10,000 7 32,000 6

Innovation
Total Score

7
100

0
21

0
23

7
78

421,976
2,173,164

PART 1

Part 1 - Energy Efficiency


PART ITEM POINTS BASE MS 1525 TARGET COST

EE1

Minimum EE Performance

1 3

0 1

1 1

1 3

302,408 40,000

EE2 Lighting Zoning

EE3 Electrical Sub-metering


EE4 Renewable Energy

1
5

0
0

1
0

1
4

7,500
450,000

EE5 Advanced EE Performance - BEI


1 EE6 Enhanced Commissioning EE7 Post Occupancy Commissioning

15
3 2 2 3

0
0 0 0 2 3

0
0 0 0 2 5

8
3 2 2 3 27

585,000
70,000 30,000 20,000 1,504,908

EE8 EE Verification EE9 Sustainable Maintenance TOTAL

35

ENERGY EFFICIENCY

EE 1 - Minimum EE performance
AREA m2

Baseline
U-value w/m2degC a 0.4 0.4 0.4 0.4 WWR 0.25 0.14 0.49 0.48 T OTTV TT A x OTTV AREA m2

DESCRIPTION 1. WALL OTTV = 15a(1-WWR)Uw 1.1 SE Elevation - Front Elev 1.2 NW Elevation - Back Elev 1.3 SW Elevation - Left Elev 1.4 NE Elevation - Right Elev Sub-Total Wall OTTV 2. WINDOW OTTV = 6(WWR)Uf 2.1 SE Elevation - Front Elev 2.2 NW Elevation - Back Elev 2.3 SW Elevation - Left Elev 2.4 NE Elevation - Right Elev Sub-Total Window OTTV

1548 919 2711 2865

2.87 2.87 2.87 2.87

12.92 14.81 8.78 8.95

19,992.42 13,609.65 23,808.54 25,654.36 83,064.98

1161 790 1383 1490 4824

1548 919 2711 2865

5.6 5.6 5.6 5.6

0.25 0.14 0.49 0.48

8.40 4.70 16.46 16.13

13,003.20 4,322.98 44,633.90 46,206.72 108,166.80

387 129 1328 1375 3219

3. WINDOW SOLAR GAIN = 194xCFxWWRxSC 3.1 SE Elevation - Front Elev 1548 3.2 NW Elevation - Back Elev 919 3.3 SW Elevation - Left Elev 2711 3.4 NE Elevation - Right Elev 2865 Sub-Total Window Solar Gain TOTAL OTTV

CF 1.13 0.9 0.9 1.09

SC 0.61 0.61 0.4392 0.4209

0.25 0.14 0.49 0.48

33.43 14.91 37.58 42.72

51,751.27 13,703.06 101,866.68 122,397.63 289,718.64 480,950.42

387 129 1328 1375 8043

AVERAGE OTTV

59.80

ENERGY EFFICIENCY

EE 1 - Minimum EE performance
DESCRIPTION
AREA m2

MS 1525
U-value w/m2degC T OTTV TT A x OTTV AREA m2

1. WALL OTTV = 15a(1-WWR)Uw 1.1 SE Elevation - Front Elev 1.2 NW Elevation - Back Elev 1.3 SW Elevation - Left Elev 1.4 NE Elevation - Right Elev Sub-Total Wall OTTV 2. WINDOW OTTV = 6(WWR)Uf 2.1 SE Elevation - Front Elev 2.2 NW Elevation - Back Elev 2.3 SW Elevation - Left Elev 2.4 NE Elevation - Right Elev Sub-Total Window OTTV

1548 919 2711 2865

0.8 0.8 0.8 0.8

a 0.4 0.4 0.4 0.4

WWR 0.25 0.14 0.49 0.48

3.60 4.13 2.45 2.50

5572.80 3793.63 6636.53 7151.04 23154.00 10681.20 3551.02 36663.56 37955.52 88851.30

1161 790 1383 1490 4824 387 129 1328 1375 3219 387 129 1328 1375 8043

1548.00 919.00 2711.00 2865.00

4.6 4.6 4.6 4.6 CF 1.13 0.9 0.9 1.09 SC 0.61 0.61 0.44 0.42

0.25 0.14 0.49 0.48

6.90 3.86 13.52 13.25

3. WINDOW SOLAR GAIN = 194xCFxWWRxSC 3.1 SE Elevation - Front Elev 1548.00 3.2 NW Elevation - Back Elev 919.00 3.3 SW Elevation - Left Elev 2711.00 3.4 NE Elevation - Right Elev 2865.00 Sub-Total Window Solar Gain TOTAL OTTV

0.25 0.14 0.49 0.48

33.43 51751.27 14.91 13703.06 37.64 102052.23 42.63 122135.91 289642.47 401647.77

AVERAGE OTTV

49.94

ENERGY EFFICIENCY

EE 1 - Minimum EE performance
DESCRIPTION 1. WALL OTTV = 15a(1-WWR)Uw 1.1 SE Elevation - Front Elev 1.2 NW Elevation - Back Elev 1.3 SW Elevation - Left Elev 1.4 NE Elevation - Right Elev Sub-Total Wall OTTV 2. WINDOW OTTV = 6(WWR)Uf 2.1 SE Elevation - Front Elev 2.2 NW Elevation - Back Elev 2.3 SW Elevation - Left Elev 2.4 NE Elevation - Right Elev Sub-Total Window OTTV 3. WINDOW SOLAR GAIN = 194xCFxWWRxSC 3.1 SE Elevation - Front Elev 3.2 NW Elevation - Back Elev 3.3 SW Elevation - Left Elev 3.4 NE Elevation - Right Elev Sub-Total Window Solar Gain TOTAL OTTV AREA m2 1548 919 2711 2865

Target
U-value w/m2deg C 0.8 0.8 0.8 0.8 a 0.4 0.4 0.4 0.4 WWR 0.25 0.14 0.49 0.48 T OTTV 3.60 4.13 2.45 2.50 TT A x OTTV 5572.80 3793.63 6636.53 7151.04 23154.00 4179.60 1389.53 14346.61 14852.16 34767.90 AREA m2 1161 790 1383 1490 4824 387 129 1328 1375 3219

1548 919 2711 2865

1.8 1.8 1.8 1.8

0.25 0.14 0.49 0.48

2.70 1.51 5.29 5.18

1548 919 2711 2865

CF 1.13 0.9 0.9 1.09

SC 0.4 0.4 0.4 0.4

0.25 0.14 0.49 0.48

21.92 9.78 34.22 40.60

33935.26 8985.61 92774.76 116319.92 252015.54 309937.44

387 129 1328 1375 8043

AVERAGE OTTV

38.54

ENERGY EFFICIENCY (EE) EE1 MINIMUM EE PERFORMANCE

ROOF - U VALUE
Original Design Revised Design U Value with insulation to roof slab or underneath metal sheet (W/m2K) 0.537 0.235 2.762 0.537

Type

Description

U Value (W/m2K)

Area 1
Area 2 Area 3 Area 4

Metal Sheet Roof above Service Area


Auditorium Flat Roof At Ruang Bacaan L9-roof deck

1.381 3.205 2.762 2.762

Existing Weighted Roof U-Value is 1.89 W/m2K Improved Roof U Value with Insulation Layer to Underneath of the Metal Sheet and the concrete slab, improved U Value is 0.50 W/m2K

Therefore, comply to MS 1525:2007, with heavy duty (Above 50 kg/m2) Maximum Allowable U Value for Roof of 0.6 W/m2K

ENERGY EFFICIENCY

EE 1 - Minimum EE performance

Target

EMS is provided with the following features: Maximum Demand Limiting Programme Monitoring of Electrical and Water usage

ENERGY EFFICIENCY

EE 1 - Minimum EE performance

Factors Leading to Reduction of Air Conditioning Load


Improved Envelope Performance Reduced Plug Load Reduced Lighting Load Use of CO2 Sensors to Regulate Outdoor Air Increased Design Temperature
Base Building OTTV (W/mK) Plug Load (W/m) Lighting Load (W/m) CO2 Sensors to regulate Outdoor Air Design Temperature (C) 60 15 15 No 23 Proposed Building 38 8 8 Yes 24

ENERGY EFFICIENCY EE 1 - Minimum EE performance

High Efficiency Air Conditioning System


Chilled Water System High Efficiency Chiller Variable Speed AHU VAV Boxes VSD Fans for Cooling Tower

Air Conditioning System Cost Base Building Proposed Peak Load (RM) 580 420 RM/RT 5500 7500 Total Cost (RM) 3,190,000.00 3,150,000.00
Proposed Building 420 RT 3 nos. of 150RT 0.62 Multi Zone c/w VAV Constant Speed AHU boxes Constant Speed Fan Variable Speed Fan Motor Motor 3.52 4.13 Base Building 580 RT 2 nos.of 300RT 0.75

Total Peak Load Chiller Selection Chiller kW/RT AHU Cooling Tower Total System COP

No additional cost for higher efficiency system due to the reduced cooling load

ENERGY EFFICIENCY EE 1 - Minimum EE performance

Part Load Usage Consideration


Use of VSD AHU c/w VAV Boxes Multiple Compressors Chillers

Minimum Load for Chiller System to Operate Minimum Operating Load for Chiller Scenario 1 Scenario 2 Scenario 3 Scenario 4

20% of 150RT Auditorium L8 Office Half Lev 9 and Half Level 10 Half Level 8 Office and Half Level 9

30RT 40RT 50RT 50RT 50RT

ENERGY EFFICIENCY EE 2 - Lighting Zone

Optimization of Lighting with Flexible Lighting Control


Photocell sensors at perimeter zones particularly at areas with Daylight Factor between 1 to 3% Combined motion sensor lighting switch at meeting rooms Lighting circuit per zone less than 100 m2 Clear Labeling of lighting circuits

Photocell sensor at perimeter zones

Motion sensor lighting switch for meeting rooms

ENERGY EFFICIENCY EE 3 Electrical Sub-metering

Separate metering provided for Major Load Centre exceeding 100 KVA such as :
Lighting Load Air-conditioning and Mechanical Ventilation System Plug Load

Separate electricity metering to be linked to EMS

ENERGY EFFICIENCY EE 4 - Renewable Energy STRATEGY To install PV modules on roof top above cooling tower area PV Required = 20 kWp (=1.5% of total electricity consumption) Power generated by PV modules = 1300 kWH/KWp/yr x 20 kWp = 26,000 kWH/yr Area Required = 20 kWp x 13 sqm/kWp = 260 sqm ADDITIONAL COST Cost of PV modules per kWp = RM22,500.00 Total cost for PV modules = RM22,500 x 20kWp = RM450,000.00

ENERGY EFFICIENCY EE 5 - Advanced EE Performance


Building Specification for BEI Calculation Base Building Building Total AC Floor Area (m) OTTV (W/m) Type of Glazing U Value of Glazing (W/mK) SC of Glazing Type of Wall U Value of Wall (W/mK) Electrical Lighting Load during AC hours (W/m) Plug Load during AC hours (W/m) Elevators and Escalators (kW/building) Hydraulic systems (kW/building) ACMV System Design Temperature (C) Design Relative Humidity (%) Total Chiller Cooling Load Btu/hr/sq.ft Type of System No of Chillers Minimum Part Load for Chiller Refrigerant Cooling Tower Air System AHU Average Fan Total Static Pressure (Pa) Carbon Dioxide Monitoring and Control ACMV Consumption Chiller COP Chiller Efficiency (kW/RT) Cooling Tower Consumption (kW/RT) Chilled Water Pump Consumption (kW/RT) Condenser Water Pump Consumption (kW/RT) AHU consumption (kW/RT) Total kW/RT AC System COP BEI Calculated based on E-Quest (2354 hours) BEI (Corrected based on 2700 hours) Power Generated from PV per year (kWhr) Nett BEI 11529 59.80 Solar Reflective Glass 5.60 0.61 Brick Wall 2.87 Proposed GBI Gold 11529 38.54 Double glazed low-e 1.8 0.4 Lightweight Block Wall 0.8

The BEI is calculated using Dynamic Load Simulation Software E-Quest Total AC 2354 hours per year BEI corrected to 2700 hours BEI is 120kWH/m2/year

15 15 60 15

8 8 60 15

23 55 580 56 Water Cooled Chiller 2 nos of 300RT Screw Chiller 20% R134a 2 nos. of 360RT Constant Speed AHU Airfoil blade 600 Not provided

24 55 411 40 Water Cooled Chiller 3 nos of 150RT Screw Chiller 20% R134a 3 nos of 200RT Variable Speed AHU with VAV boxes Airfoil blade c/w VSD 500 Provided

5.02 0.70 0.025 0.050 0.064 0.160 0.999 3.520 175 201 0 201

5.67 0.62 0.018 0.050 0.064 0.100 0.852 4.127 100 115 26000 112

ENERGY EFFICIENCY EE 5 - Advanced EE Performance

The BEI is counterchecked with the BEIT software


Summary of BEI Results Base Building BEIT (2700 hours) E-Quest (2354 hours) E-Quest corrected (2700 hours) 225 175 N/A 201 115 MS 1525 Compliant 211 GBI Gold 121 100

ENERGY EFFICIENCY EE 6 - Enhanced Commissioning

All buildings energy related systems will be

commissioned according to ASHRAE Guideline 02005 to verify that the HVAC systems achieve the owners project requirements. The Commissioning Process will be used to achieve, verify, and document the performance of facilities, systems, and assemblies to ensure that they meet defined objectives and criteria specialist will be appointed at the onset of the design process to verify that comprehensive precommissioning and commissioning is performed for all the building's energy related systems

An independent GBI recognized commissioning

ENERGY EFFICIENCY EE 6 - Enhanced Commissioning

Budget to be included in project cost

ENERGY EFFICIENCY EE 6 - Enhanced Commissioning

Construction Phase

ENERGY EFFICIENCY EE 7 - Post Occupancy Commissioning

Design engineer shall review all tenancy fit-out plans to ensure

original design intent is not compromised and upon completion of the fit-out works, verify and fine-tune the installations to suit least 50% occupancy), the commissioning specialist shall carry out a full post/re-commissioning of the building's energy related systems to verify that their performance is sustained in conjunction with the completed tenancy fit-outs

Within 12 months of practical completion (or earlier if there is at

Verification will be conducted by CS

ENERGY EFFICIENCY EE 8 - EE Verification

Energy Management System will be used to monitor and

analyze energy consumption including reading of sub-meters Limiting program within 12 months of practical completion (or earlier if there is at least 50% occupancy).

EMS will be fully commissioned including Maximum Demand

ENERGY EFFICIENCY EE 9 - Sustainable Maintenance

Three maintenance personnel (50% of permanent building maintenance team ) will be employed to be on-board one (1) to three (3) months before practical completion and to fully participate in the Testing & Commissioning of all building energy services. A designated building maintenance office that is fully equipped with facilities (including tools and instrumentation) and inventory storage will be provided

PART 2

Part 2 - Indoor Environment Quality


PART ITEM POINTS BASE MS 1525 TARGET COST

EQ1 EQ2 EQ3 EQ4 EQ5 EQ6 EQ7 EQ8 EQ9 EQ10 EQ11 EQ12 EQ13 EQ14

Minimum IAQ Performance Environmental Tobacco Smoke (ETS) Control Carbon Dioxide Monitoring and Control Indoor Air Pollutants Mould Prevention Thermal Comfort: Design & Controllability of Systems Air Change Effectiveness Daylighting Daylight Glare Control Electric Lighting Levels High Frequency Ballasts External Views Internal Noise Levels IAQ Before & During Occupancy

1 1 1 2 1 2 1 2 1 1 1 2 1 2 2 21

1 1 0 0 1 1 0 1 0 1 0 1 1 0 0 8

1 1 0 0 1 1 0 1 1 1 0 1 1 0 0 9

1 1 1 2 1 2 0 1 1 1 1 1 1 1 2 17

42,500 40,000 80,000 10,000 10,000 182,500

EQ15 Post Occupancy Comfort Survey & Verification TOTAL

INDOOR ENVIRONMENTAL QUALITY

EQ1 Minimum IAQ Performance

Establish minimum outdoor air requirement based on ASHRAE 62:2007 and UBBL 1984 3rd Schedule

Outdoor Air Requirement Place Auditorium 5 Library Computer Room 5 Lecture Room 1 to 8 5 Studio Ukur 1 Studio Senibina Faculty Meeting Room 10 Lecturer's Room 5

UBBL cfm/pax N/A cfm/pax cfm/seat N/A N/A cfm/pax cfm/pax

ASHRAE 62 5 cfm/seat 5 cfm/pax 10 cfm/pax 7.5 cfm/pax 10 cfm/pax 10 cfm/pax 5 cfm/pax 5 cfm/pax

Selected 5 cfm/seat 5 cfm/pax 10 cfm/pax 7.5 cfm/pax 10 cfm/pax 10 cfm/pax 10 cfm/pax 5 cfm/pax

INDOOR ENVIRONMENTAL QUALITY


EQ2 Environmental Tobacco Smoke (ETS) Control Prohibit smoking in the building, provide no smoking signage in the building Locate exterior designated smoking areas at least 10 m away from entries, outdoor air intake or operable windows

INDOOR ENVIRONMENTAL QUALITY EQ3 Carbon Dioxide Monitoring and Control

To ensure good indoor air quality, Code of Practice on Indoor Air Quality 2005 will be adopted The amount of CO2 will not exceed C1000 ppm for an eighthours time-weighted average Demand Control Ventilation system will be installed to reduce energy consumption when there is low level occupancy CO2 sensors will be installed at all main return points on each floor for continuous monitoring

CO2 Sensor

DDC

Damper Actuator

INDOOR ENVIRONMENTAL QUALITY

EQ4 Indoor Air Pollutants

Provision to use low VOC paint and coating, carpet or flooring throughout the building and encourage to use low VOC adhesive and sealant Use product with no added urea formaldehyde.

INDOOR ENVIRONMENTAL QUALITY

EQ5 Mould Prevention


Architectural Component To prevent rainwater leakage through r c. roof Ensure proper roof detailing and construction Specifies appropriate waterproofing membrane Ensure waterproofing is applied by specialist with warranty Recommend waterproofing admixture to be added to the concrete flat roof as additional measure Ensure the surface to receive waterproofing membrane is properly prepared (i.e. no depression to avoid ponding and all cracks are sealed and rectified before application of waterproofing membrane. Ponding test to be carried out to test the integrity of the roof before and after application of waterproofing constant inspection to be carried out at the roof soffit to detect any sign of leakage during occupancy To prevent water leakage through walls Ensure proper construction of the walls to prevent water seepage by minimizing cracks and porosity of wall such as: To ensure the walls are constructed with quality bricks that comply with minimum compressive strength

INDOOR ENVIRONMENTAL QUALITY

EQ5 Mould Prevention

To prevent water leakage through walls (cont)


Ensure the brick walls are properly dubbed and filled with cement mortar before plastering Ensure adequate bonding ties are provided for brickwork construction To ensure the plaster composition and thickness are correct To wet the walls before plastering to minimize shrinkage cracks Ensure junction of windows/openings and walls are properly sealed

To prevent leakage through floors especially at toilet areas and areas exposed to weather To provide waterproofing to all the wet areas To ensure waterproofing is applied correctly by the specialist

INDOOR ENVIRONMENTAL QUALITY

EQ6 Thermal Comfort

Two design parameters to be considered are; Relevant design temperatures as per AHSRAE 55/MS 1525 Air velocity in the region of 0.15 m/s to 5.5 m/s

INDOOR ENVIRONMENTAL QUALITY

EQ6 Thermal Comfort

Comfort controls for occupants considered; Zoning of perimeter due to higher radiant heat through windows Apply VAV system according to different zoning Limit of VAV airflow to meet design noise level Room thermostat to be located at strategic locations within each zone to achieve comfort conditions

VAV Box

INDOOR ENVIRONMENTAL QUALITY

EQ8 Daylighting

Provide 30% of the NLA has a daylight factor of 1.0% - 3.5%

INDOOR ENVIRONMENTAL QUALITY

EQ9 Daylight Glare Control

Eliminate glare from: Direct SUNLIGHT and maintain workspace LUX less than 2,000 Diffuse SUNLIGHT for occupant-workspace at viewing angles of 15 to 60 from the horizontal at eye level Manual roller blinds will be adopted

INDOOR ENVIRONMENTAL QUALITY

EQ10 Electric Lighting Levels

Design lighting level comply with MS 1525


Lighting lux level simulated with appropriate software

INDOOR ENVIRONMENTAL QUALITY

EQ11 High Frequency Ballasts

High frequency ballasts will be used for all fluorescent lamps The primary advantage of high-frequency fluorescent lighting is the improvement of efficacy relative to lighting systems with 60Hz magnetic ballast High-frequency operation also reduces the possibility of perceptible lamp flicker that is sometimes associated with low-frequency ballast, as the lamp phosphors are refreshed more often

INDOOR ENVIRONMENTAL QUALITY

EQ12 External Views

Allows more than 60% of the NLA has external views through windows Open Plan Concept will be adopted Meeting rooms , store and archive rooms will be located away from windows Low cubicle partition vision glass panels will be used Purpose is to create a pleasant working environment thus higher work productivity

INDOOR ENVIRONMENTAL QUALITY

EQ13 Internal Noise Levels

Establish noise criteria depending on space usage Minimize noise from building services Also consider noise breakout from other sources
Recommended Noise Level Spaces Auditorium Library Lecture Rooms Studios Lecturer's Rooms NC 35 30 35 35 35 dBA 40 40 40 40 40

INDOOR ENVIRONMENTAL QUALITY

EQ13 Internal Noise Levels

Sample Calculation
Summary of Noise NC Glazing STL Lecture Room AHU InDuct Noise Lecture Room AHU Room Wall Lecturer's Rooms AC Unit 35 30 30 N/A dBA 40 31 33 30
Estimated sound pressure for AHU fan End relection Attenuation due to lined duct (6 meter) Attenuation due to lined elbow Power level split from branch to terminals Power level split from main duct to branch duct Sub Total Selected Silencer spec Total for Supply Similar Value for Return Resultant Value A-scale weighting factor Adjusted Spectrum to A scale Total dB Total dB Resultant dBA In-Duct Noise Transmission through Supply Air Duct Frequency (Hz) 500 1000 91 88 -1 -18 -24 -14 -16 -6 -6 -10 42 -18 24 24 27 -3 24 25 31 -10 32 -20 12 12 15 0 15 63 88 -12 -3 -7 -6 -10 50 -10 40 40 43 -26 17 125 88 -8 -3 -7 -6 -10 54 -12 42 42 45 -16 29 29 250 85 -4 -12 -12 -6 -10 41 -15 26 26 29 -9 20 2000 86 -24 -18 -6 -10 28 -19 9 9 12 1 13 17 4000 80 -30 -18 -6 -10 16 -10 6 6 9 1 10 8000 72 -30 -18 -6 -10 8 -2 6 6 9 -1 8 12 18 31 31 dBA 96

Noise Transmission through AHU Room Wall Frequency (Hz) 500 1000 65 59 21 30 44 54 -4 -3 4 0 -3 0 1 0 16 33

AHU Noise after Casing Loss 125 thk brick wall Acoustic Treatment STC 35 Ceiling Form/RA Duct Correction Total Value outside AHU Room A-scale weighting factor Adjusted Spectrum to A scale Total dB Total dB Resultant dBA

63 73 10 17 -2 48 -26 22

125 73 15 12 -2 48 -16 32 32

250 68 18 29 -4 25 -9 16

2000 57 33 39 -5 0 1 1 4

4000 40 33 46 -5 0 1 1

8000 43 33 46 -5 0 -1 -1 3 6 33

dBA 66

33

INDOOR ENVIRONMENTAL QUALITY

EQ14 IAQ Before & After Occupancy

A building flush-out will be performed at the end of the construction prior to occupancy to reduce indoor air quality contamination All ventilation air filters will be changed after the flush-out Pressure sensor to detect filter blockage Purging to eliminate bad odors and improve air quality especially for building space that does not have adequate openable windows Ventilation of the encapsulation, hood or extraction type should be provided so that the spread of contaminants is prevented Building materials and surface finishes should not contain any substances that emit chemicals, bacteria or fungi

INDOOR ENVIRONMENTAL QUALITY

EQ15 Post Occupancy Survey : Verification

A post-occupancy comfort survey of building occupants will be conducted within 12 months after occupancy/building completion. The survey will be collected by a neutral third party and respondents are to be remained anonymous. Measured data will be compared to ASHRAE STD 62.12007, STD 55-2004, MS 1525-2007 and Code of Practice on Indoor Air Quality 2005 The survey will cover the following: Lighting comfort Temperature comfort Acoustical comfort Ventilation comfort Day lighting/views comfort Perceived productivity

INDOOR ENVIRONMENTAL QUALITY

EQ15 Post Occupancy Survey : Verification

Preliminary Draft

PART 3

Part 3 - Site Planning and Management


PART ITEM POINTS BASELINE MS 1525 TARGET COST

SM1 Site Selection SM2 Brownfield Redevelopment SM3 Development Density & Community Connectivity SM4 Environment Management SM5 Earthworks - Construction Activity Pollution Control SM6 QLASSIC SM7 Workers' Site Amenities SM8 Public Transportation Access SM9 Green Vehicle Priority SM10 Parking Capacity SM11 Stormwater Design - Quantity & Quality Control SM12 Greenery & Roof SM13 Building User Manual TOTAL

1 1 2 2 1 1 1 1 1 1 1 2 1 16

1 0 1 1 1 0 1 1 0 0 1 0 0 7

1 0 1 1 1 0 1 1 0 0 1 0 0 7

1 0 1 2 1 1 1 1 1 1 1 2 1 14

21,780 21,780

SUSTAINABLE SITE PLANNING & MANAGEMENT SM1 Site Selection

Site is not within farmland, forest reserve, wetlands, Mean High Water Spring and 20m lake, river and stream.

SUSTAINABLE SITE PLANNING & MANAGEMENT SM3 Development Density & Community Connectivity

Facilities Identified within 1km radius


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Bookshop Post Office Convenience Store Bank Laundry Internet Caf Hospital Park Gymnasium Mosque Library Hair Dressing Saloon Travel Agent

SUSTAINABLE SITE PLANNING & MANAGEMENT SM4 Environment Management

A. Conservation On previously developed or graded site, restore or protect a minimum of 50% of the site area (excluding the building footprint) with native or adaptive vegetation. Native or adaptive plants are plants indigenous to a locality or cultivars of native plants that are adapted to the local climate and are not considered invasive species or noxious weeds. Applicable to landscaping on rooftops and roof gardens so long as the plans meet the definition of native or adaptive vegetation. Total Site Area = 12,046 m2 Building Footprint = 3,334 m2 Balance area = 8,712m2 50% of balance area = 8,712/ 2 = 4,356m2 Existing Hard & Soft Landscape Area Ground Level = 4,659 m2 Roof garden Level = 336 m2

SUSTAINABLE SITE PLANNING & MANAGEMENT SM4 Environment Management

SUSTAINABLE SITE PLANNING & MANAGEMENT SM4 Environment Management

B. Open Space Reduce by 25%, the development footprint (defined as the total area of the building footprint, hardscape, access road and parking) and/or provide vegetated open space within the project boundary to exceed the local zonings open space requirement for the site by 25% Total site area = 12,046m2 Assuming10% open space requirement = 1,205m2 Additional 25% open space = 1,205 X 0.25

= 301m2 Additional vegetated open space by converting car park premix surfaces to grass crete pavers: = 990m2 990/1,205 = 82% > 25% Compliance to SM 4 Part B (Open Space)

SUSTAINABLE SITE PLANNING & MANAGEMENT SM4 Environment Management

SUSTAINABLE SITE PLANNING & MANAGEMENT SM5 - EARTHWORKS CONSTRUCTION ACTIVITY POLLUTION CONTROL

During Construction, disruption to the natural hydrology will occur and they can be mitigated by due diligence site planning and storm water design and with the provision of : Implement an Erosion & Sediment Control (ESC) Plan Proper site management of surface water run-off treatment. Increasing or improving ground surface infiltration. Elimination of contamination sources. Proper handling of contaminants and disposal. Removing pollutants from storm water run-off. Provision of silt-traps prior to final discharge to exist drains and waterways. Maintain as much as possible the existing vegetation during conceptual design.

SUSTAINABLE SITE PLANNING & MANAGEMENT


SM5 Earthworks Construction Activity Pollution Control

SUSTAINABLE SITE PLANNING & MANAGEMENT SM6 Qlassic

Subscribe to independent method to assess and evaluate quality of workmanship of building project based on CIDBs CIS 7: Quality Assessment System for Building Construction Work (QLASSIC) to achieve quality of workmanship Must achieve a minimum score of 70%

SUSTAINABLE SITE PLANNING & MANAGEMENT SM7 Workers Site Amenities

Reduce pollution from construction activities by controlling pollution from waste and rubbish from workers. Create and implement a Site Amenities Plan for all construction workers associated with the project. Provide proper accommodation in site completed with electric and water supply, septic tank to treat sewer water, waste collection centre and recycle bins. Provide first aid box and sport facilities such as sepak takraw and straightly no open burning in site.

SUSTAINABLE SITE PLANNING & MANAGEMENT SM8 Public Transportation Access

Bus Stop 500m from site Buses travels within and beyond campus

SUSTAINABLE SITE PLANNING & MANAGEMENT SM9 Green Vehicle Priority

Provide preferred parking for low-emitting and fuel efficient vehicles for 5% of Full-Time Equivalent

SUSTAINABLE SITE PLANNING & MANAGEMENT SM10 Parking Capacity

Provide preferred parking for carpools for 5% of the total provided parking spaces. Provided 148 nos. 5% of 148 7 nos.

SUSTAINABLE SITE PLANNING & MANAGEMENT


SM11 Stormwater Design Quantity & Quality Control

Disruption to the natural hydrology can be mitigated by diligence site planning and storm water design by:

Maintain as much as possible the existing vegetation during conceptual design.


To ensure storm water management design and provision complies to MASMA. Using pervious paving block for external car parks to improve impervious cover and improving ground surface infiltration

SUSTAINABLE SITE PLANNING & MANAGEMENT SM12 Greenery & Roof

Part A - Hardscape & Greenery Application Provide any combination of the following strategies for 50% of the site hardscape (including sidewalks, plazas and parking lots) Shade (within 5 years of occupancy). Paving materials with Solar Reflectance Index (SRI) of at least 29. Open grid pavement system

SUSTAINABLE SITE PLANNING & MANAGEMENT SM12 Greenery & Roof

Part B Roof Application Solar Reflectance Index (SRI) for lowsloped roof < 2:12 78

SUSTAINABLE SITE PLANNING & MANAGEMENT SM13 Building User Manual

Provide Building user manual which documents passive & active feature that should not be downgraded

PART 4

Part 4 - Materials and Resources


PART CRITERI ITEM A POINTS BASELINE MS 1525 TARGET COST

MR1 Materials reuse and selection MR2 Recycled content materials

2 2

0 0

0 0

1 1

MR3 Regional Materials


MR4 Sustainable Timber 4 MR5 Storage & Collection of recyclables

1
1 1

1
0 1

1
0 1

1
1 1

10,000

MR6 Construction waste management


MR7 Refrigerants & Green Agents TOTAL

2
2 11

0
0 2

0
0 2

1
1 7

10,000

MATERIALS & RESOURCES MR1 Materials Reuse & Selection

Reuse building materials and products to reduce demand for virgin materials and reduce creation of waste. Reused products/materials constitutes 2% of the projects total material cost value.

MATERIALS & RESOURCES MR2 Recycled Content Materials

Increase demand for building products that incorporate recycled content materials in their production Use of materials with recycled content is such that the sum of post-consumer recycled plus one-half of the pre-consumer content constitutes 10% (based on cost) of the total value of the materials in the project

MATERIALS & RESOURCES MR3 Regional Materials

The map indicates that The


Whole of Peninsular Malaysia, Singapore, and part of Sumatra and Southern Thailand are encompassed within 500 km from the project site. There shall be no problems at all, and very obvious that the more than 20% of the building material could be obtained within this region.

MATERIALS & RESOURCES MR4 Sustainable Timber

Encourage environmentally responsible forest management Where 50% of wood-based materials and products used are certified
STRATEGIES All timber doors used in the building to be of MTCC and FSC certified wood products

MATERIALS & RESOURCES MR5 Storage & Collection of Recyclables

Facilitate reduction of waste generated during construction and during building occupancy that is hauled and disposed of in landfills STRATEGIES

During Construction Provide dedicated storage area for collection of nonhazardous materials for recycling
During Building Occupancy Provide permanent recycle bins on each floors except for mechanical and car park floors and also at Refuse Collection Centre

ADDITIONAL COST

50 recycle bins x RM 150/u 2 bins at Refuse Chamber Total

= RM 7,500.00 = RM 2,500.00 = RM10,000.00

MATERIALS & RESOURCES MR6 Construction Waste Management Develop and implement a construction waste management plan that, as a minimum identifies the materials to be diverted from disposal regardless or whether the materials will be sorted on site or comingled. Quantify by measuring total truck loads of waste sent for disposal Recycle and/or salvage 50% volume of non-hazardous construction debris STRATEGIES
Specify in Tender Documents Set up Construction Waste Sorting Guidelines Identify relevant debris/ waste storage area Record waste sent for disposal

MATERIALS & RESOURCES MR7 Refrigerants & Clean Agents

Non ozone depleting gas not limited to ACMV system but also other systems such as fire suppression system. Zero ozone depleting gas as follow; R134a HFC refrigerant gas R410a HFC refrigerant gas, if any Fire suppression system such as Argonite

PART 5

Part 5 - Water Efficiency


PART ITEM POINTS BASELINE MS 1525 TARGET COST

WE1 Rainwater Harvesting WE2 Water Recycling WE3 5 Water Efficient - Irrigation/ Landscaping Metering & Leak Detection System Total

2 2 2

0 0 0

0 0 0

1 0 2

2,000 -

WE4 Water Efficient Fittings


WE5

2
2 10

0
0 0

0
0 0

1
2 6

25,000
5,000 32,000

WATER EFFICIENCY WE1 Rainwater Harvesting

Encourage rainwater harvesting that will lead to reduction in potable water consumption.

RAIN FALL COLLECTED YEARLY Rainfall (mm) Runoff Coe. Roof Area (m2) Q (l) Diverted Nett Colelcted

2,495.60

0.80

2,279.00

4,549,977.92

54,696.

4,495,281.92

Total harvested per year = = =

4,549,978 litre 1,000,995 gal 4,550 m

WATER EFFICIENCY WE1 Rainwater Harvesting

Assumption: 115 Staffs at 20 Gal per day, and 1200 Students at 10 Gal per day Estimated Daily Demand = 14,300 gal per day Estimated yearly at 36 weeks @ 5 days week = 2,574,057 gal per year 17% Demand = 437,642 gal or 1,989 m3 Existing Design provided with 2 Rain Water Harvesting Tank at 1,500 gal each Provide additional Rainwater Harvesting Tank at 1,500 gal per tank, and capable of harvesting 1,989 m3 of water which is replacing 17% of portable water

THEREFORE, Harvested and Stored for irrigation use >15% of Portable Water Demand, and Points Earned = 1

WATER EFFICIENCY

WE1 Rainwater Harvesting

Fully Engineered System to be used such as:


Diverter fittings with built in filter Floating Strainer

Fittings selected to have independent verified testing results

WATER EFFICIENCY WE 3 - WATER EFFICIENT LANDSCAPING


Irrigation Demand for the Proposed Development Total Tress Turf Area Grasscrete
Landscape Type

127 1835.4 990


Area (sf)

nos m2 m2 (turf area assume 40%)


Species Factor (Ks) Densit y Factor (Kd) Microclim ate Factor (Kmc) KL ETo ETL IE TPWA (Gal)

Trees (No.) Turf

127 19,756

( Assume 15 litre/tree/day) 0.70 1.00 1.20 0.84 8.525 7.16 Sprinkler

152,953.15 226,357.06 379,310.20

Total Plant Water Applied

Total water required for irrigation= 379,310 gal or 1,724 m3 per year Provide 3 Rainwater tank capturing 1,989 m3 per year, One additional Tank Cost RM 2,000.00 Therefore, No requirement of Portable Water required, GBI Points Earned 2 Points

WATER EFFICIENCY WE4 Water Efficient Fittings

Encourage reduction in portable water consumption through use of efficient devices


STRATEGY Reduce annual portable water consumption by 30 % via : 1. Dual flush WCs 2. Auto sensor taps to all public washrooms 3. Low capacity flushing cisterns 4. Self closing delayed action tap

Sink or Bib Taps:

Cotto Art Ct 183 (3.16L/min)

Basin Taps & Mixers:

Docol Benefits (1.60L/min)

Showerheads:
Grohe 28368000 (3.97L/min)

WATER EFFICIENCY
WE5 Metering & Leak Detection System

Locate digital sub-meter at major water usage area to record usage and monitor leakage All sub-meters linked back to EMS for monitoring and detection of leakage

AC Make Up Tank

Toilet

Irrigation

Cafeteria

PART 6

Part 6 - Innovation
PART ITEM POINTS BASE MS 1525 TARGET COST

IN INNOVATION IN1 6 Innovation in Design & Environmental Design Initiatives 6 0 1 6 221,976

IN2 Green Building Index Accredited Facilitator

200,000

TOTAL

421,976

INNOVATION IN1 Innovation in Design & Environmental Design Initiatives

Condensate water recovery (accounting for at least 50% of total AHUs/FCUs for use as cooling tower make up water etc
STRATEGY To recover condensate water into a/c make up tank

Estimation of Condensate water generation.


Latent heat = mass of water x heat of vaporisation H=mxL Base on 1445kW(411RT) cooling load, 20% goes to latent heat. The heat of vaporisation is 2438kJ/kg, to condense vapor into water.

Hence, the generated condensate water is estimated to be Q (l/s) = 1445kW x 0.20 / 2438kJ/kg x 1 L/kg = 0.12 L/s
Daily condensate water generation = 0.12 L/s x 3600 s/hrs x 10 hrs/day x 0.8DF = 3456 Liter/day (3.5m3/day)

INNOVATION IN1 Innovation in Design & Environmental Design Initiatives

Waterless urinals (fitted to all male toilets)


STRATEGY To provide waterless urinals in all male toilets ADDITIONAL COST Urinal per floor Additional cost per urinal Additional Cost = 4 nos. = RM 500 = 38 x RM 500 = RM 19,000

INNOVATION IN1 Innovation in Design & Environmental Design Initiatives

System SiM Silicate Paint (light colour) Water base Acrylic Solvent base Acrylic / Silicone Paint Poly-Urethane

Unit Rate RM 19.00/MS RM 11.50/MS RM 14.00/MS RM 28.00/MS

Number of coats 2 coats 3 coats 3 coats 3 coats

Price difference VS SiM Paint In %

Life span 10 - 15 years

-39.5 % -26.3 % 47.4 % extra cost

2 - 5 years 3 - 5 years 4 - 7 year

INNOVATION IN1 Innovation in Design & Environmental Design Initiatives

Recycling of all fire system water during regular testing


-Water for the following fire fighting systems will be recovered during monthly testing either through drain pipe or a break tank:-The system identified are:Sprinkler System (OH1) Wet Riser System Hose Reel System

INNOVATION IN1 Innovation in Design & Environmental Design Initiatives

Other Innovations to be included: Refrigerant leakage detection and recycling facilities Auto Condenser Tube Cleaning System Non-Chemical Water Treatment for Cooling Tower

INNOVATION IN2 Green Building Index Accredited Facilitator

To provide at least one principle participant of the project team shall be a Green Building Index Accredited Facilitator

RETURN ON INVESTMENT

RETURN ON INVESTMENT AREA Base BEI Proposed BEI Different Tariff Amount save Total Amount Required Simple Pay Back 11,510 m2 175 kWh/m2/year 100 kWh/m2/year 75 kWh/m2/year 0.41 RM/kWh 353,932.50 RM per year 2,173,163.72 RM 6.14 year